What's new

ISRO PSLV-C43 / HysIS Mission: November 29, 2018

. . . .
Screenshot_2018-11-29-09-58-19.jpeg
 
. . . .
Heat Shield off. Stage 3 completed. Vehicle coasting.

PSLV can coast between Stage 3 and 4. Stage 4 normal.
Screenshot_2018-11-29-10-07-03.jpeg


HysIS separated:
Screenshot_2018-11-29-10-18-32.jpeg


There'll be two restarts of PS4 before the separation of other satellites. It'll take more than a hour from now.
 
. .
PS4 first restart and cut off over. Second restart is close.
Screenshot_2018-11-29-11-43-09.jpeg


PS4 second restart and cut off over. Customer satellites injection commence. Injection over in a few minutes.

Congrats. Mission accomplished.
 
. .
Use Burnol Looser.

Successful Launch !!!!

So sats have established coms. I don't think so. No com's till now.

The launch would have been successful, Russian rocket engines are good.
 
. . .
Back
Top Bottom