What's new

Navy relieved as Gorshkov flies through sea trials

Anony

FULL MEMBER
Joined
Sep 13, 2012
Messages
677
Reaction score
-1
Country
India
Location
India
article-2380500-1B09D166000005DC-904_634x305.jpg



Aircraft carrier INS Vikramaditya (also Gorshkov), the Indian Navy’s last vessel to be delivered by a foreign shipyard, passed with flying colours when it was operated at full throttle during exhaustive sea trials in the Barents Sea in Russia on Saturday.

The trial feedback helped overcome anxiety in New Delhi about the performance of the ship, which faltered during high-speed runs last year when its boilers failed, leaving the engines unable to produce adequate power to propel the 45,000-ton vessel.

It was a major setback as the delivery of the ship, India’s second aircraft carrier, was pushed by a year.

After extensive repairs, the ship was back in the sea earlier this month for final delivery trials.

Navy personnel are onboard the vessel, keeping a hawk eye on the performance of the carrier which is going to be the flagship of its fleet in the coming decades.

Sources said the carrier touched a top speed of around 32 knots in wind and tide condition and the trials will continue to test capability of the retrofitted ship that will cost India around $2.3 billion.

The high-speed trials will continue for some more days to ensure that performance is stable. It will be followed by trial landings by the Mig-29K fighters.

The deck landings and take-offs were performed by the Russian pilots last year as well.

The navy hopes that its floating airbase will be ready for commissioning by the end of this year and its formal induction will take place in the early months of 2014.

INS Vikramaditya is now the only naval warship in a foreign shipyard.

All the remaining 41 warships are being constructed in domestic shipyards, in a major boost to the local shipbuilding industry.
 
. . . . .
good news..by the way,I think we should increase number of shipyards as we've a huge demand of ships to meet and most of our shipyards are fully occupied..
 
.
good news..by the way,I think we should increase number of shipyards as we've a huge demand of ships to meet and most of our shipyards are fully occupied..

That is not necessary. More orders need to be 'farmed out' i.e. given to private yards. That will help majorly to clear the bottlenecks.
 
.
breaking news. why hasnt anyone noticed this thread?

Guess with so many delays, a lot of us (me included) won't believe the authenticity of such news and claims till the ship actually arrives.
That said, it is very heartening to know that ship has done very well during trials and i sincerly hope INS Vikramaditya's protracted and troubled re-development story (that has stretched longer than hindi soap operas) will finally be laid to rest.
 
. . . .
They should keep Viraat running until IAC 1 joins Indian Navy.
 
. . .
If the IN can manage to do that; then certainly -yes.
Otherwise, Viraat will have to go to the bone-yard.

I think they would. May be atleast until IAC 1 starts sea trials. We gotta have two operational carriers at all times, its about time.
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom