What's new

And now Punjab government's Solar power project flops !

Oh Bhai.... In Summer the sun remain in the sky for like 15 hours and from that 15 hours the energy production of 100 MW plant will be 88 MW

The anchor is telling average Per day (including Day/night) MW generation of 100 MW
PV cell of plant only produce Electricity when the sun is shining


here is the Power generation of USA Solar power plant

Probably not, but Solyndra was all over the news media for a while. There’s a blatant lack of coverage for solar success stories, so it wouldn’t be surprising if most people aren’t hearing about them. California’s Topaz project is the largest solar power plant in the world with a 550 MW capacity, and it is now in full operation. It is located in San Luis Obispo County and has 9 million solar panels. Construction began just two years ago.

The electricity produced by the plant will be purchased by Pacific Gas and Electric. The solar panels were manufactured by First Solar and the project was developed by First Solar.

SEIA says about 200 homes in California are powered for each MW of solar power capacity. So, for a 550 MW solar plant, about 110,000 homes could be powered when the sun is shining.First Solar has said this figure could be 160,000 homes in the case of Topaz.

The San Luis Obispo county population is about 276,000. It might turn out that the majority of this population could be powered by a single solar power plant.

Energy storage is a growing field, so it eventually might be that excess electricity generated by solar power could be stored for nighttime use and for overcast days, extending the impact of Topaz even further.

Using the electricity created by this huge solar plant rather than fossil fuels will prevent the generation of about 377,000 tons of CO2 annually. It will also not produce harmful air pollution the way coal power plants do.




and yeah Please Do enlighten me about the how Sahiwal Coal power Project has failed

and How many MW did Billo Rani and his Party added from 2007 to 2013...

It all depend on the timing of the Sun in Summers it's 15-16 hours

Photovoltaic solar plants work like this:

solar_pv_works.jpg

As light hits the solar panels, the solar radiation is converted into direct current electricity (DC). The direct current flows from the panels and is converted into alternating current (AC) used by local electric utilities. Finally, the electricity travels through transformers, and the voltage is boosted for delivery onto the transmission lines so local electric utilities can distribute the electricity to homes and businesses.


The capacity factor for this qaideazam plant is likely to be somewhere around 15-20%. meaning that this 100MW plant will produce roughly 20MW in reality.
 
. .
Asking Jayala about how are they producing 3000 MW and Name of the Plants PPP Gov made in 2007-2013

Answer Patwari league pig meat eater oinking here

For your answer
10422907_595947280542569_1489395978217574653_n.jpg
 
. .
Qalandari tum apni chus maarni band karo... atleast kuch kaam to hrha..tmne to sindh ka naqsha bigaar dia hai PPP k chamche
 
.
Solar 100 MW plant is way to go lets make it 1000 MW

Kamran ka to kaam hi , manhoosiyat phelana hai

Shakal hi manhoos hai her waqat , heart attack ki news report deta hai kabhi achi khabar nahi deta


WORLD HAS GONE SOLAR POWER DIRECTION this kamran khan ka dimagh kharab hogiya hai mafia ka pressure group hai
 
Last edited:
. .
sempras-coppermountainsolar6-101.jpg


US is stupid to invest in solar lol

PETROL MAFIA in Pakistan does not wants growth of solar energy in region


Aur germans ko kute ne kata hai , why they are making solar plants

e1990f77-0498-4b3a-9646-6c37c1d9acfe-2060x1236.jpeg



And Spanish ne bhi Qalandri ke sindh ki Ghans kha rakhi hai

111003025931-solar-power-spain-gemasolar-story-top.jpg



Sindh ka Benazir shaheed Power plant station
Marg_grass_comp_crop.JPG
 
Last edited:
.
From 2008 to 2012 PPP government added more than 3000 MW.

Screen%20Shot%202015-09-10%20at%2022.31.30_zpsqg5brmpf.png




Screen%20Shot%202015-09-10%20at%2022.32.06_zps7gueeosp.png
 
. .
From 2008 to 2012 PPP government added more than 3000 MW.

Screen%20Shot%202015-09-10%20at%2022.31.30_zpsqg5brmpf.png




Screen%20Shot%202015-09-10%20at%2022.32.06_zps7gueeosp.png

haramkhoron..corruption k alawa bhasha,bunji,dasu mai se ik dam he bana lete 5 yrs mai to oil k itne plant na lagane parte.. pooray mulk ko kha gae bhutto zinda hai magar.. poora mulk bech dala.. qalandari k gher wale b bik jaenge phir b ye kahega bhutto zinda hai
 
.
3000 MW , sindh main every one says there is no electricity , koi khak kam kiya hai

Wo raja rental bhi PPP ka banda tha

Let me know if you have anything constructive to contribute apart from rhetorics.

haramkhoron..corruption k alawa bhasha,bunji,dasu mai se ik dam he bana lete 5 yrs mai to oil k itne plant na lagane parte.. pooray mulk ko kha gae bhutto zinda hai magar.. poora mulk bech dala.. qalandari k gher wale b bik jaenge phir b ye kahega bhutto zinda hai

LOL typical PPP hater style oinking.
 
.
+ NADI poor power project is just being , handed over to different company for management
in large multi million dollar project this sometimes happens , Natural process

+ Qauid-e-Azam , power plant is providing free round the year electricity to zero dollar extra
expense to national treasury 1000 MW will provide , FREE electricity yearly to Pakistan

+ CPEC we all have seen how much $$$ is coming into Pakistan (42 Billion investment)
PPP ne kitne investment liye thi when they had government ??? Don't remember


PPP , the only thing they have contributed is
a) Load sheding
b) Opposition to building Kala Bagh dam
c) Target killings in Sindh


Sindh gets one flood and all the cheap PPP projects get washed away every year
 
. . .

Latest posts

Pakistan Defence Latest Posts

Back
Top Bottom