What's new

SEZs in Bangladesh: India to finalize cos list May 29

EastBengalPro

FULL MEMBER
Joined
Jun 3, 2014
Messages
690
Reaction score
0
Country
Bangladesh
Location
Bangladesh
A number of Indian developers like Tata Group, DLF and Mahindra, are in the fray for developing the economic zones in Bangladesh.

In all, about 25 developers are likely to be selected. The list of companies will soon be handed over to the Bangladesh government for their consideration.

Mongla and Bheramara in Bangladesh were identified as possible locations for the SEZs, according to a report by http://www.thehindu.com.

The Indian central government will, on May 29, finalise the list of Indian companies interested in developing Special Economic Zones (SEZs) in Bangladesh.

The development comes nearly two years after India and Bangladesh signed a Memorandum of Understanding (MoU) in June 2015 for “cooperation on establishing Indian Economic Zone (IEZ) in Bangladesh.”

The meeting — slated for May 29 to finalise a list — will be attended by officials including from the Ministries of External Affairs and Commerce as well as representatives from industry bodies including the FICCI and the CII.

The Commerce Ministry-recognised bodies including Federation of Indian Export Organisations and EPCES (Export Promotion Council for Export oriented units and SEZs) will also take part in the meeting, which will discuss a study done in this regard by consulting firm PwC.

According to industry sources, the companies keen on developing SEZs in Bangladesh include DLF, Mahindra, Unitech, Tata group, K Raheja Corp, Assotech and Phoenix Group.

As per the India-Bangladesh MoU, “the construction of the Zone (IEZ) and Indian investment in the Zone will be facilitated through the concessional Line of Credit (LoC) extended by the Government of India to the Government of Bangladesh.”

The MoU, aimed at increasing Indian investment in Bangladesh and giving a greater role to the private sector, was inked during the Bangladesh visit of Prime Minister Narendra Modi in June 2015.

http://www.thefinancialexpress-bd.c...Bangladesh:-India-to-finalize-cos-list-May-29
 
.
How many SEZs will be given to India? Do we have a list of countries by SEZs awarded so far?
 
.
How many SEZs will be given to India? Do we have a list of countries by SEZs awarded so far?

1 Mongla EZ, Mongla, Bagerhat
2 Mirsarai EZ, Mirsarai, Chittagong
3 Anwara EZ (Gahira), Anwara Chittagong
4 Shrihatta EZ(Sherpur), Sherpur Moulavibazar
5 Sirajganj EZ (Adjacent to Bangabandhu Bridge), Sirajganj Sadar & Belkuchi Sirajganj
6 Shreepur EZ (Nayanpur), Shreepur Gazipur
7 Narayanganj EZ, Bandar & Sonarga Narayanganj
8 Panchghar EZ, Debiganj Panchghar,
9 Anawra -2 (CEIZ), Chittagong
10 Narsingdi EZ, Narsingdi Sadar Narsingdi
11 Dhaka IT SEZ, Karanigonj , Dhaka
12 Sabrang, Tourism SEZ, Tacknaf , Cox’s bazar
13 Ashugonj EZ, Ashugonj Brahmanbaria
14 Nilphamarai EZ, Nilphamari Sadar Nilphamari
15 Manikgnnj(BIWTA old Aricha Ferighat), Shibaloy Manikganj
16 Jamalpur Sadar EZ, Jamalpur sadar Jamalpur
17 Bheramara EZ, Bheramara Kustia
18 Agailjhara EZ, Agailjhara Barishal
19 Bhola sadar EZ, Bhola sadar Bhola
20 Gopalganj Economic Zone , Kotalipara , Gopalganj
21 Dhaka Economic Zone, Dhohar, Dhaka
22 Habigonj Economic Zone, Chunurughat, Habigong
23 Shariatpur Economic Zone, Jajira, Jajira Shariatpur
24 Shariatpur Economic Zone, Gosharhat, Gosharhat, Shariatpur
25 Jaliardip Economic Zone EZ, Taknaf, Coxe’s Bazar
26 Moheshkhali -1 EZ , Cox’s bazar
27 Cox’s Bazar Special EZ ,Moheshkhali, Cox’s Bazar
28 Moheshkhali -2 EZ , Kamlarsora, Cox’s bazar
29 Moheshkhali -3 EZ , Dholghata, Cox’s bazar
30 Narayanganj EZ, Sonargaon
31 Nator Economic Zone, (Agro Food Processing Zone) Nator
32 Araihazar Economic Zone , Araihazar, Narayanganj
33 Moheshkhali Special Economic Zone, Cox’s Bazar
34 Rajshahi Economic Zone, Rajshahi
35 Sherpur Economic Zone
36 Feni Economic Zone
37 Mongla EZ, Mongla, Bagerhat (For Indian Investors)

Private Sites :

38 Garments Shilpa Park by BGMEA. Gagaria
39 A K Khan PEZ, Polash Narshindi
40 Abdul Monem PEZ, Gojaria, Munsigonj
41 Megna Industrial Economic Zone PEZ, Sonargaon, Narayangonj
42 Megna Economic Zone PEZ, Sonargaon, Narayangonj
43 Famkom Economic Zone PEZ, Rampal, Bagerhat
44 Garments Shilpa Park BGMEA. Gagaria Munsiganj
45 Comilla Economic Zone , Comilla
46 Aman Private EZ, Narayangonj
47 Bay Private EZ, Gazipur
 
.
How many SEZs will be given to India? Do we have a list of countries by SEZs awarded so far?

Bangladesh Export Zones Authority (BEZA) agreed to give two different SEZ's to India, namely at Mongla and Kushtia. This is out of 55 Govt. SEZ's in various stages of readiness at this time, bulk of which will go to China, Korea and Japan. There are also eleven private SEZ's. Govt. eventually wants to build hundred different SEZ's by 2025 or sooner, my understanding, should be mostly along the Dhaka-Chittagong Highway corridor on the way to Chittagong, patterned along how China built its coastal SEZ's. There is a huge one almost ready at Mirsarai near Chittagong. Some will also be built around Payra, the new port.

Indians are *very* interested in Mongla of course, given its wonderful accessibility to marine transport, the port is mature (dates from the sixties) and is fully equipped for container handling and logistics. There are bulk handling facilities as well, bulk-unloaders/conveyors for cement and LPG docks are nearby. The Indian SEZ at Mongla will be built on Indian Investors (G2G) initiative/framework and will have 110 acres of area. Their Govt. will bear the cost however Indian companies will build it as well, Bangladesh will simply provide land and of course, labor.

The Indian SEZ for Kushtia is simply to utilize Bangladeshi labor to manufacture items and re-export to India, given Bangladeshi labor rates are half that of India.

Here are some news articles from last year,

The first meeting of the Bangladesh-India Joint Working Group (JWG) on the establishment of Indian Economic Zones (IEZs) in Bangladesh was held at the Pan Pacific Sonargaon Dhaka, May 10, 2016.
10-05-2016
Minute-Signing-First-JWG-Meeting-1024x683.jpg


The first meeting of the Bangladesh-India Joint Working Group (JWG) on the establishment of Indian Economic Zones (IEZs) in Bangladesh was held at the Pan Pacific Sonargaon Dhaka, May 10, 2016.

The Bangladeshi delegation was led by Mr. S. M. Shawkat Ali, Executive Member (Additional Secretary), BEZA and the Indian delegation was led by Ms. Sripriya Ranganathan, Joint Secretary (Bangladesh & Myanmar), Ministry of External Affairs.

The two sides discussed in detail about the modalities of establishing IEZs in Bangladesh. Indian side informed in the meeting that they have selected firms to carry out feasibility study and the Indian High Commission in Dhaka will carry out the EIA and SIA. All the process in this regard will be completed within 6 (six) months. They also wanted to know about the modalities being followed in case of the G to G EZs and they appreciated BEZAs initiatives of forming Special Purpose Company (SPC) in case of China EZ and described it as the best model to follow to make the EZ viable.

In regards the utilization of the 2nd Line of Credit (LOC) of US$ 88 million for Bheramera and Mongla IEZs, it was decided by both sides that the said LOC could be immediately activated for the IEZ planned in Bheramera. For the Mongla site, it was decided that utilization of the LOC will be finalized once the feasibility study was completed. If the Mongla site is not considered feasible, it was decided that the LOC could be utilized for an alternate site agreed to by the two sides.

On the US$ 90 million LOC for IT SEZs in Keraniganj and Mirsarai areas, the Indian side conveyed that necessary initial approval have been obtained and the formal sanction will be conveyed to the Bangladeshi side shortly.

MoU signed between Bangladesh and India on establishment of two Economic Zones for Indian investors
07-06-2015
IndianBD-PM.jpg


We (BEZA) have signed an MOU with India for establishing 2 Economic Zones for the Indian investors. Foreign Secretary Jaishankar has signed on behalf of India. Honorable PM Sheikh Hasina handed over a Replica Map of the 2 EZs (Mongla & Kushtia) to the Indian Prime Minister Narendra Modi at Shapla Hall, PMO. India will extend credit facility to develop the EZs.

__________________________________________________________________
However, giving SEZ's to Indians is one thing, having them finish it is another.....read the following on Indian management of construction projects in Myanmar,

The Trouble With India's Projects in Myanmar
India has great ambitions for infrastructure construction in Myanmar, but falls short in implementation.

By Sudha Ramachandran
September 21, 2016

thediplomat_2016-09-21_13-03-25-386x257.jpg

Workers from Indian conglomerate Essar Group construct a new port in Sittwe, Myanmar (May 19, 2012).
Image Credit: REUTERS/Damir Sagolj


Myanmar President Htin Kyaw’s recent visit to India, the first by the head of a civilian government in Myanmar in over five decades, saw the two sides focus on improving connectivity and counterinsurgency cooperation.

In addition to reaffirming their commitment to “fight the scourge of terrorism and insurgent activity in all its forms and manifestations,” and “not allowing any insurgent groups to use their soil for hostile activities against the other side,” the two sides signed four agreements, two of which are aimed at accelerating completion of the much-delayed India-Myanmar-Thailand (IMT) highway.

Under these agreements Delhi has undertaken the construction of 69 bridges, including approach roads on the Tamu-Kyigone-Kalewa section of the IMT highway, and also upgrade the Kalewa-Yargi section of this highway. The new deadline for completion of the IMT trilateral highway has been set at 2020.

The 1,400-km-long IMT highway links Moreh in the northeastern Indian state of Manipur with Mae Sot in Thailand via Myanmar. It is the first overland link between India and Southeast Asia.

India is implementing several infrastructure projects in Myanmar. These are aimed at accessing Myanmar’s rich natural resources, improving connectivity between the two neighbors, and facilitating bilateral travel and trade.

Additionally, since Myanmar is India’s land-bridge to Southeast Asia, this infrastructure is aimed at linking India to markets in the region. It is expected to boost development in India’s economically backward northeastern states, several of which share borders with Myanmar. Importantly, Myanmar provides landlocked northeast India with an outlet to the sea, a route that is shorter than the current one via the Siliguri Corridor to Kolkata port.

India began construction of the 160-km-long India-Myanmar Friendship Road linking Moreh with Kalewa and Kalemyo in Myanmar in 1997 to link to Southeast Asian markets and to provide a fillip to its “Look East” policy. In 2002, India, Myanmar and Thailand decided to make this a trilateral highway by extending this road to Mae Sot. Delhi now plans to extend the IMT highway to Cambodia, Laos, and Vietnam.

Clearly, India doesn’t lack for ambition when it comes to infrastructure building. Where it falls short, however, is in implementing projects; almost every Indian project in Myanmar is running behind schedule.

The IMT highway, for instance, was scheduled to be ready by 2015. Indeed, a bus service on this route was inaugurated late last year only to be shut down immediately as bridges along the route that were of World War II vintage were found to be unusable. Hence the signing of agreements during Htin Kyaw’s visit that will see India repairing bridges and approach roads with a view to putting the trilateral highway project back on track.

Like India, China is engaged in upgrading ports, extracting oil, and building roads and bridges in Myanmar. Indeed the two Asian giants often compete for infrastructure projects here.

According to Khriezo Yhome, research fellow at the New Delhi-based Observer Research Foundation’s Neighborhood Regional Studies Initiative, “In terms of the objectives of accessing natural resources or building strategic alternative routes in and through Myanmar, there is not much of a difference between what Delhi and Beijing want to achieve.”

However, India’s investment in Myanmar is a fraction of that of China. India invested just over $224 million in Myanmar during fiscal year 2015-2016, and no new investments were made in the first four months of fiscal 2016-17. In comparison, China invested $3.3 billion in Myanmar in 2015-16.

“China has left India far behind” with regard to infrastructure projects, Yhome told The Diplomat, drawing attention to the delays plaguing India’s infrastructure projects in Myanmar. Lack of coordination among different implementing agencies, poor monitoring, and financial constraints are among the main reasons for India’s failure to meet deadlines, he said.

There are other challenges too. “In areas where some Indian infrastructure projects, particularly roads and bridges, are being implemented, feeder roads are usable only for some months due to difficult terrains,” Yhome observed. There is the question of security too. Roads linking India with Myanmar run through insurgency-wracked regions, “creating problems for smooth implementation of projects,” he pointed out.

In addition, “flawed feasibility studies are hindering timely completion of projects,” an official in India’s Ministry of Development of North Eastern Region (MDONER) told The Diplomat. This is the case with the Kaladan multi-modal transport project, which envisages linking Lawngtlai in India’s northeastern state of Mizoram via a road and the River Kaladan to the deep-sea port at Sittwe in Myanmar’s Rakhine province.

The India-funded and executed project involves developing Sittwe to handle 20,000-ton vessels (up from the 2,000 to 3,000-ton ships it handles at present); dredging the River Kaladan from Sittwe to Paletwa (a 158 km long stretch) to improve its navigability; building an inland terminal at Paletwa where cargo will be shifted from barges to trucks; and constructing a 129-km-long highway linking Paletwa to the Indian border.

However, the Kaladan project is running behind schedule. “Every stage of the project has suffered delays,” the MDONER official said, pointing to the fact that 13 years after the project was conceived it remains incomplete.

Delhi brought the multi-modal transport project to the Myanmar government in 2003. It then took five years for the two sides to enter into a framework agreement and it was only in 2010 that construction work began. It was originally due to be completed in July 2013. Several more deadlines were set and missed.

According to the MDONER website, the Myanmar government delayed in handing over land at Sittwe and Kaletwa to India.

But also, India had to revise its plans midstream. Under the original plan, the inland terminal was to be located at Kaletwa, north of Paletwa. However, the Kaladan River was found to be unnavigable beyond Paletwa. This required the road from Lawngtlai to be extended up to Paletwa.

This “underestimation of the road length on the Myanmar side” has resulted in cost escalations. A “more thorough feasibility report” could have prevented the “inordinate delay” in the project’s completion and the added cost incurred, the MDONER official said, adding that India’s “failure to deliver projects on time” in Myanmar has eroded its credibility there.

Like Chinese infrastructure projects in Myanmar, some of India’s projects are also opposed by activists and local communities. The Kaladan movement, an umbrella group of civil society organizations and environmental groups, for instance, has criticized India for opacity in the implementation of the project. Local communities were apparently not consulted or informed about the project’s impact. They are not being included in the project’s benefits and are being discriminated against with regard to wages. Activists are also drawing attention to the Kaladan project’s destructive impact on the environment and impacts on local livelihoods.

India has denied some of these allegations. While admitting that an environmental impact assessment was not done for the Kaladan project, Delhi argues that this is not necessary as the dredging of the river involves “minimum intervention.”

However, Yhome points out that India has been responsive to concerns raised by activists. It has “addressed these issues and been willing to discuss any issue with local protesters.”

Importantly, when activists raised environmental and social concerns over India’s construction of the Htamanthi hydropower project, with an installed capacity of 1,200 MW, and the Shwezaye hydropower project with 880 MW on the Chindwin River, India “suspended the projects at the request of the Myanmar government,” Yhome said.

This is in sharp contrast to China’s refusal to pull out of unpopular projects in Myanmar. The Myanmar government’s decision to suspend the $3.6 billion Myitsone dam project in response to mass protests against the project evoked Beijing’s ire. Five years after the suspension, Myanmar is still under pressure from China to reverse the decision.

Myanmar’s civilian government is reportedly keen to diversify its economic partners in order to reduce China’s overwhelming influence over the economy. This would open up greater opportunity for India to play a role in Myanmar and expand its influence there.

The question is whether India would accelerate implementation of its infrastructure projects there. Should India continue to drag its feet in this regard, it could lose future projects to western and Asian investors like Japan. The window of opportunity opening up for India will not remain open forever.

Dr. Sudha Ramachandran is an independent journalist and researcher based in Bengaluru, India. She writes on South Asian political and security issues.
 
.
How many SEZs will be operational in 2-3 years? Surprisingly quite a few of them are in Coxs bazar. Will I get my wish granted, a Coxs Bazar division?

And my most important question, lets say a product is manufactured in a SEZ given to China, India or Japan. When this product is sold, is it labelled as "Made In Bangladesh" or "Made in China/India/Japan"?
 
. .
How many SEZs will be operational in 2-3 years? Surprisingly quite a few of them are in Coxs bazar. Will I get my wish granted, a Coxs Bazar division?

And my most important question, lets say a product is manufactured in a SEZ given to China, India or Japan. When this product is sold, is it labelled as "Made In Bangladesh" or "Made in China/India/Japan"?

'Country of origin' rules imply that they all be labeled "Made In Bangladesh" since all SEZ's are within the border of Bangladesh.
 
.
Whats going to be produced in this SEZ
Depends on which manufacturer takes it. If it is given to TATA or Mahindra then I think they'll be making Vehicles? Or at least parts of vehicles?
 
.
Depends on which manufacturer takes it. If it is given to TATA or Mahindra then I think they'll be making Vehicles? Or at least parts of vehicles?

Well if they are going to make parts of vehicles from scratch, they are going to assemble there too. No real point making parts and shipping them for assembly elsewhere...given India has fully developed supply chains within itself already. They might assemble kits from those supply chains though in BD (esp to start with). I guess we will wait and see.

Mahindra is also pretty aggressive with tractors. Maybe they will assemble/produce those in this SEZ if they are chosen.
 
Last edited:
.
Back
Top Bottom