In arduis fidelis
FULL MEMBER
- Joined
- Jul 4, 2014
- Messages
- 1,064
- Reaction score
- 3
- Country
- Location
The spokesperson stated that authorities have decided to increase production capabilities
PESHAWAR (Dunya News) – Spokesperson for the Pakistan Air Force (PAF) on Monday has said that Pakistan Aeronautical Complex (PAC) has achieved its annual production goal.
In a statement issued, the spokesperson stated that authorities have decided to increase aeronautical complex’s production capabilities.
The complex has handed over 16th JF-17 Thunder aircraft to the air force in the ongoing year.
Earlier in September, Kamra complex had made the Airborne Warning And Control System (AWACS) aircraft operational on half the cost as compared to foreign companies. As a result, USD 15 million were saved due to the indigenous repair to the aircraft. Feasibility study of Gwadar deep waters shipyard was also completed.
The aircraft had been damaged in an attack by terrorists during on Kamra aeronautical complex.
Source:Target met, PAC produced 16 JF-17 aircrafts in 2015: spokesperson - Pakistan - Dunya News