-Phase-1 contains development of illumination radar and non-rotating IFF system.
-Phase-2 contains development of long range surveillance&Multifunctional radars.



Huge Radar complex of TF-2000 AAW frigate are formed with 4 surface which provides 360 degree surveillance/detection/tracking and identification. Each surface has 3 different scale of radar system.

Cafrad general design
cafrad-1.jpg



CAFRAD ÇFR
cafradmulti-fnctionradar.jpg



CAFRAD AYR Illmination radar
cafradillumination.jpg



CAFRAD UMR (Long range surveillance radar)
longrangesurveillanceradar.jpg



CAFRAD Electronic scanning IFF antenne
cafrad1310ffantenne.jpg




With completion of program (2016-17), TF-2000 frigates will be able to counter coming ballistic missiles, aircrafts, cruise missiles and many other s from long ranges. Coverage area of CAFRAD would be similar to the image presented under.

893623A46HYS2CIAAcaxo1.jpg
 
. . . . . .
Hey @Neptune how much do one of these cost ?

The TF-2000 project aims to
provide the Turkish Naval Forces
with up to six frigates at an
estimated cost of between $.6
billion and $3 billion, with entry
into service planned from around
the end of the decade. The locally
built frigate design, expected to
displace more than 6,000 tonnes,
will have a strong anti-air
warfare bias centred on a
multifunction radar and a
medium-range area air-defence
missile system.
The SSM was unable to progress
the program to the next stage
until the Turkish Naval Forces
completed an assessment of
which version of Raytheon's
Standard Missile would be most
suitable for the new frigate. This
assessment has now been
concluded, with the navy opting
to continue with the SM-2.
Due to the large scope of the
program, a decision has been
made to split it into three
phases, beginning with a
design phase, followed by
construction of a prototype
ship, and then finally serial
production.

SOURCE: http://www.defence.pk/forums/turkey-defence/19367-turkish-tf-2000-aaw-ffg-updates-discussions-5.html


....................

Yara, according to that statement, each ship will cost about 1 billion USD. But the price may will likely change. Because DzKK is still shy on some armements like wheater which missile will be used on air-defence. The price's concluded as SM-2 while the Navy is still in talks with Raeython's SM-3 and France/Italy's Aster.
 
Last edited by a moderator:
.
Özel Durum Açıklaması (02.08.2013) ASELSAN ile Savunma Sanayii Müsteşarlığı arasında Çok Amaçlı Faz Dizinli Radar Projesi Konsept Gösterim Fazı (ÇAFRAD Faz-1 Projesi) ile ilgili olarak 200.000.000,- TL tutarında bir sözleşme imzalanmıştır. Söz konusu sözleşme kapsamında teslimatlar 2014-2018 yıllarında gerçekleştirilecektir. Bu açıklama Savunma Sanayii Müsteşarlığı'nın 2 Ağustos 2013 tarihinde şirketimize ulaşan iznine istinaden yapılmıştır.
Summary in English;
A contract worth 200'000'000 TL [~ $103'702'200 USD] has been signed between ASELSAN and SSM [Undersecretariat for Defence Industries] regarding the 1st phase of the ÇAFRAD project. The deliveries will occur between 2014-2018.
 
. . . .