AerospaceEngineer
BANNED
- Joined
- Jan 12, 2011
- Messages
- 680
- Reaction score
- 0
Can't wait for the Type 052D.
The Type 052C+ should also be going through extensive testing by now.
I have been reading Sino defence fourm for a while now. IT IS GREAT!!
Regarding 052D, according to them, and I believe. Will be build in 2012. Two will be build and go through many testings, after about 2 years of sorting out problems, it will be mass produced like 052C++.
Right now 4 052C++ are being build at the same time and will be lunched in late 2011 at the same time.