Is LCA Programme finally dead?

. .
Only 6 jets produced so far, contract for 83 MK1A still not signed (was supposed to be this year, now been waiting 3 years for contract signature). IAF waiting for it to die?



India should immediately stop the tejas program and restart their efforts for a mid sized stealth aircraft from all the experience from the tejas!

HAL should be in the lead with DRDO contacting members from the Pakistani defence forum for their detailed advice on the requirements. This process should be meticulous, takeing at the very least 20+ years to ensure nothing is missed with public debate on the PDF.

my initial feeling is that the jet should have 10 tea cup holders incase shot down and saving the IAF from the indignity of accepting that the tea in Pakistan is fantastic , a functioning toilet as per Modi ji’s initiative to ensure all Indians have access to a toilet and have a place to review dance moves of the squadron in preparation of the IAF inter squadron dance completion.

Then off course the requirements locked and prototype development should take another 20-30 years.

finally after FOC and a run of 4 super superior aircraft are built and the acquisition of foreign 2nd tier aircraft at extremely high costs the right step of abandoning this flawed made in India with mostly foreign parts project and start working on a super stealthy AI based pilot less heavy fighter aircraft should start with the above mentioned process.

by removing the incompetent IAF pilot the plane will be at-least 50% more effective.

this should continue till finally the Indian people are given true happiness and freedom by their one true Pakistani Muslim rulers inshallah

k
 
.
The latest news is that military is dragging its feet placing the follow on order which has meant that current production is down to a crawl
 
. . .
India should immediately stop the tejas program and restart their efforts for a mid sized stealth aircraft from all the experience from the tejas!

HAL should be in the lead with DRDO contacting members from the Pakistani defence forum for their detailed advice on the requirements. This process should be meticulous, takeing at the very least 20+ years to ensure nothing is missed with public debate on the PDF.

my initial feeling is that the jet should have 10 tea cup holders incase shot down and saving the IAF from the indignity of accepting that the tea in Pakistan is fantastic , a functioning toilet as per Modi ji’s initiative to ensure all Indians have access to a toilet and have a place to review dance moves of the squadron in preparation of the IAF inter squadron dance completion.

Then off course the requirements locked and prototype development should take another 20-30 years.

finally after FOC and a run of 4 super superior aircraft are built and the acquisition of foreign 2nd tier aircraft at extremely high costs the right step of abandoning this flawed made in India with mostly foreign parts project and start working on a super stealthy AI based pilot less heavy fighter aircraft should start with the above mentioned process.

by removing the incompetent IAF pilot the plane will be at-least 50% more effective.

this should continue till finally the Indian people are given true happiness and freedom by their one true Pakistani Muslim rulers inshallah

k
 
. .
correct. With coronavirus shutting down almost all production, the question is 'why is more LCA not produced'
 
.
correct. With coronavirus shutting down almost all production, the question is 'why is more LCA not produced'

but Pakistan produced 20+ JF-17s of A and Dual seater B variant in the same time frame in 2020 with COVID-19 , Pakistan also produced 40 alkhalid 1 tanks and two corvettes..........

why is India so bad at any manufacturing ?

K
 
.
all there home made programmes are a failure

simply continued to entertain there illiterates,

then run to France to buy there Raphael & Russian tanks
 
.
but Pakistan produced 20+ JF-17s of A and Dual seater B variant in the same time frame in 2020 with COVID-19 , Pakistan also produced 40 alkhalid 1 tanks and two corvettes..........

why is India so bad at any manufacturing ?

K

you shouldn't probably field those in battle....for now at least....
 
. .
but Pakistan produced 20+ JF-17s of A and Dual seater B variant in the same time frame in 2020 with COVID-19 , Pakistan also produced 40 alkhalid 1 tanks and two corvettes..........

why is India so bad at any manufacturing ?

K

With half the frame, electronics and missiles coming over from China, integration is not really an hard job.
But yes, LCA programme this year have been an disappointment. Most of the modules are manufactured by private sub contractor across the breadth of the country. Without them , HAL can't integrate anything sadly.
 
.
With half the frame, electronics and missiles coming over from China, integration is not really an hard job.
But yes, LCA programme this year have been an disappointment. Most of the modules are manufactured by private sub contractor across the breadth of the country. Without them , HAL can't integrate anything sadly.

with corona restrictions neither can private contractors deliver nor can HAL integrate. This entire thread is useless. Even ISRO has had to delay launches. This is a pointless thread
 
.