What's new

Modernized by Turkey, Pakistan's Agosta 90B submarine to launch soon

Status
Not open for further replies.

Crystal-Clear

SENIOR MEMBER
Joined
Nov 28, 2017
Messages
5,832
Reaction score
-2
Country
Pakistan
Location
United Arab Emirates
The first vessel in the Pakistani Naval Forces' Agosta 90B Class Submarine Modernization Project, which provided Turkey with the first export in submarine design and engineering services, will be launched this month.

In 2016, Defense Technologies Engineering and Trade (STM) won the modernization tender in a competition with a $350 million contract against a French company that builds submarines.
As part of the project for the modernization of the Agosta 90B-class submarines, Defense Technologies Engineering and Trade Co. had a tough and long competition process with the French DCNS Shipyard, which carried out the design and production of the submarines. The Turkish company was evaluated as being technically and commercially superior and was chosen as the main contractor by the Pakistani Defense Ministry at the end of the tender process.
Murat İkinci, STM's general manager, told Anadolu Agency (AA) Friday that Pakistan granted the modernization project of its French-made diesel-electric submarines to a Turkish company since it had confidence in the progress and engineering experience that Turkey has achieved in this regard. Indicating that the company signed the contract a long time ago and successfully brought it up to this level, İkinci said, "Hopefully, by the end of this month, we are will complete the outfitting of our first ship and launch it and begin its tests, including diving tests."
The STM initially signed contracts for two submarines within the scope of the project. Although the contract on the third ship has not been signed yet, the STM aims to finish it quickly after the first ship's navigational experience is completed, the general manager said. "Pakistan also aims to modernize three submarines in its inventory. We can clearly say that we will sign the contract as a result of the success of the first vessel. We do not think there will be any setbacks here," he added.
The tender, which included the half-life modernization of the Agosta 90B-class submarine, was later expanded with the addition of the modernization of the second submarine. Following this, Defense Technologies Engineering and Trade Co. created new jobs within the scope of the project through the success and confidence it provided. The contract change, which included torpedo countermeasure systems and acoustic measurement sensors, is aimed at giving new capabilities to Pakistani submarines.
The project is important because it is the first time a Turkish company has been chosen as the main contractor for an overseas submarine project. This project has paved the way for the export of undersea design and engineering services for the first time.
Within the scope of modernization activities undertaken by the STM, the entire sonar suite of the submarine ship, periscope systems, and command and control system, as well as the radar and electronic support systems, are being replaced by Turkish military software developed by HAVELSAN.
KAŞİF, the geographic information system (GIS) software developed by HAVELSAN through domestic means, is being used in the infrastructure of the Command and Control System of Pakistan's submarine. The Sonar Integrated Submarine Command Control System (SEDA), developed by HAVELSAN, is also being integrated into the Agosta 90B submarine, making it Turkey's first export item in this field as well.
Moreover, ASELSAN's Zargana Torpedo Countermeasures System has also been used in the modernized Agosta 90B submarine of the Pakistan Navy.
.
.
https://www.dailysabah.com/defense/...-to-launch-soon/amp?__twitter_impression=true
.
.
Whats new in the sub?
 
Last edited:
. . .
its being modernised in Pakistan ?

by the time the last one is refitted the Chinese units should be in full swing

good times head of Pakistan sub surface force
Janab what on earth we are buying from China. The subs we are buying sure as hell are not Type 39 or Type 41 for that matter. Thailand bought Type 39 ships and ordered those 3 years after us and they already have gotten first one. We are almost paying double price for each sub so what on earth we really are buying and when will first arrive.
@Rashid Mahmood
 
.
Janab what on earth we are buying from China. The subs we are buying sure as hell are not Type 39 or Type 41 for that matter. Thailand bought Type 39 ships and ordered those 3 years after us and they already have gotten first one. We are almost paying double price for each sub so what on earth we really are buying and when will first arrive.
@Rashid Mahmood

Whatever is being bought should have been here ALREADY. Pakistan DOES NOT have another 2 to 3 years to wait for these subs due to bad Geo-strategic situation in the area. But as usual, a really terrible decision as far as the timing is concerned.
 
.
Whatever is being bought should have been here ALREADY. Pakistan DOES NOT have another 2 to 3 years to wait for these subs due to bad Geo-strategic situation in the area. But as usual, a really terrible decision as far as the timing is concerned.
The subs are taking way too long I have started to seriously wonder what exactly are we buying
 
.
Janab what on earth we are buying from China. The subs we are buying sure as hell are not Type 39 or Type 41 for that matter. Thailand bought Type 39 ships and ordered those 3 years after us and they already have gotten first one. We are almost paying double price for each sub so what on earth we really are buying and when will first arrive.
@Rashid Mahmood

specially customized specifically for PN's needs.
 
. . . . . .
No not nuke ones. Nuke subs are good for only long long deployments. They don't fit the PN criteria. AIP is better.
We can't have all our eggs in one basket , we must have sea based nukes that can hide in remote parts of the globe. Either we go full nuclear or we don't there is no half way house in this game.
 
. .
From official site;
Date: 2018 Feb.

-------------------------------------------



In addition to the design, engineering and procurement activities to be carried out as part of the project, STM will also provide integrated logistic support and training services to different units of the Pakistan Navy.

The modernisation works will include the replacement of the submarine’s entire sonar suite, periscope systems, command and control system, radar and electronic support systems. HAVELSAN- and ASELSAN-made systems will also be exported as part of the project.

Under the project, STM will make modifications on the pressure hull, the most critical structure in a submarine, by carrying out system-to-system and platform-to-system integrations for various systems, to be provided by local and foreign companies.

The project, which is now in its critical design phase, is successfully moving forward with the significant contributions of Pakistan Navy’s personnel and agencies, and in close cooperation between all the parties involved.

--------------------------------------------

https://www.stm.com.tr/en/news/announcement/pakistans-submarines-entrusted-to-stm


--------------------------------------------

Evaulating an existing 3rd party system to a brand new system is more challenging than designing from scratch. Hope Pakistan will please what they will have.
 
.
Status
Not open for further replies.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom