INS Kolkata as per all media sources is to be commissioned tomorrow (March 27). Can you people keep tab of the development? Thanks.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Without LRSAM???INS Kolkata as per all media sources is to be commissioned tomorrow (March 27). Can you people keep tab of the development? Thanks.
Dude why dont you give us some more hint so that we can search the whole damn internet more effectively??INS Kolkata as per all media sources is to be commissioned tomorrow (March 27). Can you people keep tab of the development? Thanks.
Without LRSAM???
There is no rule that all systems need to be in place before commissioning. The ship can be inducted/commissioned
after the sea trials are over and the subsystems can come later on, once the ship is in IN fleet.
Infact most of the Royal Navy's Daring-class DDGs didn't have their Harpoons in place when they were
commissioned.
That said, I sincerely don't think the ship will be commissioned tomorrow. Only by the middle of this year.
LRSAM firings from Kolkata should begin by next year.
Type 45 ships were never meant to have Harpoon. It was fitted for but not with.
Some of them do. All of them will get it also, but in due time.
The T-45s inducted and operationlised without even a CIWS onboard.The ship can be inducted/commissioned
after the sea trials are over and the subsystems can come later on, once the ship is in IN fleet.
Infact most of the Royal Navy's Daring-class DDGs didn't have their Harpoons in place when they were
commissioned.
The T-45s inducted and operationlised without even a CIWS onboard.
Look it up, it's common knowledge. The T-45s were "wired for" Phalanx but it was no installed.Source?
It can be, CIWS systems are modular in nature, which can be programmed independently on simpler systems and can also seamlessly integrate with the ship's ICS.The T-45s inducted and operationlised without even a CIWS onboard.
Indeed but the omission of the CIWS was due to cost saving members with the UK MoD.It can be, CIWS systems are modular in nature, which can be programmed independently on simpler systems and can also seamlessly integrate with the ship's ICS.