MilSpec
ELITE MEMBER
- Joined
- Feb 19, 2011
- Messages
- 12,931
- Reaction score
- 38
- Country
- Location
...if I was every to negotiate and accept an order to build something without having all the relevant details with me, I would be fired from my job. Funny thing is ...this is standard practice with HAL. They first accept any order and then go around trying to figure out how to execute it.
Now I feel like i'm arguing with an 8 year old. Bison,mki, jag all were built by HAL. The design, lead in prototype, production design were supplied by designated agencies. Rafales will be manufactured by HAL, does HAL already have all the designs ? similarly LCA will be manufactured by HAL, so whose responsibility is it to finish the design work....