What's new

The UAE is about to become the first Arab nuclear power

Status
Not open for further replies.

Kuwaiti Girl

SENIOR MEMBER
Joined
May 8, 2016
Messages
2,287
Reaction score
0
Country
Kuwait
Location
Kuwait
The UAE is about to become the first Arab nuclear power
The nuclear reactor is set to become operational in May.
http://stepfeed.com/the-uae-is-about-to-become-the-first-arab-nuclear-power-1546

The United Arab Emirates is on the fast track to becoming the Arab world’s first nuclear power producing country. This, after the industry’s regulator, the Federal Authority for Nuclear Regulation, approved licenses to transport and store nuclear fuel – a final step in a long, arduous process.

The shipment would be sent by sea from South Korea in the coming weeks before it is inspected on arrival and taken to the Barakah power plant site in the Western Region next month, The National reported.

The plant is designed on a Korean model and is able to withstand major natural disasters.

If everything goes to plan, the nuclear reactor should become operational by May, pending regulatory approval.

Commenting on the development, Christer Viktorsson, the director general of the Federal Authority for Nuclear Regulation (FANR), said it was a "major milestone for us because we’ve worked diligently during months to make us convinced that everything is ready to transport and store fuel".

"One of the principles of the UAE’s nuclear power programme is operational transparency," Viktorsson added. "This is an effort by FANR to keep the public informed about the important decisions it is making."

According to Ian Grant, the authority’s deputy director general for operations, the Emirates Nuclear Energy Corporation already had power in the plant and was running systems at the plant to check its equipment.

"Once we have authorization to load the fuel, there would be a period of about another six or seven months of testing and gradually increasing power," he said.

"The current schedule is May but we’re not bound by that schedule … We expect further inspections from the International Atomic Energy Agency, which will make sure the fuel is used for peaceful purposes only."

For his part, Hamad Alkaabi, the UAE ambassador to the IAEA, agreed that receiving fuel was a significant milestone.

"The UAE has worked closely with the IAEA safeguards teams to ensure all surveillance and control measures are in place and in line with IAEA requirements at the Barakah nuclear plant," Alkaabi said.

"This step demonstrates that all arrangements and measures in terms of readiness, safety and security have been received and confirmed to be adequate."

Over 200 experts are currently overseeing nuclear safety, security, radiation protection, safeguards and related areas such as emergency preparedness and waste management at FANR.

It's about sustainability
The UAE is a country rich with fossil fuels, so why does its government want to invest in nuclear power?

Industry officials believe nuclear energy will play a critical role in tackling climate change. How? By helping the nation meet its sustainability commitments under the Paris Climate Change Agreement, signed in 2015 and ratified in 2016, through nuclear energy.

ENEC (Emirates Nuclear Energy Corporation) believes that by reducing the carbon dioxide emissions generated by the electricity sector, and diversifying energy sources, the commitments can be met.

Other Arab countries will follow
Over the coming decade, new nuclear power plants are expected to become operational throughout the MENA region, according to the Carnegie Middle East Center.

Saudi Arabia will follow the UAE with the “most ambitious nuclear plan, involving sixteen nuclear reactors to be built by 2032.” The first reactor is expected to be operating in 2022.

As for Jordan, the country signed a deal with Russia’s Rosatom, the state nuclear corporation, to build its first nuclear power plant, projected to be operational in 2023.

Egypt did the same, and will be building four reactors over the next twelve years.

Morocco, Tunisia, and Algeria, which has run two research reactors since the early 1990s at Draria and Ain Oussera, are also considering their options.

But, not all countries are on board. Kuwait, Oman, and Qatar, have cancelled their nuclear plans following the Fukushima Daiichi Nuclear Power Station accident in Japan in 2011.
 
.
not good news, Iran will do a pakistan and demands that it needs the same as well.
 
. . . .
what is the problem if Iran demands that??
Iran already produces nuclear energy, by the way.

I'm happy for the UAE. Unlike the other GCC states, it's more serious about diversifying away from oil and natural gas.
 
. . .
Iran already produces nuclear energy, by the way.

I'm happy for the UAE. Unlike the other GCC states, it's more serious about diversifying away from oil and natural gas.
ANd for UAE it's not only for energy diversification, but they want to build an Ecosystem around it ( research and such)
 
. . .
UAE’s Barakah NPP 75% complete
11 January 2017

Units 3 and 4 at the United Arab Emirates' Barakah nuclear power plant are more than half complete, the Emirates Nuclear Energy Corporation (Enec) announced on 9 January.

Unit 3 is now more than 62% complete following installation of the reactor containment building liner dome, which put in place the roof of the structure where the reactor vessel was installed in July 2016. Work to pour the concrete and complete the building is progressing, and the building is expected to be completed on schedule in the first quarter of 2017, Enec said.

Unit 4's turbine generator deck has been completed and its final reactor containment liner plate rings have been set. Work has begun on construction of the turbine building, and interior and exterior concrete is now being poured for unit 4's reactor containment building.

According to Enec deputy CEO Ahmed Al Rumaithi, the company is aiming for the installation of unit 4's reactor pressure vessel in mid-2017. "The construction of unit 4 is now 35% complete and is ahead of schedule, with the completion of the deck and rings having occurred roughly ten months after similar work was concluded on Unit 3," he said.

Construction of Barakah's four Korean-designed AP1400 reactors began in 2012. Overall construction of the plant is now around 75% complete. Unit 1 is scheduled to start up this year, with the others following at yearly intervals until the plant is completed in 2020. Barakah is expected to supply up to a quarter of the UAE's electricity and save up to 12m tonnes of carbon emissions a year, once the plant is fully operational.

http://www.neimagazine.com/news/newsuaes-barakah-npp-75-complete-5714037
 
Last edited:
. .
And Kuwait.

Kuwait wants to build a nuclear power plant with Russian help. :-)

Yep, but for kowait it's a waste of money , you dont need one for 3Mil pop. and too dangerous, since it will be next to the majority of the kuwaiti
One mistake and it's all the kuwaiti who will die. extermination of a nation in a blink of an eye
 
.
Iran already produces nuclear energy, by the way.

I'm happy for the UAE. Unlike the other GCC states, it's more serious about diversifying away from oil and natural gas.
Actually people are interpreting the title wrongly......anyway, nuclear power production is cheaper in the long run so I think it is a good choice....
 
.
Status
Not open for further replies.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom