What's new

1000MW to be added in next 24 hours: PM told

farhan_9909

PROFESSIONAL
Joined
Oct 21, 2009
Messages
8,989
Reaction score
10
Country
Pakistan
Location
United Arab Emirates
ISLAMABAD: The Ministry of Water and Power Saturday apprised Prime Minister Muhammad Nawaz Sharif that another 1000 megawatts of electricity would be added to the system within next 24 hours.

The ministry reported to the Prime Minister that load-shedding has been reduced to eight hours in urban areas and 10 hours in rural areas.

According to the statistics issued by the ministry, Lahore city was facing six-hour long power outages while it is four hours for Islamabad.

Moreover, the power generation in the country has been recorded at 12,700 by 1500 hours on Saturday.

With this, the power shortfall has been reduced to 2600 MW against total demand of 15,300 MW.

According to the ministry, 3890 MW are being received from hydel resources, 1780 MW from thermal and 7030 MW from IPPs.

1000MW to be added in next 24 hours: PM told
 
.
From which source the generated electricity would be added? No new plant/site has become operational?
 
. .
ISLAMABAD: The Ministry of Water and Power Saturday apprised Prime Minister Muhammad Nawaz Sharif that another 1000 megawatts of electricity would be added to the system within next 24 hours.

The ministry reported to the Prime Minister that load-shedding has been reduced to eight hours in urban areas and 10 hours in rural areas.

According to the statistics issued by the ministry, Lahore city was facing six-hour long power outages while it is four hours for Islamabad.

Moreover, the power generation in the country has been recorded at 12,700 by 1500 hours on Saturday.

With this, the power shortfall has been reduced to 2600 MW against total demand of 15,300 MW.

According to the ministry, 3890 MW are being received from hydel resources, 1780 MW from thermal and 7030 MW from IPPs.

1000MW to be added in next 24 hours: PM told

any info on the source of the addition ????

new power plants or renovated the previous ones ????
 
.
if we go behind his claims he added some 923469MW until now :rofl:
actually what this only means is The Government would pay the oil companies to buy oil and increase the production. There are various plants in Pakistan that are not running on its potential simply due to the reason that we generate electricity on losses. It's a temporary increase in electricity which we can do anytime
 
. . .
It is funny how these announcements are made each month how 1000's Megawatts is added to National Grid andyet it does not make a dent in Shortfall and Load shedding continues as usual.
 
.
From which source the generated electricity would be added? No new plant/site has become operational?

pakistan can generate 16000-18000 mw of energy out of 23,000 on stalled capacity, if it allocates gas/furnace oil or payoff every penny to IPPs
real problem is greater price and importantly 30-40 line lossess.
 
. .
ISLAMABAD: The Ministry of Water and Power Saturday apprised Prime Minister Muhammad Nawaz Sharif that another 1000 megawatts of electricity would be added to the system within next 24 hours.

The ministry reported to the Prime Minister that load-shedding has been reduced to eight hours in urban areas and 10 hours in rural areas.

According to the statistics issued by the ministry, Lahore city was facing six-hour long power outages while it is four hours for Islamabad.

Moreover, the power generation in the country has been recorded at 12,700 by 1500 hours on Saturday.

With this, the power shortfall has been reduced to 2600 MW against total demand of 15,300 MW.

According to the ministry, 3890 MW are being received from hydel resources, 1780 MW from thermal and 7030 MW from IPPs.

1000MW to be added in next 24 hours: PM told
Is it even possible to add a 1000MW in 24 hrs? If I am not wrong,its a step by step process,synching the production with the transmission lines.
 
.
From which source the generated electricity would be added? No new plant/site has become operational?
From IPPs and restart of furnace oil based plants which have been inactivated for producing high-cost electricity,
 
.
Pakistan Does not need new power plants
what it needs to do is make proper utilization of its installed capacity and it will no longer have power outages
India's Installed capacity is estimated at 220 GW compared to Pakistan's 23.5 GW
But India is able to use 80% of its installed capacity while pakistan only uses 55% of its installed capacity
if Pakistan has similar utilization as India, then it will not have any powercuts
 
. .
They have made some payments to IPPs so they in return increased electricity production. It will go back to business as usual after Protest Jalsa by imran khan.
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom