What's new

AL-KHALID II Is In Development "Reality Not Dream"

The Al Khalid 2 system really has to be a new Next generation technology system introduced to evade incoming missiles from air or projectile evasion. Otherwise Al Khalid 1 itself is sufficient

Just merely increasing the Shell or slight improvements in metal sheilding or other parameters won't be impressive enough

Next Generation Tank Needs to have some hardcore realities of real modern Warfare integrated into its design you really need to "ADD these in"

a) Threats from Anti Tank
b) Growing threats from Air Missiles
c) Dealing with Laser based weapons
d) Radar evasion or some level of stealth


The mere improved engine would be a minor parameter improvement in my opinion
 
Last edited:
.
The Al Khalid 2 system really has to be a new Next generation technology system introduced to evade incoming missiles from air or projectile evasion. Otherwise Al Khalid 1 itself is sufficient
Pakistan should bring Turkey in for that. Engine should be taken from Ukraine and other parts can be taken from Turkey or the ones used in Altay As for Anti Missile system. Well KRL and ROKETSAN of Turkey should jointly develop that.
 
.
Time to get those remote operated firing stations all over the perimeters of bases.
Bhai tera Altay urr gya pka pka.... :D
Pakistan should bring Turkey in for that. Engine should be taken from Ukraine and other parts can be taken from Turkey or the ones used in Altay As for Anti Missile system. Well KRL and ROKETSAN of Turkey should jointly develop that.
AK2 will likely have components from Turkish Altay ....
I wish to see Akkor APS on AK2 .
 
.
Bhai tera Altay urr gya pka pka.... :D

AK2 will likely have components from Turkish Altay ....
I wish to see Akkor APS on AK2 .
So Turkey already has active protection system well than we should put it on AK 2 and do it soon.
 
.
So Turkey already has active protection system well than we should put it on AK 2 and do it soon.

There was already speculation that some Turkish systems would be used in AK2. Either way the design would have to be changed too a little I'm guessing.
 
.
There was already speculation that some Turkish systems would be used in AK2. Either way the design would have to be changed too a little I'm guessing.
There are chances that AK 2 could turn out to be completely new Tank with new shape
 
.
There are chances that AK 2 could turn out to be completely new Tank with new shape

If that's the case then why call it AK? It's a completely new tank then. The basic design will surely be there. Just some adjustments. Its been said that AK2 will be 50-55 tons.
 
.
If that's the case then why call it AK? It's a completely new tank then. The basic design will surely be there. Just some adjustments. Its been said that AK2 will be 50-55 tons.

Yes that why if it turns out to be a different beast so when it's fully ready we should give it a new Name. I suggest Zubair named after Hazrat Zubair RA or named after famous Ashiq e RASOOL SAW Bilal Habshi we should name it Bilal.
 
.
Yes that why if it turns out to be a different beast so when it's fully ready we should give it a new Name. I suggest Zubair named after Hazrat Zubair RA or named after famous Ashiq e RASOOL SAW Bilal Habshi we should name it Bilal.

Why not name it after Muhammad bin Qasim? :D
 
.
Yemişçiler also stated that Aselsan is “actively working” in the al-Khalid main battle tank (MBT) program and has been doing so for over 10 years. In tandem with outlining Aselsan’s expertise in upgrading MBTs, Aselsan is actively promoting its onboard electronics suite comprising of fire control, electro-optical, and communications systems for use on the al-Khalid II MBT, the first major iterative update of the al-Khalid.


http://quwa.org/2016/11/25/aselsan-eager-to-expand-activities-in-pakistan/?platform=hootsuite
 
.
November 28, 2016
Al-Khalid-02-692x360.png



Daily Views
Nov 27, 2016Bilal Khan -
OVERVIEW: AL-KHALID 2 MAIN BATTLE TANK PROGRAM
ShareTweet


During the 2016 International Defence Exhibition and Seminar (IDEAS) in Karachi, Pakistani armed forces and Turkish defence industry officials shared details about the al-Khalid 2 main battle tank (MBT) program.

In the mid-to-late 2000s, the al-Khalid 2 was envisaged as a major update to the al-Khalid, which was itself intended to be the mainstay MBT of the Pakistan Army. However, strenuous finances amid the 2008 Global Financial Crisis, coupled with the decade-plus long counterinsurgency (COIN) campaign in the Tribal Areas, put the al-Khalid program into a much slower track in terms of procurement and development.

But with somewhat relative stability, it appears that the Army is comfortable with resuming its pursuit of big-ticket armaments, most notably an alternate dedicated attack helicopter to complement its upcoming Bell AH-1Z Vipers and new MBTs. In terms of the latter, the al-Khalid series will serve a central role.

At IDEAS, a Pakistan Army official told Army Recognition that the al-Khalid 2 will be powered by a 1,500 hp diesel engine, a notable upgrade from the 1,200 hp engine that powers the al-Khalid and al-Khalid 1 (a minor iterative update to the tank). The Kharkiv Morozov Machine Building (KMDB) 6TD-2 powers the al-Khalid today, and with Heavy Industries Taxila (HIT) signing a deal for 200 new engines from the Ukrainian supplier, the newly revealed 1,500 hp 6TD-3 would be a natural option for the al-Khalid 2.

The Turkish defence electronics giant Aselsan was also offering its next-generation electronics site, which comprises a fire control system, electro-optical sensor, and communications system, for the al-Khalid 2. Aselsan’s Regional Business Development Manager for the Middle East and Africa Oğuz Yemişçiler said that his company was “actively” involved in the al-Khalid program.

There is no guarantee that Pakistan would source the al-Khalid 2’s powerplant and internals from Ukraine and Turkey, respectively, but these two are the leading contenders (outside of China) in that they have the necessary technology as well as active interest for the program. The third broad area of development would be armour and design, particularly for the turret.

In armour, Ukraine could emerge as Pakistan’s leading partner. Malyshev Factory’s experience in armour technology is certainly extensive, and the input made in the Oplot-M could be of interest to the Pakistan Army for use on the al-Khalid 2. It is not known if the final design will exhibit a significant level of change, but depending on the Army’s finances, a leap as wide as the Polish T-72 to PT-16 upgrade is plausible.

Considering the al-Khalid 2, the fate of the Haider MBT program could be brought into question. However, the Haider MBT appears to had been envisaged to work in parallel with the al-Khalid 2. It is possible that the Pakistan Army intends to use the Haider as an operational and industry cooperation bridge, for the al-Khalid 2. For example, the Haider could be leveraged as an incentive for vendors, such as Malyshev and KMDB, to participate in the al-Khalid 2 and offer workshare and/or technology and expertise. In that vein, Ukraine and Pakistan did discuss the prospect of jointly manufacturing tanks and anti-tank guided missiles. This could be about the Oplot M and Haider.

http://quwa.org/2016/11/27/overview-al-khalid-2-main-battle-tank-program/
 
.
Just watch this video, AK-II is in Development , Its not a wish list or Fan boy or Day Dream.
Now MOU with Ukraine make more sense.
And also check other Stuff , lol They make AA automatic .:woot::woot:.......
And just check Remote Operated Weapon Station ..........................
View attachment 354964

And Ne HMG PK-16 Intro .....................:sniper::sniper:
And more , there are so many things ..........
:victory::victory::yahoo::yahoo::pakistan::pakistan::pakistan::pakistan:


@waz , @Tipu7 , @Zarvan , @WAJsal , @Windjammer , @Arslaan , @Bilal Khan (Quwa) , @Quwa , @DESERT FIGHTER , @Ulla , @MastanKhan , @shah1398 , @Dazzler and all other Pakistanis

Even some quite senior members didnt consider the prospects of AKII worth considering but here we are ALHUMDULILLAH seeing it becoming reality. Like I keep on saying that "I just love the way Pak Armed Forces keep things secret".
 
.
It is not that hard guys,,
1- Put your tank into a ship and send it to Turkey
2- Tell us to apply Leo NG-2 upgrade to your Al-Khalid
3- Voila
 
. .
Al-Khalid II has been in development since 2006. It was supposed to be revealed in 2012 but it still under going development.
 
.

Latest posts

Country Latest Posts

Back
Top Bottom