What's new

Two decades of flawed policies: Power producers make billions in Pakistan

Orca

FULL MEMBER
Joined
Nov 30, 2016
Messages
661
Reaction score
0
Country
Pakistan
Location
Pakistan
Two decades of flawed policies: Power producers make billions in Pakistan
By Zafar Bhutta
Published: April 17, 2020
Tweet Email
2199737-image-1587067130-578-640x480.jpg

The inquiry committee analysed power projects set up under different policies introduced since 1994 and the volume of excess payments due to higher rates of return on equity. PHOTO: REUTERS

ISLAMABAD: An inquiry committee, formed by the government to investigate independent power producers (IPPs), has unearthed that energy producers have made billions of rupees in the past two decades due to flawed policies.

The committee has recommended the recovery of all excess payments that amount to Rs1,000 billion. However, close aides of Prime Minister Imran Khan, who have been among beneficiaries in the power sector, have cautioned that it may lead to a legal battle.

The inquiry committee analysed power projects set up under different policies introduced since 1994 and the volume of excess payments due to higher rates of return on equity. It also raised questions about the two coal-based power plants set up under the China-Pakistan Economic Corridor (CPEC).

The committee, headed by former Securities and Exchange Commission of Pakistan (SECP) chairman, has now recommended a forensic audit of the power sector and recovery of all excess payments. It has also recommended shifting from the dollar-based rate of return to the one based on Pakistani rupee.

Power Policy 1994

The inquiry committee said 16 out of 17 projects invested a combined capital of Rs51.80 billion and earned profit of over Rs415 billion as well as took out dividends of Rs310 billion based on financial statements available with the National Electric Power Regulatory Authority (Nepra) and SECP.

Power Policy 2002

Under this policy, 13 residual fuel oil (RFO) and gas-based power plants with combined capacity of 2,934 megawatts were established.

In the past eight to nine-year operational period, these companies earned Rs203 billion in profit against combined investment of Rs57.81 billion. Even after adjustment for debt, the companies earned Rs152 billion and made dividend payments to the tune of Rs111 billion. The individual profitability varied among the power plants as some made a higher profit with average rate of return of 87% and dividends up to seven times of their investments.

It was found that a major component of excess payments to the IPPs, established under the 2002 policy, was on account of actual fuel consumed for electricity generation being less than the payment made by the purchasers in lieu of electricity.

Furthermore, while determining tariffs for RFO-based IPPs, Nepra had approved their heat rate on the basis of information provided by them. One of the IPPs consistently operated at higher efficiency levels compared to the heat rate submitted to Nepra. This was applicable in case of most of the IPPs.

Power Policy 2015

A review of two imported coal-based power plants established under the Power Policy 2015 shows that one of them has recovered 71% of investment in two years and the other has recovered 32% of investment in only one year of operation.

These plants have been offered 17% rate of return in dollars, which works out to be 27%. Owing to depreciation of the rupee against the dollar, the rupee rate of return stands at 43%.

Excess payments

Assuming that the dollar appreciated against the rupee at an average rate of 6% per annum (actual yearly depreciation was around 6.87% in the past nine years), the excess payment to the 2002, 2006, 2013 and 2015 IPPs under review (6,471MW) amounts to Rs237.65 billion. However, the excess payments to all the IPPs, except for the IPPs installed under 1994 and 1995 policies (13,156MW), amount to Rs565.88 billion.

A similar error was observed in case of debt payments. Whereas Nepra assumed quarterly payment of debt to the IPPs, the CPPA-G made monthly payments with late payment subjected to late payment surcharge.

This mismatch led to additional working capital availability to the IPPs. The cost of working capital was already part of the tariff awarded to the IPPs based on the financing cost of Kibor plus 2%.

Circular debt

Between FY05 and FY10, the cost of power generation in the country increased by 148% and average tariff by 33% on account of higher international oil prices, higher share of furnace oil in power generation and rupee depreciation.

The circular debt started emerging in the late 2000s. Successive governments relied on heavy budgetary support and quasi-fiscal financing to eliminate it. However, the measures addressed the symptoms and not the root causes.

The cumulative budgetary support to the power sector amounted to Rs3,202 billion from FY07 to FY19. An amount of Rs2.86 trillion was paid on account of budgetary subsidies and Rs342 billion in other liquidity injections.

Yet, the circular debt stock continued to grow and increased by Rs465 billion in FY19 to around Rs1,600 billion. It led to total financial loss to the country of Rs4,802 billion during the 13-year period, causing annual loss of around Rs370 billion due to power-sector inefficiencies.

This is especially alarming because with public indebtedness (public debt-GDP ratio) having increased to 85% in FY19 from 52% in FY07, the government’s ability to provide fiscal support to the sector is now severely constrained.

IPPs views

Independent Power Producers Advisory Council (IPPAC) Chairman Khalid Mansoor argued that capacity charges included bank loan repayments and other financial costs, fixed operational costs and IPPs’ profit or IRR as given in the tariff fixed by Nepra as per the power policy.

Back in FY18, he said, the share of capacity charges in generation costs was around one-third, but today it doubled to two-thirds for two main reasons – new generation capacity added in the past few years and the net hydel profit being paid to two provinces (K-P and Punjab) by the Water and Power Development Authority (Wapda). This decision was taken in 2017 by the Council of Common Interests.

He emphasised that sponsors invested in projects to earn return over and above their equity investment over the projects’ life. “No investor will invest merely to recover his investment without earning return.”

“If the government decides to strong arm IPPs, it will completely shatter the confidence and future investors will shy away from Pakistan,” he pointed out. “This will increase country’s risk premium and future investors will demand higher returns.”

https://tribune.com.pk/story/219973...icies-power-producers-make-billions-pakistan/


Top to bottom each and every person is corrupt to his cores. There is no doubt if today the country presents on the map is because its on the mercy of Allah SWT.
 
IPP was brain child of corrupts in 'Muqaddas Parliament' to form a powerful mafia to loot and benefit their generations to come. That's why they always opposed to 'hydro-electricity' as it was cheap and they could not benefit from it. Made money on signing contracts and will continue in making money on import of LPG/Oil.
Sugar, Flour, Milk, Poultry, Medicines, Vehicle manufacturers, Religious are few to name and now another addition.
 
It's very difficult to get out of this planned corruption. All the ex PPP, PML N, PMLQ mafia are part of the PTI now, they bankroll the party with their billions and influence. IK can struggle against corruption to a certain level but it wont make much difference. Reducing corruption from 100% to 90% wont make much of a difference. We need radical operation against corrupt mafias, bring it from 100% to 50%. Reduction in half will be noticed.

I am still waiting for IK to set up a corruption free, modern, reformed police station in Pakistan, a bonus would be to set up a court where justice is served, a corruption free lawyer office set. This can be a role model for all Pakistan. I can understand to change Pakistan it will take time but is it too much to ask for 1 corruption free police station, a court, lawyers office. Something so that people of Pakistan can get their hopes up that its possible to reduce corruption in Pakistan.
 
Rs 5000b in 13 years??????


Nooch nooch ke kha gaye meray mulk ko. Imran Khan is literally an angel sent by Allah. 5 more years of Sharifs or Zardaris and Pakistan wouldn't have been on the world map.
 
Bureaucracy is corrupt. Sign all contracts in dollars and under foreign laws and entities. If Bureaucracy is honest then this won't happened.
 
This index has already been addressed here on PDF. It does not conduct investigations on its own but refers only to the reported cases. Since PTI government has initiated inquiries into cases in previous years, the index is now reflecting that effect.
It is fact , now corruption cases are being reported, published on media.
 
and not one of them re invested that money in Pakistan. our distribution and transmission system is in shambles, no new power plants were setup (except for those financed by the govt itself or through loans), and yet they ketp ripping the public off.
 
Rs 5000b in 13 years??????


Nooch nooch ke kha gaye meray mulk ko. Imran Khan is literally an angel sent by Allah. 5 more years of Sharifs or Zardaris and Pakistan wouldn't have been on the world map.
Lakin ab qayon wohi log IK k left aur right ma bathy han...
 

Pakistan Defence Latest Posts

Back
Top Bottom