What's new

Aircraft version of BRAHMOS missile by December: Pillai

sudhir007

SENIOR MEMBER
Joined
Jul 6, 2009
Messages
4,728
Reaction score
1
Aircraft version of BRAHMOS missile by December: Pillai - Brahmand.com

The aircraft version of supersonic BRAHMOS missile would be launched by December this year, a top official of the BrahMos Aerospace, an Indo-Russian joint venture company, has said.

The aircraft modification of Sukhoi-30 to attach the missile is being done in HAL and after proper reduction of weight and electronic interface and other various integration, the missile would be ready for launch by year end, A Sivathanu Pillai, CEO and MD of the company, told reporters at Ettimadai near the city outskirts.

When asked about production capacity, Pillai said the company is geared to produce any number of missiles for India's defence requirement and after fulfilling domestic needs, it would consider supplying to other countries.

The army had conducted a successful trial of the supersonic cruise missile recently, he said.

The 290-km range BRAHMOS supersonic cruise missile was test-fired at the Pokharan range in Jaisalmer on March 4, to operationalise the second regiment of the weapon system in service.

Asked on advanced hypersonic missile, he said research is going on to design and develop the 7 'Mach' speed missile.

Research has already started on propulsion of scram-jet engine and it will reach the final stage by another two years, Pillai said. The company would enter into another agreement of 50.5-49.5 ratio for this version.

When asked on Intercontinental Ballistic Missile, which was given prominence by China, he said it depended on the requirements of the individual country, as was done by India by developing four versions of Agni missile.

The Agni-5, with 5,000 km range, would be launched soon, Pillai said.
 
. .
Aircraft version of BRAHMOS missile by December: Pillai - Brahmand.com

The aircraft version of supersonic BRAHMOS missile would be launched by December this year, a top official of the BrahMos Aerospace, an Indo-Russian joint venture company, has said.

The aircraft modification of Sukhoi-30 to attach the missile is being done in HAL and after proper reduction of weight and electronic interface and other various integration, the missile would be ready for launch by year end, A Sivathanu Pillai, CEO and MD of the company, told reporters at Ettimadai near the city outskirts.

When asked about production capacity, Pillai said the company is geared to produce any number of missiles for India's defence requirement and after fulfilling domestic needs, it would consider supplying to other countries.

The army had conducted a successful trial of the supersonic cruise missile recently, he said.

The 290-km range BRAHMOS supersonic cruise missile was test-fired at the Pokharan range in Jaisalmer on March 4, to operationalise the second regiment of the weapon system in service.

Asked on advanced hypersonic missile, he said research is going on to design and develop the 7 'Mach' speed missile.

Research has already started on propulsion of scram-jet engine and it will reach the final stage by another two years, Pillai said. The company would enter into another agreement of 50.5-49.5 ratio for this version.

When asked on Intercontinental Ballistic Missile, which was given prominence by China, he said it depended on the requirements of the individual country, as was done by India by developing four versions of Agni missile.

The Agni-5, with 5,000 km range, would be launched soon, Pillai said.

:chilli::chilli::chilli::chilli:
 
. .
the Brahmos is not manufactured by the DRDO mate but by the Brahmos cooperation .
 
.
i am not going to trust DODO until they deliver final product on time and to military.This is big mouth agency of india
 
.
i am not going to trust DODO until they deliver final product on time and to military.This is big mouth agency of india

But you have to accept that Brahmos Aerospace have always delivered on their promises.
 
.
This is the original timeline that has not wavered which gives credence to the claim that Dec 2012 is the date. When projects are this close to completion it is relativity easy to know if you will meet your deadline or not, the fact they are saying they will does inspire confidence.
 
.
brahmos + su 30 mki will be a deadly combination...i'm sure that it'll be the death warrant to rouge hostiles....LET us assume If the brahhmos will be equipped to PAF FA,then its destruction will be huge..:butcher:
 
.
brahmos + su 30 mki will be a deadly combination...i'm sure that it'll be the death warrant to rouge hostiles....LET us assume If the brahhmos will be equipped to PAF FA,then its destruction will be huge..:butcher:

Not gonna happen;atleast not in the internal weapon bay. . . . . . . .

i am not going to trust DODO until they deliver final product on time and to military.This is big mouth agency of india

Yeah,like somebody gives a **** about your trust!!
. . . . . . .
 
.
brahmos + su 30 mki will be a deadly combination...i'm sure that it'll be the death warrant to rouge hostiles....LET us assume If the brahhmos will be equipped to PAF FA,then its destruction will be huge..:butcher:

i think if that happens it will be able to carry only one brahmos in the middle.then maybe two A2A missiles one the side bays thats it
 
.
Brahmos Aerospace & Mr. Pillai told in Feb 2011 they conduct Brahmos Submarine lanched version test in Dec 2011 ..Now March 2012.......Don't Belive
 
.
i think if that happens it will be able to carry only one brahmos in the middle.then maybe two A2A missiles one the side bays thats it

That's not possible, because the internal weapon bays are between the engines, so there is no centerline station anymore like at MKI. There are already developments for a smaller Brahmos version, which will be lighter and the aim is to fit 2 of them at Pak Fa and 3 at MKI.
 
. .

Pakistan Affairs Latest Posts

Back
Top Bottom