ChineseLuver
FULL MEMBER
- Joined
- Aug 18, 2011
- Messages
- 161
- Reaction score
- 0
Credits to: Cirr
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
If need to delay for a few years, why not go for steam catapult? While just let EMAL be Type003?The latest street "rumours" are that a decision has been reached on the adoption of EMALS for Type 002 CV.
It means start on the construction of the class, which was designed based on the older steam catapult system, will now be delayed by a couple of years.
Any more you like to address?Now I hope that J 15 will carry payload something better than just 2 tons.
Now I hope that J 15 will carry payload something better than just 2 tons.
Any more you like to address?
001A is in her fitting out, 002 will be next with EMALS.How many ACs are in construction and which catapult system they are using?
way way more than that for now, 7.5 ton payload, taking off from 105 meters is standard config. 9 ton from 175 meters taking-off point```we are not face saving Indian that make useless things just for the sake of itNow I hope that J 15 will carry payload something better than just 2 tons.
very very very unlikely to have EMALS on 002!001A is in her fitting out, 002 will be next with EMALS.
It is certain and confirm.way way more than that for now, 7.5 ton payload, taking off from 105 meters is standard config. 9 ton from 175 meters taking-off point```we are not face saving Indian that make useless things just for the sake of it
very very very unlikely to have EMALS on 002!
dont know much of the blueprint or technical details, but as they said, everything was designed according to Steam Catapult, power management system, battle management system, flying deck traffic plans, code of conduct, cables, layouts, factory orders, interests groups and this and that ````so it is very very unlike to change to EMALS```well I could be wrongCare to explain ?
nothing is certain,It is certain and confirm.
Go with steam catapult first. It will take 3 years for the first EMALS carrier with nuclear reactor to start building since everything needs to be redesign again. Why not make full use of these 3yrs to make Type002 and let type 003 to go for EMALS?dont know much of the blueprint or technical details, but as they said, everything was designed according to Steam Catapult, power management system, battle management system, flying deck traffic plans, code of conduct, cables, layouts, factory orders, interests groups and this and that ````so it is very very unlike to change to EMALS```well I could be wrong
nothing is certain,