Kharian_Beast
FULL MEMBER
- Joined
- Sep 6, 2008
- Messages
- 1,645
- Reaction score
- 0
One of the hardest tanks to get information about, any updates or information regarding AK2 please post here.
Last edited:
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
One of the hardest tanks to get information about, any updates or information regarding AK2 please post here.
- better protection
- revised hull
- faster engine
- refined weapons and suites
- less visible on radar
- Larger caliber AA gun (remote controlled function)
- made 100% in Pakistan
I think when AK2 is introduced certain subsystems may be used to upgrade the existing Al Khalids to give a degree of commonality for example like the 125mm guns present on all current Pakistani MBTs.
come on yaar... this is not AK2 its a type-90 with additional reactive armors.. AK2 will will be a total new looking beast.... as far as i know.. PAk is negotiating with turkey for joint venture..
Whats to discuss? The project is still in planning stages there are no prototypes yet.
There does seem to be two trains of thought on its design one a revised version of the Chinese Type 99 and the other the joint Turkish Project.
Hi guys this is my first post so greeting, i don't mean to rude but their are actuall information regarding the AK2 tank? What i can tell is i dont post very often for the reason as i work with one of Pakistan leading defence contractors. AK1 MBT was a faliure (off the record) it suffers from who massive technical problems in regards to its mixture technologies. The Pakistan Army have with not commited to acquireing a large number, the Al Zarra has not meet Paksitan Army recuirements. The Saudi government finaced most of AK1 MBT and have rejected on simiar grounds as the Pakistan Army did.
The sad out come is the the Pakistan Army is heavily diss satisfied with both MBTs. Funding as re alocated towards aviation due to operation in the tribal area and complaints from junior offices of equipment short falls and lack of air mobility in the face of a resourcfull enemy. However defence contractors have recieved the go head to present MBT solutions to GHQ for consideration for the future. Although an offer from the Ukaraine for T80ud license is on the table however i think lack funds will end up putting this offer on hold.
Pakistan army test pilots have been Spain testing the Tiger attack helicopter three weeks ago. The evaluation lasted 5 days including night testing, th evaluation report is to be submitted to the department of defence procurment GHQ and COAS at the end of this month.
I will keep you guys updates on anything else i hear.
regards RS4
Whats to discuss? The project is still in planning stages there are no prototypes yet.
There does seem to be two trains of thought on its design one a revised version of the Chinese Type 99 and the other the joint Turkish Project.
Hi guys this is my first post so greeting, i don't mean to rude but their are actuall information regarding the AK2 tank? What i can tell is i dont post very often for the reason as i work with one of Pakistan leading defence contractors. AK1 MBT was a faliure (off the record) it suffers from who massive technical problems in regards to its mixture technologies. The Pakistan Army have with not commited to acquireing a large number, the Al Zarra has not meet Paksitan Army recuirements. The Saudi government finaced most of AK1 MBT and have rejected on simiar grounds as the Pakistan Army did.
The sad out come is the the Pakistan Army is heavily diss satisfied with both MBTs. Funding as re alocated towards aviation due to operation in the tribal area and complaints from junior offices of equipment short falls and lack of air mobility in the face of a resourcfull enemy. However defence contractors have recieved the go head to present MBT solutions to GHQ for consideration for the future. Although an offer from the Ukaraine for T80ud license is on the table however i think lack funds will end up putting this offer on hold.
Pakistan army test pilots have been Spain testing the Tiger attack helicopter three weeks ago. The evaluation lasted 5 days including night testing, th evaluation report is to be submitted to the department of defence procurment GHQ and COAS at the end of this month.
I will keep you guys updates on anything else i hear.
regards RS4
Hi guys this is my first post so greeting, i don't mean to rude but their are actuall information regarding the AK2 tank? What i can tell is i dont post very often for the reason as i work with one of Pakistan leading defence contractors. AK1 MBT was a faliure (off the record) it suffers from who massive technical problems in regards to its mixture technologies. The Pakistan Army have with not commited to acquireing a large number, the Al Zarra has not meet Paksitan Army recuirements. The Saudi government finaced most of AK1 MBT and have rejected on simiar grounds as the Pakistan Army did.
The sad out come is the the Pakistan Army is heavily diss satisfied with both MBTs. Funding as re alocated towards aviation due to operation in the tribal area and complaints from junior offices of equipment short falls and lack of air mobility in the face of a resourcfull enemy. However defence contractors have recieved the go head to present MBT solutions to GHQ for consideration for the future. Although an offer from the Ukaraine for T80ud license is on the table however i think lack funds will end up putting this offer on hold.
Pakistan army test pilots have been Spain testing the Tiger attack helicopter three weeks ago. The evaluation lasted 5 days including night testing, th evaluation report is to be submitted to the department of defence procurment GHQ and COAS at the end of this month.
I will keep you guys updates on anything else i hear.
regards RS4