BDforever
ELITE MEMBER
- Joined
- Feb 12, 2013
- Messages
- 14,387
- Reaction score
- 8
- Country
- Location
Uh...so how is the progress? i won't be surprised if it met a halt, because of reasons...
messing with army
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Uh...so how is the progress? i won't be surprised if it met a halt, because of reasons...
messing with army
This picture of LCVP made in Bangladesh was uploaded before with an odd angle that was very funny, indeed, which caused the hypocrite Indians to joke page after page. The current picture is quite good. Thing is, this boat is not meant for a sea voyage. It is meant for shallow river water and the boat is built to serve that purpose. So, so far we have built two FACs and one LCVP for our military. Shortly, our docks will build two stealth missile corvettes.
The angle of aim shows it kills tanks or artillery.
Do you mean to say the project has been already completed as was planned? Now it is already 2013.
I do not believe so. You see, there is no talks about this in govt. or no TV coverage nor in Anirban program. If there was any, AL govt. would have at least mentioned it in public to show their credit. I believe that project was cancelled in favor of MBT-2000. Also, Bangladesh Army do not have 300 Type-59 Tank. According to Siipri, 80 Type-59/69/79 tanks bade it to Bangladesh.
1. TV coverage only comes when Armed forces disclose something, our Armed forces normally do not disclose everything. there are many examples about it. AL govt or any govt. in BD will not disclose, people do not appreciate it rather criticize it, $1B arms deal is an example of it.
2. MBT2000 and Type-59 are different things.
3. if we consider SIPRI bangladesh only has 80 59/69/79 and 44 MBT200 = 124 battle tanks
Well i heard different stuffs. The cost of the upgrade was supposedly way too much therefore the Army went for the new tanks
when a project starts all costs are calculated in the beginning, it is not like lets go and upgrade or make new things, it is how a project works.
Welcome to Bangladesh
not really, army case is different.
1. TV coverage only comes when Armed forces disclose something, our Armed forces normally do not disclose everything. there are many examples about it. AL govt or any govt. in BD will not disclose, people do not appreciate it rather criticize it, $1B arms deal is an example of it.
2. MBT2000 and Type-59 are different things.
3. if we consider SIPRI bangladesh only has 80 59/69/79 and 44 MBT200 = 124 battle tanks
The following report says of 300 Type-59 MBTs to be upgraded. I believe, it is already complete or will be completed shortly. It is preposterous to say just like all other civilian departments our military also cannot do a pre-work cost calculation of a project.
The you tube describes all the features of modifications. I have been hearing about the improvement project since a long time and I do not think there is any reason to discard 300 tanks that can be upgraded in favor of buying only 44 MBT-2000 tanks. Even a civilian AL govt will not dare to stop such a BA project only because PA technicians will help the project. AL knows where to spit their venom.
Bangladesh Army's Type 59 Main Battle Tank Upgrade Project - YouTube
Bangladesh Army's Type 59 Main Battle Tank Upgrade Project - YouTube