What's new

JF-17 Block-3 -- Updates, News & Discussion

Here's how I see it.

If the Block III isn't unveiled in the next 13 Days, the page count will be on 540. If it doesn't happen in the next 60 Days, we'll be at 587 pages. Everyday a page is added with mostly meaningless discussion ( said mostly). We covered all the basics over & over again. We've practically raped the Block III with the same discussions and arguments.

And keep in mind the delay isn't coming from Pakistan, but China - 'cause that is where the Demo jet(s) are.
 
.
Here's how I see it.

If the Block III isn't unveiled in the next 13 Days, the page count will be on 540. If it doesn't happen in the next 60 Days, we'll be at 587 pages. Everyday a page is added with mostly meaningless discussion ( said mostly). We covered all the basics over & over again. We've practically raped the Block III with the same discussions and arguments.

And keep in mind the delay isn't coming from Pakistan, but China - 'cause that is where the Demo jet(s) are.
at this rate it will disappoint all the armchair avionics engineers and Armchair Marshals. I have seen the demands for number of pylons, weapons, of all sizes and radars and thrust etc that will require C-130 to fly for a JF-17 block 3 to carry all the wish list items.
 
. . . . . .
Latest article on PAC Kamra from March 2021. Some additional details about Block III and AZM
-------------------

Pride of Pakistan - by Alan Warnes, Air International March 2021

In common with production facilities all over the world, Kamra-based Pakistan Aeronautical Complex (PAC) initially suffered from the onset of the COVID-19 pandemic. And not least because it faced a very specific challenge, continuing to look after the entire Pakistan Air Force (PAF) fleet at the same time as building a new aircraft type.

Ensuring that the maintenance repair and overhaul (MRO) facility could carry on with its vital work fell on the shoulders of Air Marshal Syed Noman Ali, who became PAC chairman in early January 2020, just as COVID-19 was gathering pace. The former F-16 Viper pilot told AIR International recently: “Within a few weeks of arriving here I had to come up with solutions to ensure the health and safety of the 15,000 workers, while serving the many needs of the PAF. It was quite a job!”

Maintaining the schedule
Production of the new JF-17 Thunder fighter at the Aircraft Manufacturing Factory (AMF) was initially affected, but after a few weeks, the workforce was housed on the facility enabling personnel to work longer shifts. It took AM Noman and his team about three months to find a new way of working around the coronavirus limitations.

PAC Kamra is the brainchild of the PAF and an extension of the PAF. That’s why it is run by an air marshal, and 40% of the 15,000-strong workforce is military. As well as the AMF, there are three other major facilities within PAC: the Mirage Rebuild Factory (MRF), the Aircraft Rebuild Factory (ARF), and the Avionics Production Factory (APF) with a dedicated research and development department running alongside it.

We asked AM Noman about the PAC’s role in the PAF: “We have four main tasks: the production of the JF-17 Thunder to supplement the fleet and replace obsolete aircraft – whether it be Mirages or Chinese aircraft; life cycle support – all the MROs established here are overhauling aircraft and components then returning them back into service; rectifying components at D Level; and manufacturing harnesses, material components not just limited to aircraft but also for ground-based air defence sensors.”

AM Noman was keen to emphasize the vital role played by the often overlooked design and development section: “It is to assist and supplement, as well as digitalize, design or prototype systems. We determine whether they are feasible, cost effective and whether serial production is worthwhile for the PAF. After prognosis, continuation of the project is discussed, whether we should continue or keep it at prototype [stage]. We are also collaborating in artificial intelligence (AI) with the PAF and its departments, to fuse AI into various projects and to understand what extent we need to capitalize that capability to make it a better product.”

Pakistan’s fifth-gen fighter
At the moment the design and development department is working on a fifth-generation fighter, known as Azm. The project is being conceptualised and preliminary designs are ongoing. “There will come a time when we will review it for its cost effectiveness, and what capabilities can be fused into the project, it will have to be something essential for a next-gen fighter,” he said.

Once Azm is past the preliminary design stage, detailed design will follow before prototyping the initial concept and working towards the final concept. “It will be improved over the three phases with each lasting around two years. In each phase the aircraft could evolve, even its future operating capability (FOC) could see improvements,” he added.

The PAF anticipates that the fifth generation fighter will fly in 2028, but as the PAC chairman explained: “If a partner joins us with new expertise, then that date might alter. We are working in a very focused manner and engaging with international partners to see what they can offer.”

Obviously, the PAC and PAF has learnt a lot from developing and then building the Sino-Pak JF-17 Thunder with the Chinese, and AVIC (Aviation Industry in China) in particular. Fourteen years ago, the PAF hadn’t even started to build fighters. “It’s been a valuable experience, particularly for attracting people here that have diverse [knowledge] within various specialties – design, structures, avionics, integration. We have built over 100 JF-17s that are operationally employed today,” he said.

Thunders rolling
On December 30, 2020, the chairman handed over 14 dual-seat JF-17B Thunders built at the AMF, although he was at pains to acknowledge the contribution of all the factories.

PAC Kamra is responsible for building 58% of the single-seat JF-17s, while AVIC contributes the remaining 42%, but with the extra cockpit in the JF-17B and smaller fuel tank was PAC Kamra now contributing less to the build? “No, we are making them as per the original plan, but at times like the first three months of COVID-19 we had to rely on our Chinese partners to do more. We prefer to meet our deadlines than meeting our percentage output,” he stated.

Training and evaluation
Unlike the single-seat JF-17s, the dualseater has fuel in both wings and in the vertical tail, all of which are made at PAC Kamra under the 58% agreement. “They are not in fuel bladders but carried as integral fuel tanks like on the F-16. Each wing houses 550Ib and the vertical tail, 210lb, which together with the internal fuel load totals of 4,910Ib. Including the three external fuel tanks, the aircraft can carry a 10,000Ib fuel load.”

All 26 JF-17Bs have now been built and handed over to the PAF. The plan is to use them to fulfil training needs with the operational conversion unit (18 Sqn ‘Sharp Shooters’) but also to undertake evaluation and standardisation requirements with operational squadrons. The 12 aircraft handed over in late December 2019 have been delivered to the operational units, while the bulk of the latter will undoubtedly go to the ‘Sharp Shooters’.

“Now, all efforts are being turned towards production of the newer, more capable Block III JF-17s. While final assembly of the dual-seaters was ongoing at the AMF, the SPG [Small Part Manufacturing] had started work on the components of the Block III.” Given that his previous role was JF-17 Chief Project Director (CPD), AM Noman is fully conversant with Block III. “Among the several improvements over the Block I/ II JF-17s is the new KLJ-7A AESA airborne electronically scanned array radar.”

After evaluating three different radars, the CETC (China Electronics Technology Corporation) KLJ-7A was selected in late 2019 and allows for a new generation of weapons and air-to-air missiles. The chairman continued: “A second Block III prototype has been flying in China since August last year, joining the first example delivered in December 2019, that was already undergoing test and evaluation there. By the time we deliver the first serial production Block III from PAC in early 2022 most of the work will be complete. While our flight test pilots and engineers [of the co-located Flight Test Group] are doing most of their work here, they travel to China when the need arises.

“The first Block III is expected to fly from PAC Kamra later this year with the new radar, which we are co-producing at the Avionics Production Factory. This facility has over the past 20 years or so, worked on the Grifo radars [for both the Chengdu F-7P/PG and Dassault Mirage IIIs] as well as the original KLJ-7 in the JF-17 Block I/IIs, so is more than capable of working on the new radar.”

The KLJ-7A will eventually be retrofitted into the JF-17B, so making it a very capable tactical trainer, which several foreign forces are apparently studying. AM Noman explained that although there is a requirement for 50 Block IIIs, only around 30 have initially been contracted, the rest may come later. With a KLJ-7A production line being created at APF, there is every likelihood the earlier Block I/II JF-17s could be upgraded too.

Chinese partners
Other than the AESA radar, the main difference between the Block II and Block III JF-17s, according to the chairman, is a helmetmounted display the PAF is working on with companies in China and Pakistan, three axis fly-by-wire, an enhanced EW management system and a chin-mounted hard point. The PAF has acquired the Aselsan targeting pod, known simply as the Aselpod, with eight ordered so far to support integration, plus a follow-on purchase of 50 made up of three batches.

During the JF-17B roll-out on December 30, 2020, three JF-17 Block IIs destined for the Nigerian Air Force were seen in the line-up. According to AM Noman, these will be delivered in the March 2021 timeframe, while training the pilots is a joint PAC/PAF effort: “We are training around 50 pilots and technicians as and when required by the NAF.” When I asked if the Nigerians were set to order more JF-17s, the chairman said, “We hope so. You should ask them!”

The Aircraft Repair Factory, previously known as the F6 Rebuild Factory, used to overhaul the Shenyang FT-5, FT-6 and Chengdu F-7P in addition to the existing F-7PGs and K-8s – that make up the PAF’s Chinese fleet. Now with the first three types retired, the facility obviously has extra capacity that is enabling it to turn its attention to the JF-17.

By mid-2019, work on the first two aircraft had been completed, and the chairman confirmed that two more have been finished since then. All the fleet will go through ARF eventually, as PAC aims to keep pace with the PAF’s operational requirements.

Super Mushshak
The other aircraft in full production at the AMF, headed up by Air Vice Marshal Shams-Ul-Haq, is the MFI-17 Super Mushshak. Since a glass cockpit was introduced – incorporating Dynon, Garmin and more recently Genesys – the Super Mushshak has benefitted from a significant boost in sales. The chairman stated: “The choice of the digital avionics system is down to the customer – we tell the customer [about] their capabilities and cost, as we do for anything else that they might want in the aircraft. Customers have recently shown particular interest in the Genesys system which we integrated in 2019.”

The first order could come from an in-country customer, although he wouldn’t confirm whether that would be the air force or army. On the export front, Nigeria (ten), Qatar (eight), Azerbaijan (ten) and Turkey (52) have all ordered them, with deliveries completed to the first three customers between 2017-2019. The Turkish Air force ordered two prototypes and 50 serial production aircraft in May 2017, and while it was initially agreed they would be built at Ankara-based Turkish Aerospace, the work is now being carried out at AMF.

“Unfortunately COVID has affected the progress of production but hopefully won’t delay the deliveries over the next three years,” he said. The first two Turkish Super Mushshaks, to be equipped with the Garmin avionics system, have flown and are now painted in their colour scheme with the first batch of aircraft slated for delivery within 2021.

Civil contracts
When asked if the Royal Saudi Air Force was set to upgrade its fleet of 20 Super Mushshaks flying with the King Faisal Air Academy, the Air Marshal would only say that discussions were still ongoing.

With regards to simulation systems, he said the PAF was using the Super Mushshak system to train cadets at the Asghar Khan Academy: “However, the aircraft is very easy to fly so customers are not really interested [in simulators], but it’s an area we would definitely like to [explore].”

As a natural extension of its activities, PAC is now diversifying into overhauling civil airliners. It has formed a partnership with Lithuania’s ASG to overhaul widebody Airbus A330s and Boeing 777s. “We are the first EASA qualified facility in Pakistan for these aircraft and are primarily focused on foreign airlines, because PIA [Pakistan International Airlines] has its own facilities. Our first facility is at Islamabad International Airport and the second one will be at Karachi IAP,” he said.

Undoubtedly, Air Marshal Syed Noman Ali, who has now been the PAC boss for over a year, faces many challenges but the biggest right now “is to the meet the deadlines of our customers during this restricted COVID-19 era.”
 
.
Why only on JF-17b, fuel is carried in wings and vertical stabilizer as mentioned in the article. Will that change in Block 3?
 
.
delivery schedule change again?
we were expecting a squadron raised by the end of year or is it that first squadron will be from China?
whereas PAC will start deliveries in 2022.
the good thing is early model integration with new in-house production AESA radar .
 
.
If PAF had done that, they'd be taking down planes in Indian air space, not Pakistani - Pakistan would have pretty much declared war on India for missing a strike in Balakot. It'd help to keep the context in mind. This would not have helped our case, at all. None of the Indian air crafts crossed into our air space that day, other than Abhi's.

And PAF while could maintain air superiority for a short time, would not have been able to do the same in a stretched war and we'd have seen losses too - had this turned into even in just an air war. And all for what? One strike, that did not hurt anyone in Pakistan?

War is a fairly serious business, our economy took time just to recover from the expenses of long-drawn CAPs that were flown in the aftermath of this incident. We'd have never afforded a war, our economy has been in shambles for a good while now.
Yet western world thrives on the business of war. I do agree that war is bad and we should refrain. However until and unless a bully gets a proper punch in the face he continues to bully.
Latest article on PAC Kamra from March 2021. Some additional details about Block III and AZM
-------------------

Pride of Pakistan - by Alan Warnes, Air International March 2021

In common with production facilities all over the world, Kamra-based Pakistan Aeronautical Complex (PAC) initially suffered from the onset of the COVID-19 pandemic. And not least because it faced a very specific challenge, continuing to look after the entire Pakistan Air Force (PAF) fleet at the same time as building a new aircraft type.

Ensuring that the maintenance repair and overhaul (MRO) facility could carry on with its vital work fell on the shoulders of Air Marshal Syed Noman Ali, who became PAC chairman in early January 2020, just as COVID-19 was gathering pace. The former F-16 Viper pilot told AIR International recently: “Within a few weeks of arriving here I had to come up with solutions to ensure the health and safety of the 15,000 workers, while serving the many needs of the PAF. It was quite a job!”

Maintaining the schedule
Production of the new JF-17 Thunder fighter at the Aircraft Manufacturing Factory (AMF) was initially affected, but after a few weeks, the workforce was housed on the facility enabling personnel to work longer shifts. It took AM Noman and his team about three months to find a new way of working around the coronavirus limitations.

PAC Kamra is the brainchild of the PAF and an extension of the PAF. That’s why it is run by an air marshal, and 40% of the 15,000-strong workforce is military. As well as the AMF, there are three other major facilities within PAC: the Mirage Rebuild Factory (MRF), the Aircraft Rebuild Factory (ARF), and the Avionics Production Factory (APF) with a dedicated research and development department running alongside it.

We asked AM Noman about the PAC’s role in the PAF: “We have four main tasks: the production of the JF-17 Thunder to supplement the fleet and replace obsolete aircraft – whether it be Mirages or Chinese aircraft; life cycle support – all the MROs established here are overhauling aircraft and components then returning them back into service; rectifying components at D Level; and manufacturing harnesses, material components not just limited to aircraft but also for ground-based air defence sensors.”

AM Noman was keen to emphasize the vital role played by the often overlooked design and development section: “It is to assist and supplement, as well as digitalize, design or prototype systems. We determine whether they are feasible, cost effective and whether serial production is worthwhile for the PAF. After prognosis, continuation of the project is discussed, whether we should continue or keep it at prototype [stage]. We are also collaborating in artificial intelligence (AI) with the PAF and its departments, to fuse AI into various projects and to understand what extent we need to capitalize that capability to make it a better product.”

Pakistan’s fifth-gen fighter
At the moment the design and development department is working on a fifth-generation fighter, known as Azm. The project is being conceptualised and preliminary designs are ongoing. “There will come a time when we will review it for its cost effectiveness, and what capabilities can be fused into the project, it will have to be something essential for a next-gen fighter,” he said.

Once Azm is past the preliminary design stage, detailed design will follow before prototyping the initial concept and working towards the final concept. “It will be improved over the three phases with each lasting around two years. In each phase the aircraft could evolve, even its future operating capability (FOC) could see improvements,” he added.

The PAF anticipates that the fifth generation fighter will fly in 2028, but as the PAC chairman explained: “If a partner joins us with new expertise, then that date might alter. We are working in a very focused manner and engaging with international partners to see what they can offer.”

Obviously, the PAC and PAF has learnt a lot from developing and then building the Sino-Pak JF-17 Thunder with the Chinese, and AVIC (Aviation Industry in China) in particular. Fourteen years ago, the PAF hadn’t even started to build fighters. “It’s been a valuable experience, particularly for attracting people here that have diverse [knowledge] within various specialties – design, structures, avionics, integration. We have built over 100 JF-17s that are operationally employed today,” he said.

Thunders rolling
On December 30, 2020, the chairman handed over 14 dual-seat JF-17B Thunders built at the AMF, although he was at pains to acknowledge the contribution of all the factories.

PAC Kamra is responsible for building 58% of the single-seat JF-17s, while AVIC contributes the remaining 42%, but with the extra cockpit in the JF-17B and smaller fuel tank was PAC Kamra now contributing less to the build? “No, we are making them as per the original plan, but at times like the first three months of COVID-19 we had to rely on our Chinese partners to do more. We prefer to meet our deadlines than meeting our percentage output,” he stated.

Training and evaluation
Unlike the single-seat JF-17s, the dualseater has fuel in both wings and in the vertical tail, all of which are made at PAC Kamra under the 58% agreement. “They are not in fuel bladders but carried as integral fuel tanks like on the F-16. Each wing houses 550Ib and the vertical tail, 210lb, which together with the internal fuel load totals of 4,910Ib. Including the three external fuel tanks, the aircraft can carry a 10,000Ib fuel load.”

All 26 JF-17Bs have now been built and handed over to the PAF. The plan is to use them to fulfil training needs with the operational conversion unit (18 Sqn ‘Sharp Shooters’) but also to undertake evaluation and standardisation requirements with operational squadrons. The 12 aircraft handed over in late December 2019 have been delivered to the operational units, while the bulk of the latter will undoubtedly go to the ‘Sharp Shooters’.

“Now, all efforts are being turned towards production of the newer, more capable Block III JF-17s. While final assembly of the dual-seaters was ongoing at the AMF, the SPG [Small Part Manufacturing] had started work on the components of the Block III.” Given that his previous role was JF-17 Chief Project Director (CPD), AM Noman is fully conversant with Block III. “Among the several improvements over the Block I/ II JF-17s is the new KLJ-7A AESA airborne electronically scanned array radar.”

After evaluating three different radars, the CETC (China Electronics Technology Corporation) KLJ-7A was selected in late 2019 and allows for a new generation of weapons and air-to-air missiles. The chairman continued: “A second Block III prototype has been flying in China since August last year, joining the first example delivered in December 2019, that was already undergoing test and evaluation there. By the time we deliver the first serial production Block III from PAC in early 2022 most of the work will be complete. While our flight test pilots and engineers [of the co-located Flight Test Group] are doing most of their work here, they travel to China when the need arises.

“The first Block III is expected to fly from PAC Kamra later this year with the new radar, which we are co-producing at the Avionics Production Factory. This facility has over the past 20 years or so, worked on the Grifo radars [for both the Chengdu F-7P/PG and Dassault Mirage IIIs] as well as the original KLJ-7 in the JF-17 Block I/IIs, so is more than capable of working on the new radar.”

The KLJ-7A will eventually be retrofitted into the JF-17B, so making it a very capable tactical trainer, which several foreign forces are apparently studying. AM Noman explained that although there is a requirement for 50 Block IIIs, only around 30 have initially been contracted, the rest may come later. With a KLJ-7A production line being created at APF, there is every likelihood the earlier Block I/II JF-17s could be upgraded too.

Chinese partners
Other than the AESA radar, the main difference between the Block II and Block III JF-17s, according to the chairman, is a helmetmounted display the PAF is working on with companies in China and Pakistan, three axis fly-by-wire, an enhanced EW management system and a chin-mounted hard point. The PAF has acquired the Aselsan targeting pod, known simply as the Aselpod, with eight ordered so far to support integration, plus a follow-on purchase of 50 made up of three batches.

During the JF-17B roll-out on December 30, 2020, three JF-17 Block IIs destined for the Nigerian Air Force were seen in the line-up. According to AM Noman, these will be delivered in the March 2021 timeframe, while training the pilots is a joint PAC/PAF effort: “We are training around 50 pilots and technicians as and when required by the NAF.” When I asked if the Nigerians were set to order more JF-17s, the chairman said, “We hope so. You should ask them!”

The Aircraft Repair Factory, previously known as the F6 Rebuild Factory, used to overhaul the Shenyang FT-5, FT-6 and Chengdu F-7P in addition to the existing F-7PGs and K-8s – that make up the PAF’s Chinese fleet. Now with the first three types retired, the facility obviously has extra capacity that is enabling it to turn its attention to the JF-17.

By mid-2019, work on the first two aircraft had been completed, and the chairman confirmed that two more have been finished since then. All the fleet will go through ARF eventually, as PAC aims to keep pace with the PAF’s operational requirements.

Super Mushshak
The other aircraft in full production at the AMF, headed up by Air Vice Marshal Shams-Ul-Haq, is the MFI-17 Super Mushshak. Since a glass cockpit was introduced – incorporating Dynon, Garmin and more recently Genesys – the Super Mushshak has benefitted from a significant boost in sales. The chairman stated: “The choice of the digital avionics system is down to the customer – we tell the customer [about] their capabilities and cost, as we do for anything else that they might want in the aircraft. Customers have recently shown particular interest in the Genesys system which we integrated in 2019.”

The first order could come from an in-country customer, although he wouldn’t confirm whether that would be the air force or army. On the export front, Nigeria (ten), Qatar (eight), Azerbaijan (ten) and Turkey (52) have all ordered them, with deliveries completed to the first three customers between 2017-2019. The Turkish Air force ordered two prototypes and 50 serial production aircraft in May 2017, and while it was initially agreed they would be built at Ankara-based Turkish Aerospace, the work is now being carried out at AMF.

“Unfortunately COVID has affected the progress of production but hopefully won’t delay the deliveries over the next three years,” he said. The first two Turkish Super Mushshaks, to be equipped with the Garmin avionics system, have flown and are now painted in their colour scheme with the first batch of aircraft slated for delivery within 2021.

Civil contracts
When asked if the Royal Saudi Air Force was set to upgrade its fleet of 20 Super Mushshaks flying with the King Faisal Air Academy, the Air Marshal would only say that discussions were still ongoing.

With regards to simulation systems, he said the PAF was using the Super Mushshak system to train cadets at the Asghar Khan Academy: “However, the aircraft is very easy to fly so customers are not really interested [in simulators], but it’s an area we would definitely like to [explore].”

As a natural extension of its activities, PAC is now diversifying into overhauling civil airliners. It has formed a partnership with Lithuania’s ASG to overhaul widebody Airbus A330s and Boeing 777s. “We are the first EASA qualified facility in Pakistan for these aircraft and are primarily focused on foreign airlines, because PIA [Pakistan International Airlines] has its own facilities. Our first facility is at Islamabad International Airport and the second one will be at Karachi IAP,” he said.

Undoubtedly, Air Marshal Syed Noman Ali, who has now been the PAC boss for over a year, faces many challenges but the biggest right now “is to the meet the deadlines of our customers during this restricted COVID-19 era.”
Really good read. 2021 I bet the delivery of the 1st block three will be like the dual seat jf17. A whole squadron operational.
Excellent to hear that the ASEA radars will be produced in Pakistan and that block 1 and block 2 will be upgraded to block 3 standards. 150 block 3 jf17 will be again in the *** for our southern adversaries.
 
.
Pakistan azm project will hose only most essential ,reliable and trusted technologies in it.
Wouldn't put some fancy gadget to look cool.it will be the most basic 5th gen plane any country could get.Than with passing of time we see it grooming just like Jeff's.
Yet western world thrives on the business of war. I do agree that war is bad and we should refrain. However until and unless a bully gets a proper punch in the face he continues to bully.

Really good read. 2021 I bet the delivery of the 1st block three will be like the dual seat jf17. A whole squadron operational.
Excellent to hear that the ASEA radars will be produced in Pakistan and that block 1 and block 2 will be upgraded to block 3 standards. 150 block 3 jf17 will be again in the *** for our southern adversaries.
Once @messiach told us that Jeff dualseats are essentially block 3 jets and eventually single seat block 3 will have tail like Jeff dualseats.
 
.
Pakistan azm project will hose only most essential ,reliable and trusted technologies in it.
Wouldn't put some fancy gadget to look cool.it will be the most basic 5th gen plane any country could get.Than with passing of time we see it grooming just like Jeff's.

Once @messiach told us that Jeff dualseats are essentially block 3 jets and eventually single seat block 3 will have tail like Jeff dualseats.
Where did you get it will be the most basic jet. Why do people sell themselves so short.
Cant cant cannot impossible .
 
.
Pakistan azm project will hose only most essential ,reliable and trusted technologies in it.
Wouldn't put some fancy gadget to look cool.it will be the most basic 5th gen plane any country could get.Than with passing of time we see it grooming just like Jeff's.

Once @messiach told us that Jeff dualseats are essentially block 3 jets and eventually single seat block 3 will have tail like Jeff dualseats.

There is no Air Craft with the name of Jeff.... let's not spread wrong information.
 
. .
Back
Top Bottom