What's new

PM formally inaugurated the Ship lift and transfer system at KS&EW - Aug 2021

Pakistan Ka Beta

SENIOR MEMBER
Joined
Aug 7, 2019
Messages
3,490
Reaction score
9
Country
Pakistan
Location
Pakistan












A 7300-ton capacity Ship Lift and Transfer System was inaugurated on 10th August, 2021, at Karachi Shipyard and Engineering Works (KS&EW). Prime Minister of Pakistan, Mr. Imran Khan graced the occasion as Chief Guest. Chief of the Naval Staff, Admiral Muhammad Amjad Khan Niazi was also present at the occassion. The contract of the Ship Lift and Transfer System was signed under the auspices of Ministry of Defense Production with the funding provided by Planning Commission of Pakistan, as a PSDP project. The Ship Lift and Transfer System will provide docking and repair facilities to marine vessels up to 7300 ton. At one time it can accommodate 12 ships. The facility will contribute to the productivity of Karachi Shipyard and Engineering Works and will fulfill ever increasing demand of the shipping industry in the country. The works generated by enhancing the ship repair capacity will outflow to the public and private industrial sectors.

On the occasion, the honorable Chief Guest congratulated Karachi Shipyard, Pakistan Navy and Ministry of Defense Production for setting up such a modern facility in Pakistan. He said that now Karachi Shipyard will stand taller in the regional maritime picture. The Prime Minister considered this facility a gift to the Pakistani nation, on its 75th Independence Day.

The PM emphasized that Government is committed to support local industry and is working on friendly policies to enhance shipping and fishing in our waters enhancing the business for Karachi Shipyard. He said that this facility is a true testament of government’s efforts towards industrialization, capacity building and self-reliance. He hoped that the drive towards higher grounds will continue in future and the facility will be used to the fullest in the role envisaged by the planners and maximum benefits will be accrued from the investment for poverty alleviation. He hoped that SLTS will be remembered as the precursor of the revolution his government is endeavoring for in the maritime sector.

Earlier, MD KS&EW Rear Admiral Athar Saleem in his welcome address said that the project envisaged increase in the existing ship repair capacity and efficiency of Karachi Shipyard. He said that the system brings in a revolutionary concept against the existing docking technology, which can at the moment handle and repair only one ship at a time. Advantages of the new facility are that a ship can be recovered from sea, transferred to any of the repair stations and the Ship Lift can then be immediately available to lift / lower next ship, thereby increasing productivity exponentially according to number of available parking spaces. This will significantly increase Karachi Shipyard’s revenue thereby high tax returns and more job opportunity for locals.






navy 2.jpg
Navy 1.jpg


navy 4.jpg

navy 3.jpg




Open below link to understand about this system .




TTL-01-TTL-692x360.png


TTS Group Syncrolift ship lift-and-transfer system. Photo credit: TTS Group
Daily News
Jul 2, 2017 Bilal Khan -
PAKISTAN’S KSEW INKS CONTRACT WITH TTS GROUP FOR SYNCROLIFT SHIP LIFT-AND-TRANSFER SYSTEM
 
Last edited:
.
I don't understand. Can anyone explain this to me ?
 
.
I don't understand. Can anyone explain this to me ?


TTL-01-TTL-692x360.png


TTS Group Syncrolift ship lift-and-transfer system. Photo credit: TTS Group
Daily News
Jul 2, 2017 Bilal Khan -
PAKISTAN’S KSEW INKS CONTRACT WITH TTS GROUP FOR SYNCROLIFT SHIP LIFT-AND-TRANSFER SYSTEM

 
. . .
PM Imran inaugurates ship lift and transfer system at Karachi Shipyard

Dawn.com
August 10, 2021


Prime Minister Imran Khan addresses the inaugural ceremony of a ship lift and transfer system at the Karachi Shipyard. — DawnNewsTV


Prime Minister Imran Khan addresses the inaugural ceremony of a ship lift and transfer system at the Karachi Shipyard. — DawnNewsTV


Prime Minister Imran Khan on Tuesday inaugurated the ship lift and transfer system at the Karachi Shipyard during a rare day-long visit to the port city.

The prime minister will later chair a meeting at the Karachi Port Trust (KPT) to review the Rs1.1 trillion Karachi Transformation Plan as well.


Addressing the inauguration ceremony, the prime minister expressed pleasure at the progress in using technology for various tasks. He said it was not just a matter of using technology for its own purposes but also using it to make money.

"Now we will be able to [service] 12 ships and ship lift 7,400 tonnes. This is progress. We have to save the country's money using technology," he said, adding that foreign exchange reserves would be saved due to the inaugurated facility being available here now,

The prime minister said that as the new system's services developed, they could be provided to others as well and used to earn foreign exchange.

He added that the challenge ahead was the increasing pressure on the current account due to increasing economic development and outflow of dollars.

"So we will earn dollars from what you have done today and we will sell these services ahead. We have to do everything to promote our exports, encourage overseas Pakistanis to send remittances through banking channels, attract foreign investment so money comes from abroad and stop money laundering which we are completely focusing on now."

The premier added that money laundering was the "biggest problem" of the developing world with corrupt rulers transferring money abroad.

Prime Minister Imran Khan said that apart from the above measures, import substitution was needed as well. "This is the direction of our country and we have set out on it," he said.

The premier lamented that Pakistan had not realised its potential in the past and instead ventured on an "easy path", becoming an import-led economy that became dependent on foreign aid.

Now, however, he was "happy that the effort is again underway to stand on our own feet".
 
. .
We will just have to see how this technology works
I personally like the old fashion approach just build beside the shore and then drop it in

Technically we do have a 700 km shore line
 
.
Back
Top Bottom