What's new

SECOND Assembly Line for SUBMARINES Inaugurated at Mazagaon Dockyard

Stephen Cohen

BANNED
Joined
Nov 21, 2014
Messages
8,456
Reaction score
-37
Country
India
Location
India
Manohar Parrikar inaugurates submarine assembly workshop in Mazgaon

Defence minister Manohar Parrikar, who was at the Mazagon Dock Limited (MDL) on Saturday to inaugurate a submarine assembly workshop, said the level of indigenisation in submarine construction should be much higher than the present.

He said, "The overall level of indigenisation in the next line of submarines must be substantially higher." At present, MDL is building six Scorpene class of submarines for the Indian Navy, with around 35% of indigenisation. The minister also emphasised that the defence Public Sector Undertakings (PSU) should undertake orders to export ships by having a dedicated "export cell".

The newly built Submarine Marine Assembly Workshop is a pre-engineered building structure to handle construction of multiple submarines simultaneously.

Built at a cost of Rs153 crore, it will make it possible to assemble five submarines in the workshop at the same time.


The workshop has features such as rain water harvesting, sewage treatment plan, grey water treatment plant, oily water separator plant for treatment of sewage, grey water and oily water respectively, with zero discharge into the municipal drains.

This facility will enable MDL to go in for a second line of submarines concurrently.

The current construction of Scorpene class submarines is taking place at its East Yard in collaboration with DCNS of France. Kalvari, the first submarine of this class, is expected to join the Indian Navy later in the year.

Talking about MDL's performance, Parrikar said the production value has improved from Rs2,865 crore in the year 2013-14 to Rs4,009 crore in 2015-16, which is around a 40% increase.

http://www.dnaindia.com/mumbai/repo...ubmarine-assembly-workshop-in-mazgaon-2217627

 
. .
CjmGnuPVAAETvGa.jpg
CjmIy2wVEAE44Ex.jpg
CjmHpYbVAAER0rC.jpg
CjmIzo0VAAAhNUf.jpg
 
.
Keep churning more and more subs !! Quiter the better !! AIP is must.
 
.
Hope the QC here is better than that for the Kilo Upgrade yard.
 
. . .
considering sub fleet plans, it is important that Mazgaon and in future pipvav shipyards gear up for increased job load as Cochin will be busy with AC and new Vizag facility with N subs. We must also create dedicated maintenance and overhaul facilities for the significantly large sub fleet in next decade or so.
 
.
This is for Scorpenes ? and 5 Subs same time ?



Have the rules of PDF been relaxed fr Mods ?
What rules?
Find me a violation of rules?

Your Indian butt cant take a simple concern by a Pakistani other than offensive.

Rule are "Indians only" :rofl:
I will make it sure from now on thanks to you two and your pithiful mentalities.
 
.
Built at a cost of Rs153 crore, it will make it possible to assemble five submarines in the workshop at the same time.

This facility will enable MDL to go in for a second line of submarines concurrently.

so based on the article it is two submarines or five subs ? o_O
 
. .
I think we will start work on More Scorpenes soon

P 75- I will have to wait for some time
 
. . . .

Pakistan Defence Latest Posts

Back
Top Bottom