What's new

SU27/F16C Not even Close to SU30MKI

Status
Not open for further replies.

maverick2009

BANNED
Joined
Mar 28, 2009
Messages
416
Reaction score
0
Meet India?s SU-30MK1 jet fighter - upiasia.com

The author is a claiming that the Chinease will over power the IAF thru shear nos #

But PAF has nothing that comes even close to MKI

The 2 factors that set the MKI apart from all other fighters in THE MIX.

TVC A131 turbo fan engine.

Israeli & french Avionics ( western electronics on a Russian plane)
 
Maverick,

Do a few searches on Mr. Sud's works. Also pay special attention to his background.

On the issue of the two factors, TVC was great before the HOBS WVRAAMs showed up on the scene. Try escaping a ~50G maneuverability envelope of a HOBS WVRAAM with the theatrics of the TVC.

Israeli and French avionics....hmm so Pakistan has never flown western avionics on their aircraft? Are the ones from the US any less? IAF is hardly the first and definitely not the last to have integrated the mix on a Russian aircraft. There are very many examples of it.
 
Is he spouting rubbish then ???

pretty much yes.

F-16 gifted to pakistan? when did that happen?

Thrust vectoring can outmaneuver anything that flies? O really?

US called India for exercise so they can call them a Super Power? :lol:
funny he didn't mention what the USAF thought of Indian pilots in their Su-30MKIs at Red Flag.

Suddenly, R-73 has become the world's best missile.


The guy, a forumer from BR, is a complete joke. Last time he wrote that the SAAB 2000 Erieye could at best be equated to the local AEW&C India is developing.
 
Well, f22 isn't either superduper:
Premier U.S. Fighter Jet Has Major Shortcomings
F-22's Maintenance Demands Growing

The United States' top fighter jet, the Lockheed Martin F-22, has recently required more than 30 hours of maintenance for every hour in the skies, pushing its hourly cost of flying to more than $44,000, a far higher figure than for the warplane it replaces, confidential Pentagon test results show.

The aircraft's radar-absorbing metallic skin is the principal cause of its maintenance troubles, with unexpected shortcomings -- such as vulnerability to rain and other abrasion -- challenging Air Force and contractor technicians since the mid-1990s, according to Pentagon officials, internal documents and a former engineer.

While most aircraft fleets become easier and less costly to repair as they mature, key maintenance trends for the F-22 have been negative in recent years, and on average from October last year to this May, just 55 percent of the deployed F-22 fleet has been available to fulfill missions guarding U.S. airspace, the Defense Department acknowledged this week. The F-22 has never been flown over Iraq or Afghanistan.

Sensitive information about troubles with the nation's foremost air-defense fighter is emerging in the midst of a fight between the Obama administration and the Democrat-controlled Congress over whether the program should be halted next year at 187 planes, far short of what the Air Force and the F-22's contractors around the country had anticipated.

"It is a disgrace that you can fly a plane [an average of] only 1.7 hours before it gets a critical failure" that jeopardizes success of the aircraft's mission, said a Defense Department critic of the plane who is not authorized to speak on the record. Other skeptics inside the Pentagon note that the planes, designed 30 years ago to combat a Cold War adversary, have cost an average of $350 million apiece and say they are not a priority in the age of small wars and terrorist threats.

But other defense officials -- reflecting sharp divisions inside the Pentagon about the wisdom of ending one of the largest arms programs in U.S. history -- emphasize the plane's unsurpassed flying abilities, express renewed optimism that the troubles will abate and say the plane is worth the unexpected costs.

Votes by the House and Senate armed services committees last month to spend $369 million to $1.75 billion more to keep the F-22 production line open were propelled by mixed messages from the Air Force -- including a quiet campaign for the plane that includes snazzy new Lockheed videos for key lawmakers -- and intense political support from states where the F-22's components are made. The full House ratified the vote on June 25, and the Senate is scheduled to begin consideration of F-22 spending Monday.

After deciding to cancel the program, Defense Secretary Robert M. Gates called the $65 billion fleet a "niche silver-bullet solution" to a major aerial war threat that remains distant. He described the House's decision as "a big problem" and has promised to urge President Obama to veto the military spending bill if the full Senate retains F-22 funding.

The administration's position is supported by military reform groups that have long criticized what they consider to be poor procurement practices surrounding the F-22, and by former senior Pentagon officials such as Thomas Christie, the top weapons testing expert from 2001 to 2005. Christie says that because of the plane's huge costs, the Air Force lacks money to modernize its other forces adequately and has "embarked on what we used to call unilateral disarmament."

David G. Ahern, a senior Pentagon procurement official who helps oversee the F-22 program, said in an interview that "I think we've executed very well," and attributed its troubles mostly to the challenge of meeting ambitious goals with unstable funding.

A spokeswoman for Lockheed added that the F-22 has "unmatched capabilities, sustainability and affordability" and that any problems are being resolved in close coordination with the Air Force.

'Cancellation-Proof'

Designed during the early 1980s to ensure long-term American military dominance of the skies, the F-22 was conceived to win dogfights with advanced Soviet fighters that Russia is still trying to develop.

Lt. Gen. Harry M. Wyatt III, director of the Air National Guard, said in a letter this week to Sen. Saxby Chambliss (R-Ga.) that he likes the F-22 because its speed and electronics enable it to handle "a full spectrum of threats" that current defensive aircraft "are not capable of addressing."

"There is really no comparison to the F-22," said Air Force Maj. David Skalicky, a 32-year-old former F-15 pilot who now shows off the F-22's impressive maneuverability at air shows. Citing the critical help provided by its computers in flying radical angles of attack and tight turns, he said "it is one of the easiest planes to fly, from the pilot's perspective."

Its troubles have been detailed in dozens of Government Accountability Office reports and Pentagon audits. But Pierre Sprey, a key designer in the 1970s and 1980s of the F-16 and A-10 warplanes, said that from the beginning, the Air Force designed it to be "too big to fail, that is, to be cancellation-proof."

Lockheed farmed out more than 1,000 subcontracts to vendors in more than 40 states, and Sprey -- now a prominent critic of the plane -- said that by the time skeptics "could point out the failed tests, the combat flaws, and the exploding costs, most congressmen were already defending their subcontractors' " revenues.

John Hamre, the Pentagon's comptroller from 1993 to 1997, says the department approved the plane with a budget it knew was too low because projecting the real costs would have been politically unpalatable on Capitol Hill.

"We knew that the F-22 was going to cost more than the Air Force thought it was going to cost and we budgeted the lower number, and I was there," Hamre told the Senate Armed Services Committee in April. "I'm not proud of it," Hamre added in a recent interview.

When limited production began in 2001, the plane was "substantially behind its plan to achieve reliability goals," the GAO said in a report the following year. Structural problems that turned up in subsequent testing forced retrofits to the frame and changes in the fuel flow. Computer flaws, combined with defective software diagnostics, forced the frequent retesting of millions of lines of code, said two Defense officials with access to internal reports.

Skin problems -- often requiring re-gluing small surfaces that can take more than a day to dry -- helped force more frequent and time-consuming repairs, according to the confidential data drawn from tests conducted by the Pentagon's independent Office of Operational Test and Evaluation between 2004 and 2008.

Over the four-year period, the F-22's average maintenance time per hour of flight grew from 20 hours to 34, with skin repairs accounting for more than half of that time -- and more than half the hourly flying costs -- last year, according to the test and evaluation office.

The Air Force says the F-22 cost $44,259 per flying hour in 2008; the Office of the Secretary of Defense said the figure was $49,808. The F-15, the F-22's predecessor, has a fleet average cost of $30,818.

'Compromises'

Darrol Olsen, a specialist in stealth coatings who worked at Lockheed's testing laboratory in Marietta, Ga., from 1995 to 1999, said the current troubles are unsurprising. In a lawsuit filed under seal in 2007, he charged the company with violating the False Claims Act for ordering and using coatings that it knew were defective while hiding the failings from the Air Force.
He has cited a July 1998 report that said test results "yield the same problems as documented previously" in the skin's quality and durability, and another in December that year saying, "Baseline coatings failed." A Lockheed briefing that September assured the Air Force that the effort was "meeting requirements with optimized products."

"When I got into this thing . . . I could not believe the compromises" made by Lockheed to meet the Air Force's request for quick results, said Olsen, who had a top-secret clearance. "I suggested we go to the Air Force and tell them we had some difficulties . . . and they would not do that. I was squashed. I knew from the get-go that this material was bad, that this correcting it in the field was never going to work."

Olsen, who said Lockheed fired him over a medical leave, heard from colleagues as recently as 2005 that problems persisted with coatings and radar absorbing materials in the plane's skin, including what one described as vulnerability to rain. Invited to join his lawsuit, the Justice Department filed a court notice last month saying it was not doing so "at this time" -- a term that means it is still investigating the matter, according to a department spokesman.

Ahern said the Pentagon could not comment on the allegations. Lockheed spokeswoman Mary Jo Polidore said that "the issues raised in the complaint are at least 10 years old," and that the plane meets or exceeds requirements established by the Air Force. "We deny Mr. Olsen's allegations and will vigorously defend this matter."

There have been other legal complications. In late 2005, Boeing learned of defects in titanium booms connecting the wings to the plane, which the company, in a subsequent lawsuit against its supplier, said posed the risk of "catastrophic loss of the aircraft." But rather than shut down the production line -- an act that would have incurred large Air Force penalties -- Boeing reached an accord with the Air Force to resolve the problem through increased inspections over the life of the fleet, with expenses to be mostly paid by the Air Force.

Sprey said engineers who worked on it told him that because of Lockheed's use of hundreds of subcontractors, quality control was so poor that workers had to create a "shim line" at the Georgia plant where they retooled badly designed or poorly manufactured components. "Each plane wound up with all these hand-fitted parts that caused huge fits in maintenance," he said. "They were not interchangeable."

Polidore confirmed that some early parts required modifications but denied that such a shim line existed and said "our supplier base is the best in the industry."

The plane's million-dollar radar-absorbing canopy has also caused problems, with a stuck hatch imprisoning a pilot for hours in 2006 and engineers unable to extend the canopy's lifespan beyond about 18 months of flying time. It delaminates, "loses its strength and finish," said an official privy to Air Force data.

In the interview, Ahern and Air Force Gen. C.D. Moore confirmed that canopy visibility has been declining more rapidly than expected, with brown spots and peeling forcing $120,000 refurbishments at 331 hours of flying time, on average, instead of the stipulated 800 hours.

There has been some gradual progress. At the plane's first operational flight test in September 2004, it fully met two of 22 key requirements and had a total of 351 deficiencies; in 2006, it fully met five; in 2008, when squadrons were deployed at six U.S. bases, it fully met seven.

"It flunked on suitability measures -- availability, reliability, and maintenance," said Christie about the first of those tests. "There was no consequence. It did not faze anybody who was in the decision loop" for approving the plane's full production. This outcome was hardly unique, Christie adds. During his tenure in the job from 2001 to 2005, "16 or 17 major weapons systems flunked" during initial operational tests, and "not one was stopped as a result."

"I don't accept that this is still early in the program," Christie said, explaining that he does not recall a plane with such a low capability to fulfill its mission due to maintenance problems at this point in its tenure as the F-22. The Pentagon said 64 percent of the fleet is currently "mission capable." After four years of rigorous testing and operations, "the trends are not good," he added.

Pentagon officials respond that measuring hourly flying costs for aircraft fleets that have not reached 100,000 flying hours is problematic, because sorties become more frequent after that point; Ahern also said some improvements have been made since the 2008 testing, and added: "We're going to get better." He said the F-22s are on track to meet all of what the Air Force calls its KPP -- key performance parameters -- by next year.

But last Nov. 20, John J. Young Jr., who was then undersecretary of defense and Ahern's boss, said that officials continue to struggle with the F-22's skin. "There's clearly work that needs to be done there to make that airplane both capable and affordable to operate," he said.

When Gates decided this spring to spend $785 million on four more planes and then end production of the F-22, he also kept alive an $8 billion improvement effort. It will, among other things, give F-22 pilots the ability to communicate with other types of warplanes; it currently is the only such warplane to lack that capability.

The cancellation decision got public support from the Air Force's top two civilian and military leaders, who said the F-22 was not a top priority in a constrained budget. But the leaders' message was muddied in a June 9 letter from Air Combat Cmdr. John D.W. Corley to Chambliss that said halting production would put "execution of our current national military strategy at high risk in the near to mid-term." The right size for the fleet, he said, is 381.
Fatal Test Flight

One of the last four planes Gates supported buying is meant to replace an F-22 that crashed during a test flight north of Los Angeles on March 25, during his review of the program. The Air Force has declined to discuss the cause, but a classified internal accident report completed the following month states that the plane flew into the ground after poorly executing a high-speed run with its weapons-bay doors open, according to three government officials familiar with its contents. The Lockheed test pilot died.

Several sources said the flight was part of a bid to make the F-22 relevant to current conflicts by giving it a capability to conduct precision bombing raids, not just aerial dogfights. The Air Force is still probing who should be held accountable for the accident.
 
dear mavrick i guss you will have to find another article to upset the members here. :rofl:
now the members of this forum have begin to understand you and the aim of your posts well! :blah: :blah:
now start searching for some news that can let the Pakistanis down but try to find it from a crediable source so that you can involve us in a debate! you see this time there was no response moving toward a discussion :chilli:
wish you luck!

regards!
 
Bogus topic!
try LCA Fantasies over JF-17 :p
 
Its high time to lock this thread!!!......
 
the U.S. Air Force was humbled when the Indian SU-30 MK1 fighter outscored the best U.S. air domination fighter, the F-16C
Lolz qoute of the day for me
It is the U.S. F-22 Raptor that will match it.
Lolz waoooooooooo nice

It is the thrust-vectoring engine in the MK1 that sets it apart. Two Russian-built A131FP turbofans, with 29,400 pounds of thrust each, power this plane. The thrust-vectoring nozzle can direct the exhaust both in the horizontal as well as in the vertical plane. That means the plane can outmaneuver anything that flies.

J-10 has ALF-31FM with 3D TVC

The Pakistani block A/B F-16 kept India on its toes since 1987. It was the presence of the MIG-29 in the Indian skies that discouraged the Pakistanis a bit. When the Indian Air Force began to fly its first batch of SU-30MK1s, the situation changed dramatically. Pakistani pilots expressed concern over not having “beyond visual range” capability.
Half true PAF never made any aggression against IAF and BVR capabilty is now in with SD-10
Eight years of their fear of flying against the MK1 were alleviated with the U.S. gift of block 50/52, F-16C/D fighters. These were a good match for the MK1 with their improved radars and avionics, but not good enough. The disadvantaged Pakistani pilots are seeking additional AWACS and missiles
PAF is seeking AWACS since Russian intervention in Afghanistan and if MKI is so potent they why IAF is going for AWACS??????

the Pakistanis are no match for the Indians
lolz
By 2016, the Indians will be flying close to 200 SU-30MK1s, in addition to 40 to 60 light combat aircraft and another 120 medium combat aircraft, which are being acquired from abroad in the next three to seven years.
hahahaha this guy is taking MRCA (Multirole Combat Air Craft) as MCA
The Chinese are overconfident and have ignored these developments. They believe that their sheer numbers will prevail in an air battle with India. India will be busy redressing that disadvantage in the next ten years. Then quality and numbers will both outmatch the Chinese, no matter what they throw at India.
ya sure J-11 J-10 JH-7A JXX ya they are really ignorent

is a retired vice president of C-I-L Inc., a former investment strategies analyst and international relations manager. A graduate of Punjab University and the University of Missouri, he has lived in Canada for the past 34 years.
Now I am satisfied lolx look at the capabilities let me match; I ve been living in Pakistan for 24 Years and im also an Investment Analyst I ll also write a column on FC-20 lolz
is he from Laugther Challenge ? ;)
 
Last edited:
Well, f22 isn't either superduper:
Premier U.S. Fighter Jet Has Major Shortcomings
F-22's Maintenance Demands Growing

The United States' top fighter jet, the Lockheed Martin F-22, has recently required more than 30 hours of maintenance for every hour in the skies, pushing its hourly cost of flying to more than $44,000, a far higher figure than for the warplane it replaces, confidential Pentagon test results show.

The aircraft's radar-absorbing metallic skin is the principal cause of its maintenance troubles, with unexpected shortcomings -- such as vulnerability to rain and other abrasion -- challenging Air Force and contractor technicians since the mid-1990s, according to Pentagon officials, internal documents and a former engineer.

While most aircraft fleets become easier and less costly to repair as they mature, key maintenance trends for the F-22 have been negative in recent years, and on average from October last year to this May, just 55 percent of the deployed F-22 fleet has been available to fulfill missions guarding U.S. airspace, the Defense Department acknowledged this week. The F-22 has never been flown over Iraq or Afghanistan.

Sensitive information about troubles with the nation's foremost air-defense fighter is emerging in the midst of a fight between the Obama administration and the Democrat-controlled Congress over whether the program should be halted next year at 187 planes, far short of what the Air Force and the F-22's contractors around the country had anticipated.

"It is a disgrace that you can fly a plane [an average of] only 1.7 hours before it gets a critical failure" that jeopardizes success of the aircraft's mission, said a Defense Department critic of the plane who is not authorized to speak on the record. Other skeptics inside the Pentagon note that the planes, designed 30 years ago to combat a Cold War adversary, have cost an average of $350 million apiece and say they are not a priority in the age of small wars and terrorist threats.

But other defense officials -- reflecting sharp divisions inside the Pentagon about the wisdom of ending one of the largest arms programs in U.S. history -- emphasize the plane's unsurpassed flying abilities, express renewed optimism that the troubles will abate and say the plane is worth the unexpected costs.

Votes by the House and Senate armed services committees last month to spend $369 million to $1.75 billion more to keep the F-22 production line open were propelled by mixed messages from the Air Force -- including a quiet campaign for the plane that includes snazzy new Lockheed videos for key lawmakers -- and intense political support from states where the F-22's components are made. The full House ratified the vote on June 25, and the Senate is scheduled to begin consideration of F-22 spending Monday.

After deciding to cancel the program, Defense Secretary Robert M. Gates called the $65 billion fleet a "niche silver-bullet solution" to a major aerial war threat that remains distant. He described the House's decision as "a big problem" and has promised to urge President Obama to veto the military spending bill if the full Senate retains F-22 funding.

The administration's position is supported by military reform groups that have long criticized what they consider to be poor procurement practices surrounding the F-22, and by former senior Pentagon officials such as Thomas Christie, the top weapons testing expert from 2001 to 2005. Christie says that because of the plane's huge costs, the Air Force lacks money to modernize its other forces adequately and has "embarked on what we used to call unilateral disarmament."

David G. Ahern, a senior Pentagon procurement official who helps oversee the F-22 program, said in an interview that "I think we've executed very well," and attributed its troubles mostly to the challenge of meeting ambitious goals with unstable funding.

A spokeswoman for Lockheed added that the F-22 has "unmatched capabilities, sustainability and affordability" and that any problems are being resolved in close coordination with the Air Force.

'Cancellation-Proof'

Designed during the early 1980s to ensure long-term American military dominance of the skies, the F-22 was conceived to win dogfights with advanced Soviet fighters that Russia is still trying to develop.

Lt. Gen. Harry M. Wyatt III, director of the Air National Guard, said in a letter this week to Sen. Saxby Chambliss (R-Ga.) that he likes the F-22 because its speed and electronics enable it to handle "a full spectrum of threats" that current defensive aircraft "are not capable of addressing."

"There is really no comparison to the F-22," said Air Force Maj. David Skalicky, a 32-year-old former F-15 pilot who now shows off the F-22's impressive maneuverability at air shows. Citing the critical help provided by its computers in flying radical angles of attack and tight turns, he said "it is one of the easiest planes to fly, from the pilot's perspective."

Its troubles have been detailed in dozens of Government Accountability Office reports and Pentagon audits. But Pierre Sprey, a key designer in the 1970s and 1980s of the F-16 and A-10 warplanes, said that from the beginning, the Air Force designed it to be "too big to fail, that is, to be cancellation-proof."

Lockheed farmed out more than 1,000 subcontracts to vendors in more than 40 states, and Sprey -- now a prominent critic of the plane -- said that by the time skeptics "could point out the failed tests, the combat flaws, and the exploding costs, most congressmen were already defending their subcontractors' " revenues.

John Hamre, the Pentagon's comptroller from 1993 to 1997, says the department approved the plane with a budget it knew was too low because projecting the real costs would have been politically unpalatable on Capitol Hill.

"We knew that the F-22 was going to cost more than the Air Force thought it was going to cost and we budgeted the lower number, and I was there," Hamre told the Senate Armed Services Committee in April. "I'm not proud of it," Hamre added in a recent interview.

When limited production began in 2001, the plane was "substantially behind its plan to achieve reliability goals," the GAO said in a report the following year. Structural problems that turned up in subsequent testing forced retrofits to the frame and changes in the fuel flow. Computer flaws, combined with defective software diagnostics, forced the frequent retesting of millions of lines of code, said two Defense officials with access to internal reports.

Skin problems -- often requiring re-gluing small surfaces that can take more than a day to dry -- helped force more frequent and time-consuming repairs, according to the confidential data drawn from tests conducted by the Pentagon's independent Office of Operational Test and Evaluation between 2004 and 2008.

Over the four-year period, the F-22's average maintenance time per hour of flight grew from 20 hours to 34, with skin repairs accounting for more than half of that time -- and more than half the hourly flying costs -- last year, according to the test and evaluation office.

The Air Force says the F-22 cost $44,259 per flying hour in 2008; the Office of the Secretary of Defense said the figure was $49,808. The F-15, the F-22's predecessor, has a fleet average cost of $30,818.

'Compromises'

Darrol Olsen, a specialist in stealth coatings who worked at Lockheed's testing laboratory in Marietta, Ga., from 1995 to 1999, said the current troubles are unsurprising. In a lawsuit filed under seal in 2007, he charged the company with violating the False Claims Act for ordering and using coatings that it knew were defective while hiding the failings from the Air Force.
He has cited a July 1998 report that said test results "yield the same problems as documented previously" in the skin's quality and durability, and another in December that year saying, "Baseline coatings failed." A Lockheed briefing that September assured the Air Force that the effort was "meeting requirements with optimized products."

"When I got into this thing . . . I could not believe the compromises" made by Lockheed to meet the Air Force's request for quick results, said Olsen, who had a top-secret clearance. "I suggested we go to the Air Force and tell them we had some difficulties . . . and they would not do that. I was squashed. I knew from the get-go that this material was bad, that this correcting it in the field was never going to work."

Olsen, who said Lockheed fired him over a medical leave, heard from colleagues as recently as 2005 that problems persisted with coatings and radar absorbing materials in the plane's skin, including what one described as vulnerability to rain. Invited to join his lawsuit, the Justice Department filed a court notice last month saying it was not doing so "at this time" -- a term that means it is still investigating the matter, according to a department spokesman.

Ahern said the Pentagon could not comment on the allegations. Lockheed spokeswoman Mary Jo Polidore said that "the issues raised in the complaint are at least 10 years old," and that the plane meets or exceeds requirements established by the Air Force. "We deny Mr. Olsen's allegations and will vigorously defend this matter."

There have been other legal complications. In late 2005, Boeing learned of defects in titanium booms connecting the wings to the plane, which the company, in a subsequent lawsuit against its supplier, said posed the risk of "catastrophic loss of the aircraft." But rather than shut down the production line -- an act that would have incurred large Air Force penalties -- Boeing reached an accord with the Air Force to resolve the problem through increased inspections over the life of the fleet, with expenses to be mostly paid by the Air Force.

Sprey said engineers who worked on it told him that because of Lockheed's use of hundreds of subcontractors, quality control was so poor that workers had to create a "shim line" at the Georgia plant where they retooled badly designed or poorly manufactured components. "Each plane wound up with all these hand-fitted parts that caused huge fits in maintenance," he said. "They were not interchangeable."

Polidore confirmed that some early parts required modifications but denied that such a shim line existed and said "our supplier base is the best in the industry."

The plane's million-dollar radar-absorbing canopy has also caused problems, with a stuck hatch imprisoning a pilot for hours in 2006 and engineers unable to extend the canopy's lifespan beyond about 18 months of flying time. It delaminates, "loses its strength and finish," said an official privy to Air Force data.

In the interview, Ahern and Air Force Gen. C.D. Moore confirmed that canopy visibility has been declining more rapidly than expected, with brown spots and peeling forcing $120,000 refurbishments at 331 hours of flying time, on average, instead of the stipulated 800 hours.

There has been some gradual progress. At the plane's first operational flight test in September 2004, it fully met two of 22 key requirements and had a total of 351 deficiencies; in 2006, it fully met five; in 2008, when squadrons were deployed at six U.S. bases, it fully met seven.

"It flunked on suitability measures -- availability, reliability, and maintenance," said Christie about the first of those tests. "There was no consequence. It did not faze anybody who was in the decision loop" for approving the plane's full production. This outcome was hardly unique, Christie adds. During his tenure in the job from 2001 to 2005, "16 or 17 major weapons systems flunked" during initial operational tests, and "not one was stopped as a result."

"I don't accept that this is still early in the program," Christie said, explaining that he does not recall a plane with such a low capability to fulfill its mission due to maintenance problems at this point in its tenure as the F-22. The Pentagon said 64 percent of the fleet is currently "mission capable." After four years of rigorous testing and operations, "the trends are not good," he added.

Pentagon officials respond that measuring hourly flying costs for aircraft fleets that have not reached 100,000 flying hours is problematic, because sorties become more frequent after that point; Ahern also said some improvements have been made since the 2008 testing, and added: "We're going to get better." He said the F-22s are on track to meet all of what the Air Force calls its KPP -- key performance parameters -- by next year.

But last Nov. 20, John J. Young Jr., who was then undersecretary of defense and Ahern's boss, said that officials continue to struggle with the F-22's skin. "There's clearly work that needs to be done there to make that airplane both capable and affordable to operate," he said.

When Gates decided this spring to spend $785 million on four more planes and then end production of the F-22, he also kept alive an $8 billion improvement effort. It will, among other things, give F-22 pilots the ability to communicate with other types of warplanes; it currently is the only such warplane to lack that capability.

The cancellation decision got public support from the Air Force's top two civilian and military leaders, who said the F-22 was not a top priority in a constrained budget. But the leaders' message was muddied in a June 9 letter from Air Combat Cmdr. John D.W. Corley to Chambliss that said halting production would put "execution of our current national military strategy at high risk in the near to mid-term." The right size for the fleet, he said, is 381.
Fatal Test Flight

One of the last four planes Gates supported buying is meant to replace an F-22 that crashed during a test flight north of Los Angeles on March 25, during his review of the program. The Air Force has declined to discuss the cause, but a classified internal accident report completed the following month states that the plane flew into the ground after poorly executing a high-speed run with its weapons-bay doors open, according to three government officials familiar with its contents. The Lockheed test pilot died.

Several sources said the flight was part of a bid to make the F-22 relevant to current conflicts by giving it a capability to conduct precision bombing raids, not just aerial dogfights. The Air Force is still probing who should be held accountable for the accident.

Interesting Article:coffee:
 
since the J-11 not even close to SU30MKI,i think PLA should try this


c419460349a11b365d77f575cf726486.jpg
 
Status
Not open for further replies.
Back
Top Bottom