Hmm, how is it going? The IA still rejecting it and insisting on imports?
It was all started in 2012, DRDO develop first prototype in 2 years which having significant improvement over mk-1, so call it mk-1A rather mk-2. Now things are smooth with the real mk-2, soon we will see upgraded designs(eg: with new turret in production by OFB & RInfra). Army buying more ARRV hints arjun programme going well, especially for arjun mk-1.
 
.
It was started in 2012, DRDO develop first prototype in 2 years which having significant improvement over mk-1, so call it mk-1A rather mk-2. Now things are smooth with the real mk-2, soon we will see upgraded designs(eg: with new turret in production by OFB & RInfra). Army buying more AARV hints arjun programme going well.
no exports,even indian army is trusting more on t-90s than local stuff so hence it's 'ar-junk'.Enjoy..


MOD EDIT: Language please
 
Last edited by a moderator:
. .
I mean to upgrade.They are in deal with Russia to upgrade their atleast 1000 t-90s out of total of 1400 I think.
After decades, they still can't make parts for T90? I mean why not upgrade themselves if they have 'arjun' tech and the miraculous TOT?
 
.
tINyYII.jpg


The current Mark 2 is now labeled - Mark1A. The newer modeled with redesigned hull, lighter materials, etc. being produced now by Reliance and OFB will be the new MARK2.
 
.
tINyYII.jpg


The current Mark 2 is now labeled - Mark1A. The newer modeled with redesigned hull, lighter materials, etc. being produced now by Reliance and OFB will be the new MARK2.

It was all started in 2012, DRDO develop first prototype in 2 years which having significant improvement over mk-1, so call it mk-1A rather mk-2. Now things are smooth with the real mk-2, soon we will see upgraded designs(eg: with new turret in production by OFB & RInfra). Army buying more ARRV hints arjun programme going well, especially for arjun mk-1.

I said that when there were no reports of mk-1A in media :cool:
 
. .
Army accepts ‘Mark1-A’ version of Arjun tanks

An upgraded version of the Arjun tank, having better firing and mobility, has been accepted by the Army following month-long validation trials in Rajasthan.

The trials were completed in December last and a report has followed. The Army is looking at 118 pieces of the new version. In 2010-11, the first version of the Arjun had joined the Army and 124 pieces had been ordered.

The production of the new version, dubbed as Arjun ‘Mark 1-A’, is likely to commence within this year at the existing facility at Avadi in Tamil Nadu. It has a total of 14 upgrades over the existing version. These include an auto-target tracker, automatic gear system and improvement in suspension.

Only the missile firing ability remains to be validated, which will be done once the missiles, being developed by the DRDO, are ready. The DRDO missile programme has been a major success and firing of missile from a tank is being fine-tuned.

As part of the arrangement with the Army, the DRDO has promised to set up a system to maintain the Arjun within India. It will be an annual maintenance contract with one of the PSUs such as Bharat Earth Movers Limited.

The tanks, as part of the trials, have already done some 4,000 km of run. The upgraded Arjun has a 120mm rifled gun capable of firing a full range of high explosives, laser homing anti-tank (LAHAT) missile that had a tandem warhead, which is capable of defeating all types of modern armour.

In December last year, the Ministry of Defence had informed Parliament that the ‘Arjun Mark 1-A’ was being validated at trials. This was the first official confirmation that the ‘Mark 1-A’ will be an additional version of the tank till the ‘Mark 2’ version, somewhat lighter in weight, is readied and accepted.

The development shows that the MoD is ready to keep on improving the Arjun, be addition of more power or wanting the weight to be reduced. The Army was okay with the ‘Mark 1-A’ version, but wants the next version to be lighter than its present weight of 68 tonne. Most modern European tanks are of the same weight, and tank-transporters (specialised trucks) for Arjun are available to ferry it.

The ‘Mark 2’ will have to be lighter by some 3 tonne. This may require some modification in the hull of the tank for the final contours to emerge.

https://www.tribuneindia.com/news/nation/army-accepts-mark1-a-version-of-arjun-tanks/730651.html
 
. . . . . . . .