Muhammad Omar
ELITE MEMBER
- Joined
- Feb 3, 2014
- Messages
- 13,558
- Reaction score
- 15
- Country
- Location
Azadi Chowk
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Aerial View of the new Azadi Chowk Interchange ... Completed in record time of 165 days ... On average, over two hundred thousand vehicles will daily pass through this junction, saving fuel of Rs 9 million per annum.
Why does a flyover need inauguration that is essentially a wasteful ceremony? what is with Pakistanis? Politicians , Military Leaders.. all need to plant that damn plaque and waste time instead of doing something useful.
I still cant figure out why is this whole thing in the air? if this whole thing was on level 0, what other traffic it could have stopped? doesnt make sense.
leave the inauguration. just figure out why is this flyover even flying?
I still cant figure out why is this whole thing in the air? if this whole thing was on level 0, what other traffic it could have stopped? doesnt make sense.
leave the inauguration. just figure out why is this flyover even flying?
I still cant figure out why is this whole thing in the air? if this whole thing was on level 0, what other traffic it could have stopped? doesnt make sense.
Are you civil engineer (bridge engineer) bhai?
The reason I asked is that bridge/road design in 21st century is very complicated process.nope. just trying to get some commonsense for my head
The reason I asked is that bridge/road design in 21st century is very complicated process.
The best thing is to ask and expert before forming an opinion contrary to the existing one.
Or at least get a hold of feasibility studies and they should provide some kind of alternatives considered and then the final design selected.
On PDF and in our society, we get angry and frustrated based on incomplete or inaccurate info.
Which should not be the case.
Hope you understand.