Ghazwa e Hind
BANNED
- Joined
- Sep 10, 2015
- Messages
- 869
- Reaction score
- 2
- Country
- Location
i also said that!its not about estimate OP says US will epair AWACS in $30m but our own engineers has done that job in $15m..
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
i also said that!its not about estimate OP says US will epair AWACS in $30m but our own engineers has done that job in $15m..
Well I hope so but at least I am happy that new AK version is confirmed so @kaonalpha Can you now try to get pictures of all AK and explain their features @Icarus @balixdi think AK2 was planned upgradation of AK1 with improved goodies ,AK3 would be different class altogether just like in case of block2 thunder .In my opinion all AK1 are AK2 with AK3 coming with all set of newer things.
Turkey want help from us us us really ?
Ak 3 ?
ak2 ko assman kha gaya ya zamin nigal gayi ?
And which category (a,b,c) of production they're offering us ?It is not help, but JV for TF-X project.
First resolve my problem as for Drone I think we would soon have bigger drone than Burraq soon
It's not on hold it never was that thread is wrong HIT guys have told senate that they are working AK 3 that is why I started this threadWe sure will get one. As far as AK2 goes I read AK2 project is on hold & there is a thread on this.
It's not on hold it never was that thread is wrong HIT guys have told senate that they are working AK 3 that is why I started this thread
That is exactly the questionThat's a great news, but if AK3 is under development then what happened or where is AK2?
There are two possibilities that AK II is under production while AK III has entered the final stage of development as the news uses the final stage of preparation....a vague term. Development takes a long time then prototypes are prepared and tested and tried in real conditions and labs until validation is achieved. After that the production design is prepared and production line is setup either a new or the one for AK II is upgraded to produce AK III. the second possibility is that they have scrapped the AK II in favour of AK III which is technically more advanced and more modern
Pakistan capable to manufacture all kinds of drones: Navy officials
ISLAMABAD: Pakistani Engineers have shown amazing performance and made AWACS aircraft, affected in Kamra attack, in half of the estimated cost, while Al-Khalid III has entered into last phase of preparations, whereas Turkey has sought help from Pakistan to manufacture fighter planes.
Lieutinent General Retired Abdul Qayyum chaired Senate Standing Committee for defence production. Committee was told in briefing that Pakistani Engineers have restored AWACS aircraft in a shorter period of 10 months locally. The aircraft was damaged in Kamra Air Base attack, while United States had estimated 30 million dollars for the restoration of aircraft, hence the aircraft has been made operation after spending 15 million dollars.
Committee was told that Al-Khalid III is in last phase of preparations. Committee was also briefed regarding preparations of JF-17 Thunder, saying that any kind of war weapon of any fighter jet can be used in JF-17 Thunder. Pakistan can manufacture 58 percent parts of JF-17 Thunder by itself.
Committee was told that feasibility has been completed regarding to manufacture shipyard of deep sea, for which the approval is on waiting from Prime Minister, while Pakistan is capable to manufacture any kind of drone.
Pakistan capable to manufacture all kinds of drones: Navy officials | Abb Takk News
HIT Taxila guys have told senate that work on AK 3 has entered its last stage. I have only one question where the hell is AK 2 ?
What my sources tell me is two prototypes of AK-2 are under trials since 2013 no idea on latest development and their statusThere are two possibilities that AK II is under production while AK III has entered the final stage of development as the news uses the final stage of preparation....a vague term. Development takes a long time then prototypes are prepared and tested and tried in real conditions and labs until validation is achieved. After that the production design is prepared and production line is setup either a new or the one for AK II is upgraded to produce AK III. the second possibility is that they have scrapped the AK II in favour of AK III which is technically more advanced and more modern
I really have no info about either AK II or AK III, I'm just talking about possibilities. As i know PA is looking for a modern tank and I won't be surprised that PA decides totally in favour of AK III. But soon time for me to hit the bed being on west coast for this week. Hope to see you and get some latest updated from youWhat my sources tell me is two prototypes of AK-2 are under trials since 2013 no idea on latest development and their status
That's a great news, but if AK3 is under development then what happened or where is AK2?