BDforever
ELITE MEMBER
- Joined
- Feb 12, 2013
- Messages
- 14,387
- Reaction score
- 8
- Country
- Location
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Yes I understand the obvious difference of a complete ASW suit between them. I should have said 'Alvandv vis a vis it's successor Mowj'. I was considering the surface denial philosophy working behind them. Like after the enemy entered the radar/missile range, they lock the target and fire one/multiple missiles & use all the engines to make a dash out of the area. Like a bigger version of a FAC, just in this case much bigger.
You can read on this old Sinodefence thread on Mowj Class Visa a vis Alvand Class.That if you haven't already.
https://www.sinodefenceforum.com/iran-finally-launched-mowj-destroyer-read-corvette.t2960/
I don't see any ASW rocket launchers mounted on the BN C13 corvettesIt's very puzzling that the bow mounted sonar wasn't installed. In my book Surface Area Denial & ASW suit aren't mutually exclusive. Then again AFAIK they still has a haul mounted sonar. And there is the ASW rockets. How do they use them if they don't have any sonar? Really Puzzling.
Those are decoy/chaff/flare launchers. They are situated on the flanks, next to the stack, just in front of where the 30mm cannon are. You can just make them out in the pick below. Note the stairs going down from the 30mm cannon, those tubes are right next to those stairs.bro check this at 5:40 min, i am not sure what is it.
Those are decoy/chaff/flare launchers. They are situated on the flanks, next to the stack, just in front of where the 30mm cannon are. You can just make them out in the pick below. Note the stairs going down from the 30mm cannon, those tubes are right next to those stairs.
Right in front of the red box with the white F on it, next to the stack.
A prospective "C-803" was erroneously promulgated as the export version of the YJ-83 by enthusiasts in the late-1990s. As yet, no such missile exists.C-803 isn't for export so far and only used for PLA. that's C-802 or little chance of C-802A.
according to SIPRI database, BD procuring for type 056 was C-802 AshM. not C-803. that's why may be bro penguin take them as C-802.
I ask @Nilgiri to throw light on this issue.
Actually which plan was announced which says 4,000 tonne frigate ?
such big post! !! such wow! ! !Lol what's the point. They are in for a pretty nasty shock I'll say that. There are some nice early signs already I was only expecting to start from after 2020. Can watch the rest of this year and the next to see what I mean.
They think pure loan-driven raw capacity increase will get them to X level down the road....with absolutely no idea what it takes to actually diversify production in an economy to shore it up organically. It all suits their politicians and bureaucrats just fine too (single source industry always best for dynasty preservation)....in return they can produce a few BBS numbers here and there for "health" and whatever else can be manipulated easily. In the end all sides lie to each other and will be left with squat in the end....Harvard study hinting at this big time, WEF already hinted at it before....but these dummies wont even believe IMF and World Bank when they come around. Another 1971 level moment needs to arrive for these deluded POS's to realise what was going on in reality. They have absolutely no idea what the limits of GCF driven growth is (when that GCF is not diverse neither private credit driven enough)
The inconvenient truth of BD lies in the high quality foreign investment into broad based economic sectors. Its close to 0 for a very long time, even worse BD unable to invest outside its borders to gain access to any sunrise sector either. Their banking and liquidity going to fail them big time in the long run, because they are run so badly and there is 0 reform and renewal taking place. This is why you will see threads about Walton accomplishing this and that in just 2 years time, but when the 2 years comes, suddenly its all further projections and diversions, instead of the cold hard numbers to compare reality. This will only get worse with time as BD gets further under the grip of just one political party which then has little motivation to genuinely reform anything and has hosts of political allied people to give bureaucratic seats for x y z reason other than merit.
I am completely leaving state of BD human capital out of it too....purely what can be done with what they have/inherited being terribad....because of the same BD attitude we see among members here amplifying and refining among their elite, bureaucrats and overall govt.
such big post! !! such wow! ! !
He is just pissed we don't hire some expert from Madras to improve our human development goals. Well - ain't happening. Because
Because in most Indian states they have accepted it as fact that their poor will never improve, so they don't even try....
hey don't give a hoot about improving the health or education level of their population. It's all theory and no Goddamn action, yeh hai mera India
Bangladesh is building 100 SEZ's of five hundred plus acres. Mirsharai will be 10,000 acres.
In three Southern states combined (TN, Karantaka and Andhra), their SEZ's barely exceed 100 and they are mostly IT/backoffice related except automotive.
So what happens when Bangladesh catches next IT wave?
First build a SEZ comparable in operations to Sri City in Andhra Pradesh, then talk.
MEZ has a land area 30,000 acre out of which 10,000 acre getting developed. One BD company bought 500 acres of land yesterday for their factory. This is 1 out of 100 SEZ being developed.
Sri city got 2700 acre of SEZ land.
Ya right with 1.5 billion dollar total investment Sri City is hell of a icon in South Asia.Yawn...come back when you have actually started operations that are comparable to it. At present, it seems that Sri City produces more automobiles than your entire country....
Ya right with 1.5 billion dollar total investment Sri City is hell of a icon in South Asia.
There are already 10 billion dollar investment proposal (25 billion in pipeline) with down payment for MEZ. It is not in the paper its already a done deal.
such big post! !! such wow! ! !