- In 2016 the first serial production Milgem will go in service (nr 4)
- Design of the indigenous multipurpose helicopter to finish in 2013
- Concept design of TFX fighter and Jet trainer to finish in 2014
- Feasibility study for indigenous submarine to finish in 2015
- Design of indigenous powerpack (engines) family to finish in 2016
- Turbojet prototype to finish in 2016

-Various programs from satellite development to launcher, anti satellite weapons, space jammers etc. will be given high priority in this period)

-Development of an electromagnetic bomb (EMP)
e1.jpg



Umtas to go serial production until the end of 2012
Omtas to go to serial production until 2013
Cirit Missiles to go to serial production until 2013
Low and Medium Altitude Missiles Production to be commenced until 2016
Phased Array radar to be used on different platforms until 2016
SAR Satellite to be produced until 2016

Test Centers until 2014-15 to support R&D of Turkish Defence Industry

-Land Vehicles Test Center
To serve testing the Land vehicles including Civilian automotive sectors

-High Speed Wind Tunnel
To support aircraft, rocket, missile programs

-Air Vehicles Flight Test Area

-Missile Systems Test Area
In terms of supporting SAM, Precision guided missile system programs

-UMET
Satellites test, integration and assembly center
 