Nop, SRE-2 is not prototype of indian OV. Its meant for performing cheap microgravity experiments and testing technologies that will allow developing second stage of TSTO-RLV. If you recall, TSTO rlv has a cryogenic upper stage that will go into the orbit, deploy sats and later perform reentry...
This guy should be made aware that its IAF that jumped on to the Tejas MK2 bandwagon when ADA proposed the variant to Navy as per navy's requirement.
Tejas MK1 is more than enough to full fill the IAF requirements. But accepting that will mean stabilizing Tejas mk1 design and inducting it in...
Cabin Environment Simulation System (CESS) will be used for test and evaluation of space modules under regulated environmental conditions that may arise during various phases of manned mission.
its not fault of army, their hands are tied by the chutiyan babus and our peace loving brigade, headed by manmohan singh. Chutiya babus have been degrading the decision making of armed forces since the 1971 war. Theses assholes want to control everything and want to reduce armed forces to being...
lousy DRDO is not the user of what it designs. ISRO designs, fails multiple times, but sticks to indigenous stuff. Boeing offered help with cryogenic tanks and manned mission technology, but ISRO chose to go for indigenous efforts. ISRO only concentrates on launch vehicle and satellite...
That called height of stupidity!!!
They don't understand the logic behind performing a small scale demonstration. Their gov stole/bought the proven technology from Russia like they do it in all other sectors and used it for building their space module. They did not have to first develop it and...
Neither Indian gov nor Indian media published this news. At least do some due diligence before start barking or may be thats your native nature which is clear from the behavior of many of your compatriots here.
It seems the free environment in US did not help much to remove your native ignorance. You dont need a space lab and manned program to perform a RVD experiment. When you develop RVD tech on your own, the logical way is to first use two satellites to perform and master RVD and once the technology...
The Light Combat Aircraft Tejas successfully completed its maiden engine relight test on Friday -- a critical parameter the programme needs to achieve for the Initial Operational Clearance (IOC). Military sources confirmed to Express that the Limited Series Production (LSP-7) aircraft from the...
The Light Combat Aircraft Tejas successfully completed its maiden engine relight test on Friday -- a critical parameter the programme needs to achieve for the Initial Operational Clearance (IOC). Military sources confirmed to Express that the Limited Series Production (LSP-7) aircraft from the...