PN's Plan should be be 1st Agosta-90B from France, 2nd and 3rd would be assembled, 4th and 5th would be manufactured and last 6th and 7th one too.
1st Agosta-90B:1999
2nd and 3rd Agosta-90B:2001
4th and 5th Agosta-90B: 2004
6th and 7th Agosta-90B: 2007
All this can be achieved by utilizing the two shipyards. Although we have two dry docks as well for other ships maintenance but I also would like to say that if PN has taken some bold decisions in 1999/2000 like making a third shipyard at KE&SWs along with a third dry dock as well and upgrading the whole facility. Also setup a plan in 1999 to upgrade Agosta-70s to a similar Subtics level as Agosta-90B to remain in service till 2015 then the situation now will be totally different.
Also in the means time PN can put some money in JV with France like 25-30% share in Scorpion Program in 2000 along with Andrasta to add another 7 submarines starting its manufacturing in 2007 and completing in 2015 along with 5 Andrasta Submarines too. And then moving towards Merlin Program to field another 7 of these and developing another Block-II of ANDRASTA to field the fleet.
1st Agosta-90B:1999
2nd and 3rd Agosta-90B:2001
4th and 5th Agosta-90B: 2004
6th and 7th Agosta-90B: 2007
All this can be achieved by utilizing the two shipyards. Although we have two dry docks as well for other ships maintenance but I also would like to say that if PN has taken some bold decisions in 1999/2000 like making a third shipyard at KE&SWs along with a third dry dock as well and upgrading the whole facility. Also setup a plan in 1999 to upgrade Agosta-70s to a similar Subtics level as Agosta-90B to remain in service till 2015 then the situation now will be totally different.
Also in the means time PN can put some money in JV with France like 25-30% share in Scorpion Program in 2000 along with Andrasta to add another 7 submarines starting its manufacturing in 2007 and completing in 2015 along with 5 Andrasta Submarines too. And then moving towards Merlin Program to field another 7 of these and developing another Block-II of ANDRASTA to field the fleet.