Station | Community | Location | Capacity (MW) | Status |
---|
Kohala Hydropower Project | Muzaffarabad, Azad Kashmir | | 1,124 | Ready to be constructed in 2020.[25] |
Azad Pattan Hydropower Project | Sudhanoti, Azad Kashmir | | 700 | Ready to be constructed in 2020.[26] |
Balakot Hydropower Project | Mansehra, Khyber Pakhtunkhwa | | 300 | Ready to be constructed in 2020.[27] |
Athmuqam Dam | Athmuqam, Azad Kashmir | | 350 | Ready to be constructed. Korea Hydro & Nuclear Power Corporation won the contract for construction.[28] |
Toren More Project | KPK | | 35 | Ready to be constructed. Sinohydro Corporation China and Sichuan Energy Industry Investment Group Co. Ltd. China won the contract for construction.[29] |
Turtonus-Uzghor Dam | Chitral, KPK | | 58 | Ready to be constructed. Sinohydro Corp Ltd and Sachal Engineering Works Private Ltd won the contract for construction. |
Lower Spat Gah hydropower project | Kohistan, KPK | | 496 | Ready to be constructed.[30] |
Arkari Gol Hydropower Project | Chitral, KPK | | 99 | Ready to be constructed.[31] |
Taunsa Barrage Hydropower Plant | Muzaffargarh, Punjab | | 120 | Ready to be constructed.[32] |
Chianwali Hydropower Project | Gujranwala, Punjab | | 5.38 | Ready to be constructed.[33] |
Deg Outfall Hydropower Project | Gujranwala, Punjab | | 4.04 | Ready to be constructed.[33] |
Okara Hydropower Project | Gujranwala, Punjab | | 4.16 | Ready to be constructed.[33] |
Chashma Hydel Power Project | Mianwali, Punjab | | 5.0 | Ready to be constructed.[34] |
Mahl Hydropower Project | Azad Kashmir | 34°55′N 73°34′E | 590 | Ready to be constructed. China Three Gorges Corporation won the contract for construction.[35] |
Nekherdim-Paur Dam | Chitral, KPK | | 80 | Ready to be constructed. CTG won the contract for construction.[36] |
Chakothi-Hattian Hydropower Project | Muzaffarabad, Azad Kashmir | | 500 | Ready to be constructed. Chinese firm won the contract for construction. |
Hanzel Hydropower Project | Hanzel, Gilgit | | 20 | Ready to be constructed. Cost estimate $63 million.[37] |
Kalam Asrit | Kalam, KPK | | 197 | Ready to be constructed. KPK government signed MOU with Korea’s state-owned M/S Korea South East Power Company. Cost estimate $500 million.[38] |
Nai Gaj Dam | Dadu, Sindh | | 4.2 | Ready to be constructed. |
Ghowari Hydropower Project | Gilgit-Baltistan | | 30 | Ready to be constructed. Cost estimate $80 million.[39] |
Tarbela Dam Extension-V | Tarbela, KPK | 34°05′23″N 72°41′54″E | 1,410 | Ready to be constructed. Cost estimate $796 million.[40][41] |
Bara Dam | Tirah, Khyber Agency | | 5.8 | Ready to be constructed.[42][43][43][44][45] |
Bunji Hydropower Project | Astore District, Gilgit-Baltistan | 35°39′N 74°36′E | 7,100 | Ready to be constructed. MOU signed with China’s National Energy Administration.[46] Cost estimate $6.8 billion.[47] |
Patan hydropower Project | Patan Village, Indus River | | 2,400 | Ready to be constructed. MOU signed with China’s National Energy Administration.[43][44][45][48] Cost estimate $6 billion.[49] |
Harpo Hydropower Project | Skardu, Gilgit-Baltistan | | 34.5 | Ready to be constructed.[50] |
Thakot Hydropower Project | Battagram District, KPK | 34°45′N 72°55′E | 4,000 | Feasibility studies to be completed by Dec 2017. MOU signed with China’s National Energy Administration[43][44][45] Cost estimate $6 billion.[49] |
Phandar Hydropower Project | Ghizer District, Gilgit-Baltistan | | 81 | Detailed engineering design or tender of documents under process.[42][45] Cost estimate $128 million .[49] |
Basho Hydropower Station | Skardu, GB, Indus River | | 28 | Detailed engineering design or tender of documents under process.[42][43] Cost estimate $40 million.[49] |
Tank Zam Dam | Hinis Tangi, KPK, Tank Zam River | | 25.5 | Feasibility studies completed.[43] Cost estimate $234 million.[47] |
Hingol Dam | Lasbela District, Hingol River, Balochistan | | 3.5 | Feasibility studies completed. Cost estimate $311 million.[47] |
Akhori Dam | Akhori, Punjab, Haro River | | 600 | Feasibility studies ongoing. Cost estimate $1.6 billion.[49] |
Middle Palas hydropower project | Kohistan, KPK | | 373 | Feasibility studies ongoing.[43][44][45] Cost estimate $763 million.[47] |
Upper Palas hydropower project | Kohistan, KPK | | 160 | Feasibility studies ongoing.[43][44][45] Cost estimate $763 million.[47] |
Madian Hydropower Project | Swat, KPK, Swat River | | 157 | Feasibility studies ongoing.[51] |
Shushai-Zhendoli Hydropower Project | Chitral, KPK | | 144 | Financing is being arranged for these projects by selling shares in the existing projects.[52] |
Shogosin Hydropower Project | Chitral, KPK | | 132 | Financing is being arranged for these projects by selling shares in the existing projects.[52] |
Latambar Dam | Karak District, Khyber Pukhtunkhwa | | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Mairoobi Dam | Nowshera District, Khyber Pukhtunkhwa | | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Jaroba Dam | Nowshera District, Khyber Pukhtunkhwa | | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Naran Dam | Mansehra District, Khyber Pukhtunkhwa | | 188 | EOI invited.[53] |
Gorband Hydropower Project | Shangla District, KPK | | 14 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53][54] |
Nand Bahar Dam | Battagram District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Mojigram Shagoor Dam | Chitral District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Astar Rabooni Dam | Chitral District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Arkari Gol Dam | Chitral District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Shringal Dam | Upper Dir District, Khyber Pukhtunkhwa | | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Patrak Barikot Dam | Swat District, Khyber Pukhtunkhwa | | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Segokatch Dam | Chitral District, KPK | | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] |
Taunsa Hydropower Project | | | 135 | IPP, RFP has been accepted.[55] |
Shigo Kas Hydropower Project | | | 102 | EOI invited.[55] |
Bata Kundi Hydropower Project | | | 96 | EOI invited.[55] |
Ghorband Khwar Hydropower Project | | | 21 | EOI Iinvited.[55] |
Nandihar Khwar Hydropower Project | | | 12 | EOI invited.[55] |
Winder Dam | Lasbela District, Winder River, Balochistan | | 0.3 | Proposed. Cost estimate $148 million.[47] |
Daraban Zam Dam | Dera Ismail Khan, KPK, Khora River | | 0.75 | Proposed. Cost estimate $69 million.[47] |
Ghabir Dam | Ghabir River | | 0.15 | Proposed. Cost estimate $121 million.[47] |
Papin Dam | Rawalpindi District, Wadala Kas | | 0.3 | Proposed. Cost estimate $101 million.[47] |
Rajhdani Dam | Kotli District, AJK Poonch River | | 132 | EOI invited.[36] |
Gabral Kalam | Kalam, Khyber Pakhtunkhwa | | 101 | LoS issued. |
Bhadi Dhoba Hydropower Project | Haveli District | | 1 | Proposed. |
Galeter Hydropower Project | Kotli District | | 1 | Proposed.[56] |
Saridoa Cross Hydropower Project | Bhimber District | | 1.7 | Proposed. |
Chamfall Hydropower Project | Hattian District | | 6.4 | Proposed.[56] |
Guddu Hydropower Station | Kashmore, Sindh | | 33 | Proposed. |
Harighel Hydropower Project | | | 53 | Proposed. |
Sehra Hydropower Project | Azad Kashmir, Poonch River | | 130 | Proposed. |
Nagdar Hydropower Project | Neelum, AJK, Jagran River | | 25 | Proposed.[57] |
Duwarian Hydropower Project | Hattian Bala, AJK, Jagran River | | 29 | Proposed.[57] |
Asrit-Kedam Hydropower Project | Kalam, KPK, Swat River | | 215 | Proposed. |
Karang Hydropower Project | | | 458 | Proposed. |
Shogo-Sin Hydel Dam | | | 132 | Proposed. |
Shushgai Zhendoll | | | 144 | Proposed. |
Yogo, Pakistan | | | 500 | Proposed. |
Thor Hydropower Project | | | 3.6 | Proposed.[47] |
Yulbo Hydropower Project | | | 3000 | Proposed.[49] |
Shyok Hydropower Project | | | 520 | Proposed.[49] |
Tungus Hydropower Project | | | 2200 | Proposed.[49] |
Skardu Dam | Skardu | | 1600 | Proposed.[49] |
Dudhnial Hydropower Project | | | 960 | Proposed.[49] |
Kundal Shahi Hydropower Project | | | 960 | Proposed.[49] |
Trappi Hydropower Project | | | 32 | Proposed.[49] |
Nandihar Hydropower Project | Battagram, Khyber Pukhtunkhwa | | 10 | Proposed.[54] |
Mujigaram Shagore Hydropower Project | Chitral, Khyber Pukhtunkhwa | | 51 | Proposed.[54] |
Istaro Booni Hydropower Project | Chitral, Khyber Pukhtunkhwa | | 52 | Proposed.[54] |
Katzarah dam | Skardu, Gilgit-Baltistan | | 15000 | Proposed.[58] |
Arkari Gol Hydropower Project | Chitral, Khyber Pukhtunkhwa | | 79 | Proposed.[54] |