What's new

Indonesia Defense Industry

Falcon Star Program

1699517372163.jpeg

1699517485137.jpeg

1699518125526.jpeg
 
Last edited:
.
University students visited Pindad

1699525560605.jpeg
 
Last edited:
.
Last edited:
. .
New NC212i aircraft with a new 5 blade propeller for the Indonesian Air Force during test flight at PTDI facility. Credit to Fahmi Imadudin.

1699777951953.jpeg


Recent photo in N219 Assembly Hangar. Canadian Business delegation visited PTDI.

1699778216626.jpeg
 
Last edited:
. . .

Collaborating with Ministry of Defense, PTDI Signs Contract for Modernization of C130 Aircraft Worth Rp2.1 T​

ECONOMICS
Suparjo Forecast
Thursday, April 21, 2022 12:30 WIB

IDXChannel - PT Dirgantara Indonesia (Persero) or PTDI and the Ministry of Defense agreed on a cooperation contract for the modernization of 12 units of C130 aircraft . The funding commitment reached USD149 million or equivalent to Rp2.1 trillion.

Director of Dirgantara Indonesia, Gita Amperiawan said this cooperation agreement after President Joko Widodo (Jokowi) inaugurated the Defense BUMN Holding or Defend ID .


PTDI MRO facilities

1699783330306.png

1699784391053.png


Indonesian Aerospace subsidiary in turbine MRO

1699785302332.jpeg


PT Nusantara Turbin dan Propulsi (NTP) is a trusted excellence center leading in South East Asia in the field of engineering, maintenance, repair and overhaul of gas turbines and rotating equipment. Since the early establishment by the name of Universal Maintenance Center (UMC) a division of PT IPTN, NTP has been projected as a business of engineering, maintenance, repair and overhaul in the field of turbines and rotating equipment.

 
Last edited:
.
Indonesian Aerospace will modernize the production facility for CN 235 and N 219 program inshaAllah which also will increase the production rate of these programs. If all of the modernization program is completed which is expected to happen in middle of 2024, then CN 235 production rate will be 8 planes per year (from current 4 planes per year) and N 219 production rate will be 10 planes per year (from current 2 planes per year).

1699783520553.png

1699783556594.png


I see for CN 235 production modernization program, this facility can also be used for future N245 program which is a civilian version of CN 235. This type of plane still has some demand that could utilize Indonesian aerospace CN235 production facilities.

With the increased CN235 production facility, then N245 program development cost will be smaller as the CN 235 production facility increase will double CN 235 production rate that has big commonality with N245 plane.

N245 plane model

1699790899736.jpeg
 
Last edited:
. .
Engine Test Cell Facilities in PT Nusantara Turbine (Indonesian Aerospace subsidiary company)

1699785451609.png


Engine test cell in GMF Aero Asia

1699785562430.png

 
. . . . .
Back
Top Bottom