What's new

ISRO PSLV-C43 / HysIS Mission: November 29, 2018

KapitaanAli

SENIOR MEMBER
Joined
Nov 22, 2017
Messages
2,442
Reaction score
-3
Country
India
Location
India
PSLV-C43 / HysIS Mission

The Polar Satellite Launch Vehicle (PSLV), in its 45th flight PSLV-C43, will launch HysIS and 30 co-passenger satellites from the First Launch Pad (FLP) of Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota on 29th November 2018.

PSLV is a four stage launch vehicle with alternating solid and liquid stages. PSLV-C43 is the Core Alone version of PSLV which is the lightest version of PSLV.

HysIS is an earth observation satellite developed by ISRO. It is the primary satellite of the PSLV-C43 mission. The mass of the spacecraft is about 380 kg. The satellite will be placed in 636 km polar sun synchronous orbit with an inclination of 97.957 deg. The mission life of the satellite is 5 years. The primary goal of HysIS is to study the earth’s surface in visible, near infrared and shortwave infrared regions of the electromagnetic spectrum.

The co-passengers of HysIS include 1 Micro and 29 Nano satellites from 8 different countries. All these satellites will be placed in a 504 km orbit by PSLV-C43. These satellites have been commercially contracted for launch through Antrix Corporation Limited, the commercial arm of ISRO.

IMG_20181127_041329.jpg

IMG_20181127_041637.jpg

IMG_20181127_041920.jpg
 
Last edited:
. . .
Nov 27, 2018
The countdown for the launch of PSLV-C43 / HysIS Mission from Satish Dhawan Space Centre SHAR, Sriharikota is tentatively scheduled at 0557 Hrs IST on November 28, 2018. The launch is tentatively scheduled at 0957 Hrs IST on November 29, 2018.
 
. . .
Nov 27, 2018
PSLV-C43 lift off time is rescheduled to 09.58 Hrs IST on 29th November, 2018. Countdown will commence from 05.58 Hrs IST on 28th November, 2018.
 
. .
Kudos to ISRO. They should also release the amount of money/profit they earned from launching foreign satellites. This will help silencing those who keep questioning the economics of our space mission
 
. .
Nov 28, 2018
The countdown for the launch of PSLV-C43/HysIS mission started today at 05:58 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. The launch is scheduled at 09:58 Hrs IST on 29th November 2018.

Nov 28, 2018
PSLV-C43 / HysIS Mission: Fuel filling of PS4 stage (fourth stage) completed.
 
.
Nov 28, 2018
PSLV-C43/HysIS Mission: Propellant filling for the second stage(PS2) of PSLV-C43 commenced.

Nov 28, 2018
PSLV-C43/HysIS Mission: Filling of oxidizer (N204) for the second stage (PS2) of PSLV-C43 completed.
 
.
Nov 28, 2018
PSLV-C43/HysIS Mission: Propellant filling for the second stage(PS2) of PSLV-C43 completed.
 
. . .
Back
Top Bottom