SSN budget atm is around INR 50,000 Crs or USD 7.5 Bn implying per sub max of USD 1.25-1.3 Bn
With that cost its extremely difficult to procure a roadmap for a project derived from Yasen which is closer to USD 2-2.4 Bn.
Yes cost over run can be there so make it say 20% more but with 20% more or another 2.5 Bn per sub additional to print it to USD 1.5 Bn per sub is still much below Yasen cost.
Secondly the SSN is expected to be around max 5000-5300 tonnes submerged +/-10%. Yasen is more than 2x times that size submerged.
On the other hand, P75I is Rs 60,000 Crs is around USD 9 Bn or USD 1.5 Bn per sub with again cost over run provisions much smaller as SSN is a black project and this one will be under scrutiny of CAG.
At USD 1.5 Bn, Soryu is ruled out, Type 214/216/218 with offsets and tech transfer will cost over a USD 1 Bn.
It is for this precise reason, there is a bigger dilemma for MOD. if P75I costs per sub more than SSN project, the project P75I has to support in some form for the SSN project too. This means primarily, Germany starts in backfoot as it has acoustic reduction tech and technology to fool Magnetic Anomaly detectors but France and Russia can directly give input to SSN projects particularly with reactor consultancy for the larger reactor which may later power our SSBNs too..
Its far more strategic in nature. and hence the cost of USD 1.5 Bn also covers some transfer into SSN project where cost is just USD 1.25 Bn
With that cost its extremely difficult to procure a roadmap for a project derived from Yasen which is closer to USD 2-2.4 Bn.
Yes cost over run can be there so make it say 20% more but with 20% more or another 2.5 Bn per sub additional to print it to USD 1.5 Bn per sub is still much below Yasen cost.
Secondly the SSN is expected to be around max 5000-5300 tonnes submerged +/-10%. Yasen is more than 2x times that size submerged.
On the other hand, P75I is Rs 60,000 Crs is around USD 9 Bn or USD 1.5 Bn per sub with again cost over run provisions much smaller as SSN is a black project and this one will be under scrutiny of CAG.
At USD 1.5 Bn, Soryu is ruled out, Type 214/216/218 with offsets and tech transfer will cost over a USD 1 Bn.
It is for this precise reason, there is a bigger dilemma for MOD. if P75I costs per sub more than SSN project, the project P75I has to support in some form for the SSN project too. This means primarily, Germany starts in backfoot as it has acoustic reduction tech and technology to fool Magnetic Anomaly detectors but France and Russia can directly give input to SSN projects particularly with reactor consultancy for the larger reactor which may later power our SSBNs too..
Its far more strategic in nature. and hence the cost of USD 1.5 Bn also covers some transfer into SSN project where cost is just USD 1.25 Bn