What's new

Vietnam Gives China an Earful For 'Worst' Project

Nice_guy

FULL MEMBER

New Recruit

Joined
May 5, 2014
Messages
48
Reaction score
0
Country
Viet Nam
Location
Viet Nam
(The Diplomat) Vietnam’s transport minister publicly criticized the management of a Chinese railway company following recent accidents at an embattled project for which it is contracted in Hanoi, Voice of America reported January 8.

In an animated display seen in a nationally televised broadcast earlier this week, Dinh La Thang reportedly shouted and pointed his fingers at a representative from the state-owned China Railway Sixth Group Co. during a meeting, excoriating it for repeated accidents in the Ha Dong- Cat Linh elevated railway project for which it is the main contractor.

“Each time an accident happens, you accept responsibility, but things have not changed… Even if you make an excuse this time by saying that we borrow loans [from China], I can ask our government to replace you. We cannot trade [Chinese] loans for Vietnamese lives,” Thang said.

He also implored the company’s top leaders to come down to Vietnam from China to inspect the site and to send more units to ensure a timely completion of the accident-prone and repeatedly delayed project, which he called “the worst” in Vietnam.

Thang’s outburst comes after a recent run of accidents at the problem-ridden project, which has Chinese state-owned China Railway Sixth Group Co. Ltd as its main contractor. On November 6, bulky reels of steel fell off from the construction site, killing one motorcyclist and injuring two others, causing the project to be suspended until November 14.

Just over a month after resuming, however, another accident occurred on December 28 when the scaffolding under construction at Ha Dong terminal collapsed, smashing several cars but causing no casualties.

The Vietnamese government reacted swiftly at the time, with Thang issuing a decision to suspend, demote and reprimand consultants as well as several officials at the Railway Project Management Unit – which operates under the state-owned Vietnam Railways and was tasked with overseeing the project. The subcontractor of the project – Vietnam Technology Consultant and Construction Investment JSC (Vinacontech) was also barred from all work on the railway. China Railway Sixth Group escaped direct censure, but the ministry said it would take all responsibility and bear all costs for the incident.

The embattled Ha Dong- Cat Linh elevated railway project has suffered repeated hiccups since its inception. It was scheduled to start in November 2008 and be completed by 2013, but eventually only began in October 2011. Cost-wise, over $339 million has been added to the project’s initial estimation of $552 million back in 2008, and the price tag could rise even further. Vietnamese officials and experts have repeatedly raised concerns about the project’s safety.
 
They want to offer the lowest cost, and therefore both the quality of construction and safety standards are poor. I don't blame for Chinese contractors, I blame for corrupted official who let unqualified Chinese firm enter in such important projects. What happen next for the upcoming travelers when it is completed.
 
There're 2 accidents caused deaths of passby travellers within 1 or 2 month in this building site.
 
GCR - News - Scaffolding collapse is latest setback for troubled Chinese-built flyover in Hanoi

"...Vietnam’s transport ministry blamed a subcontractor for the collapse – Vietnam Technology Consultant and Construction Investment JSC (Vinacontech) – and barred it from all work on the elevated railway, Thanh Nien News reported.

The ministry also suspended Ta Trung Van, a consultant overseeing the terminal, and censured the project’s chief consultant Diem Chi Cuong. Their responsibility in the accident is being probed further.

Nguyen Van Bao, deputy director of the Railway Project Management Unit, was also suspended pending further investigation.

China Railway Sixth Group escaped specific censure but the ministry said it would have to take responsibility and bear all costs relating to the scaffolding collapse."

***

So, moral of the story, do not blame your own inefficiency and incapacity on the Chinese constructor which has a proven track-record elsewhere.
 

Tsk tsk tsk!! Not again!!!

@NiceGuy , what's going on? What kind of Engineering firm is this?

(The Diplomat) Vietnam’s transport minister publicly criticized the management of a Chinese railway company following recent accidents at an embattled project for which it is contracted in Hanoi, Voice of America reported January 8.

In an animated display seen in a nationally televised broadcast earlier this week, Dinh La Thang reportedly shouted and pointed his fingers at a representative from the state-owned China Railway Sixth Group Co. during a meeting, excoriating it for repeated accidents in the Ha Dong- Cat Linh elevated railway project for which it is the main contractor.

“Each time an accident happens, you accept responsibility, but things have not changed… Even if you make an excuse this time by saying that we borrow loans [from China], I can ask our government to replace you. We cannot trade [Chinese] loans for Vietnamese lives,” Thang said.

He also implored the company’s top leaders to come down to Vietnam from China to inspect the site and to send more units to ensure a timely completion of the accident-prone and repeatedly delayed project, which he called “the worst” in Vietnam.

Thang’s outburst comes after a recent run of accidents at the problem-ridden project, which has Chinese state-owned China Railway Sixth Group Co. Ltd as its main contractor. On November 6, bulky reels of steel fell off from the construction site, killing one motorcyclist and injuring two others, causing the project to be suspended until November 14.

Just over a month after resuming, however, another accident occurred on December 28 when the scaffolding under construction at Ha Dong terminal collapsed, smashing several cars but causing no casualties.

The Vietnamese government reacted swiftly at the time, with Thang issuing a decision to suspend, demote and reprimand consultants as well as several officials at the Railway Project Management Unit – which operates under the state-owned Vietnam Railways and was tasked with overseeing the project. The subcontractor of the project – Vietnam Technology Consultant and Construction Investment JSC (Vinacontech) was also barred from all work on the railway. China Railway Sixth Group escaped direct censure, but the ministry said it would take all responsibility and bear all costs for the incident.

The embattled Ha Dong- Cat Linh elevated railway project has suffered repeated hiccups since its inception. It was scheduled to start in November 2008 and be completed by 2013, but eventually only began in October 2011. Cost-wise, over $339 million has been added to the project’s initial estimation of $552 million back in 2008, and the price tag could rise even further. Vietnamese officials and experts have repeatedly raised concerns about the project’s safety.

Moral of ze story, invest in more QA inspection on regular basis.
 
There're 2 accidents caused deaths of passby travellers within 1 or 2 month in this building site.

What's going on with the subcontractors ? Who's inspecting the work by Vietnamese construction workers?
 
Agreed. Some official was laughing ... All the way to the bank.

A strong anti-corruption watchdog is the need if the hour

My "suspicion" is toward other ones that you might be involved in.

Perhaps you have mistaken my post as a China bashing one.All I was doing was making a neutral observation.
 
They want to offer the lowest cost, and therefore both the quality of construction and safety standards are poor. I don't blame for Chinese contractors, I blame for corrupted official who let unqualified Chinese firm enter in such important projects. What happen next for the upcoming travelers when it is completed.


Safety and others are some basic requirement. you can not bit a tender consedering letting safety go to get the contract.
 

Latest posts

Back
Top Bottom