BoQ77
BANNED
- Joined
- Jul 29, 2012
- Messages
- 8,704
- Reaction score
- 0
- Country
- Location
Construction of Tan Vu-Lach Huyen Highway project starts
The 15.6 km long route runs across Hai An and Cat Hai districts of Hai Phong city, starting from the Tan Vu interchange on Hai Phong expressway and ending at Lach Huyen port.
The route includes a 5.44km cross-sea bridge which is designed to have four lanes with two safety ranges and for cars to run at a maximum speed of 80kmph.
The Tan Vu-Lach Huyen Highway project links Hai Phong’s eastern urban area, Hai Phong international port, Dinh Vu-Cat Hai industrial park, and Ha Noi – Hai Phong Highway.
It aims to reduce travel costs and time, traffic accidents, and transport risks by ferry, stimulate industrial development along the coastal area of Hai Phong, and promote tourism on Cat Ba islands.
Speaking at the groundbreaking ceremony, PM Nguyen Tan Dung thanked the Japanese Government and the Japan International Cooperation Agency for closely coordinating with and provididing official development assistance for the Viet Nam.
He also tasked the Ministry of Transport to ensure the progress and quality of the project undertaken by Japan’s Sumitomo Mitsui contractor consortium, Truong Son Civil Engineering Construction Corporation, and Civil Engineering Construction Corporation No4 (CIENCO4)./.
VGP – The construction of the Tan Vu-Lach Huyen Highway project began this morning in the Northern city of Hai Phong.
Lach Huyen Port Infrastructure Construction Project in Hai Phong City is a seaport of type IA and plays role as an international gateway port. Lach Huyen Port is planned to be constructed on the south of Lach Huyen’s river estuary, which is situated in Cat Hai Island, Hai Phong city, along the access channel to natural elevation of -3,0m with the total berth length of approximately 8,000m, the total length of the access channel of about 18km and the bottom elevation of -14m. In accordance with the Decision No. 476/QĐ-BGTVT dated 15 March 2011 of the Ministry of Transport, in the starting stage, the infrastructure of Lach Huyen Port Infrastructure Construction Project will be constructed to meet with the demand of accommodating container and general vessels of up to 100,000 DWT and receiving the forecasted cargo volume throughput in 2010÷2015 stage of about 6 million tons with the total investment capital of about 25,000 billion VND. Lach Huyen Port Project is under public-private partnership (PPP) and inclusive of 02 portions: Portion A is owned by Vietnam Maritime Administration, Portion B is owned by a Joint Venture between Vietnamese and Japanese enterprises.
Portion A : is owned by Vietnam Maritime Administration and inclusive of the following main work items:
- Access channel: One-lane channel of B = 160m, bottom elevation of -14m (Chart Datum).
- Turning basin has D = 660m for general vessels of 50,000 DWT and container vessels of 100,000 DWT.
- Breakwater has the length of 3,220m, crest elevation of + 6,50m
- Sand protection dyke has the length of 7,600m, crest elevation of +2,0m
- Service berth
- Road and yard in administration area
- Administration area and state management units
Portion B : is owned by a Joint Venture between Vietnamese and Japanese enterprises and inclusive of the following main work items:
- Container berths: there will be 02 container berths with length of 750m, crest elevation of +5,50m (CD);
- Barge berth for barge and vessels of up to 100 TEU, crest elevation of + 5,50m (CD), bottom elevation of– 5,0m (CD).
- Technical infrastructure, fire protection system, etc.
- Technological equipments will be invested modernly and synchronously for the port management and operation that meet with the cargo handling demand in the present stage and future development. The main equipments include gantry crane with lifting capacity of 54 T, rubber tyred gantry crane (RTG), lifting, tractors, etc.
Lach Huyen Port Infrastructure Construction Project is expected to be completed and put into operation by year 2016.
Some photographs of the Contract Signing Ceremony of Lach Huyen Port Infrastructure Construction Project:
We don't care much about ranking. Fast and safe moving around is our expectation.
The 15.6 km long route runs across Hai An and Cat Hai districts of Hai Phong city, starting from the Tan Vu interchange on Hai Phong expressway and ending at Lach Huyen port.
The route includes a 5.44km cross-sea bridge which is designed to have four lanes with two safety ranges and for cars to run at a maximum speed of 80kmph.
The Tan Vu-Lach Huyen Highway project links Hai Phong’s eastern urban area, Hai Phong international port, Dinh Vu-Cat Hai industrial park, and Ha Noi – Hai Phong Highway.
It aims to reduce travel costs and time, traffic accidents, and transport risks by ferry, stimulate industrial development along the coastal area of Hai Phong, and promote tourism on Cat Ba islands.
Speaking at the groundbreaking ceremony, PM Nguyen Tan Dung thanked the Japanese Government and the Japan International Cooperation Agency for closely coordinating with and provididing official development assistance for the Viet Nam.
He also tasked the Ministry of Transport to ensure the progress and quality of the project undertaken by Japan’s Sumitomo Mitsui contractor consortium, Truong Son Civil Engineering Construction Corporation, and Civil Engineering Construction Corporation No4 (CIENCO4)./.
VGP – The construction of the Tan Vu-Lach Huyen Highway project began this morning in the Northern city of Hai Phong.
Lach Huyen Port Infrastructure Construction Project in Hai Phong City is a seaport of type IA and plays role as an international gateway port. Lach Huyen Port is planned to be constructed on the south of Lach Huyen’s river estuary, which is situated in Cat Hai Island, Hai Phong city, along the access channel to natural elevation of -3,0m with the total berth length of approximately 8,000m, the total length of the access channel of about 18km and the bottom elevation of -14m. In accordance with the Decision No. 476/QĐ-BGTVT dated 15 March 2011 of the Ministry of Transport, in the starting stage, the infrastructure of Lach Huyen Port Infrastructure Construction Project will be constructed to meet with the demand of accommodating container and general vessels of up to 100,000 DWT and receiving the forecasted cargo volume throughput in 2010÷2015 stage of about 6 million tons with the total investment capital of about 25,000 billion VND. Lach Huyen Port Project is under public-private partnership (PPP) and inclusive of 02 portions: Portion A is owned by Vietnam Maritime Administration, Portion B is owned by a Joint Venture between Vietnamese and Japanese enterprises.
Portion A : is owned by Vietnam Maritime Administration and inclusive of the following main work items:
- Access channel: One-lane channel of B = 160m, bottom elevation of -14m (Chart Datum).
- Turning basin has D = 660m for general vessels of 50,000 DWT and container vessels of 100,000 DWT.
- Breakwater has the length of 3,220m, crest elevation of + 6,50m
- Sand protection dyke has the length of 7,600m, crest elevation of +2,0m
- Service berth
- Road and yard in administration area
- Administration area and state management units
Portion B : is owned by a Joint Venture between Vietnamese and Japanese enterprises and inclusive of the following main work items:
- Container berths: there will be 02 container berths with length of 750m, crest elevation of +5,50m (CD);
- Barge berth for barge and vessels of up to 100 TEU, crest elevation of + 5,50m (CD), bottom elevation of– 5,0m (CD).
- Technical infrastructure, fire protection system, etc.
- Technological equipments will be invested modernly and synchronously for the port management and operation that meet with the cargo handling demand in the present stage and future development. The main equipments include gantry crane with lifting capacity of 54 T, rubber tyred gantry crane (RTG), lifting, tractors, etc.
Lach Huyen Port Infrastructure Construction Project is expected to be completed and put into operation by year 2016.
Some photographs of the Contract Signing Ceremony of Lach Huyen Port Infrastructure Construction Project:
Due to Vietnam's geographical size and the nature of her territory, it won't take much to fortify her transportation infrastructure.
We don't care much about ranking. Fast and safe moving around is our expectation.
Last edited: