What's new

India’s Tejas Era Begins

shree835

BANNED
Joined
Jun 26, 2010
Messages
3,005
Reaction score
-19
Country
India
Location
India
TEJAS-Era.jpg

On display here at Aero India 2015, you couldn’t have missed the static display of the LCA Tejas, India’s light fighter. Unlike the LCA that enthralled Prime Minister Narendra Modi at the inaugural flying display yesterday, the Tejas on ground is the first production series fighter in a project that has spanned three decades, crossed thousands of hurdles, and finally produced a sturdy light-weight fighter plane. The specimen you see on the ground was recently handed over to the Indian Air Force, formally beginning the type’s life with its primary customer. But work is far from over. Indeed, in many ways, the real work starts now.

Over the next nine-ten months, the baseline version of the Tejas will gallop through a substantial list of pending test points it is mandatorily required to cross before it obtains final operational clearance, a milestone that declares it officially available for real operations. While there have been whispers that slow progress could push the final date for clearance to mid-2016, the Aeronautical Development Agency (ADA) is firm in its view that they want to wrap things up by 2015, so series production at HAL can kick off in earnest and energies can be rightly focused on the Tejas Mk.2, a modified variant that will fly on the powerful F414- GE-INS6 engine as opposed to the F404 that the Mk.1 flies on.

The dash to the FOC deadline began in December 2013, and it’s been a tough journey. During the next few critical months, the Tejas will be made to demonstrate aerial refuelling from an IAF Il-78M tanker, demonstrate the use of the Gryazev-Shipunov GSh-23 gun in flight, demonstrate a high-speed low drag bomb fitted with a retarding tail assembly, demonstrate drop tanks for the supersonic regime, integrate and fire Israeli Derby and Python beyond visual range missiles. The FOC tests also include enhancing angle of attack and overall flight envelope.

In 2013, ahead of the final test campaign, the LCA Tejas had demonstrated its operational prowess at the Iron Fist fire power demonstration over the Thar Desert, in an effort to see the platform perform alongside other aircraft in IAF inventory. The LCA Tejas fired an R-73 missile and dropped precision guided bombs during the demonstration. Said Air Commodore K.A. Muthana of the National Flight Test Centre (NFTC) on its performance, “The Indian Light Combat aircraft (LCA) was conceived in the early eighties and is now on the threshold of entering squadron service. The legacy of this aircrafts’ development has resulted in true challenges to deployment being faced at a very late stage. There are even insinuations that this aircraft has been more of a success to the scientists in lab coats than to the war fighter in flight suits. True; this fine aircraft has been hostage to a series of systemic shortcomings. There are significant lessons here for the Indian aviation industry. It is vitally important that these lessons are imbibed in order to move forward coherently in building a strong aeronautics industry in this country. Tejas is a wonderful flying machine. It deserved to be in squadron service years ago. Remedial action on many of the shortcomings commented upon, if implemented even now, will favorably impact timelines for IOC and FOC of the Tejas Mk 1 aircraft. Favorable impact on Tejas Mk 2 and other future programs will be enormous.”

And that’s where Aero India 2015 comes in. At the show this year, two things happen for the Tejas that should be of interest to the world. One, it has finally been unveiled as a ready, production series airplane. Customers looking at the Tejas as a light frontline air defence platform or a high-performance lead in jet trainer will now be able to strike up real conversations on possible export deals. With the IAF ordering only 40 odd jets of the Mk.1 baseline version, the field is open for foreign customers to make use HAL’s production line and strength. Second, with work on the Mk.1 largely done, the opportunities for cooperation on the Mk.2 with global firms is now an open field. The Aeronautical Development Agency (ADA) has had a busy year, with marked progress on the LCA Navy too. But, as Air Commodore Muthana notes, the lessons of the Mk.1 are critical to the success of the more important Mk.2, of which the IAF wants 80 odd units. It is the Mk.2 that will be the true Tejas.

India s Tejas Era Begins
- SP's MAI
 
.
TEJAS-Era.jpg

On display here at Aero India 2015, you couldn’t have missed the static display of the LCA Tejas, India’s light fighter. Unlike the LCA that enthralled Prime Minister Narendra Modi at the inaugural flying display yesterday, the Tejas on ground is the first production series fighter in a project that has spanned three decades, crossed thousands of hurdles, and finally produced a sturdy light-weight fighter plane. The specimen you see on the ground was recently handed over to the Indian Air Force, formally beginning the type’s life with its primary customer. But work is far from over. Indeed, in many ways, the real work starts now.

Over the next nine-ten months, the baseline version of the Tejas will gallop through a substantial list of pending test points it is mandatorily required to cross before it obtains final operational clearance, a milestone that declares it officially available for real operations. While there have been whispers that slow progress could push the final date for clearance to mid-2016, the Aeronautical Development Agency (ADA) is firm in its view that they want to wrap things up by 2015, so series production at HAL can kick off in earnest and energies can be rightly focused on the Tejas Mk.2, a modified variant that will fly on the powerful F414- GE-INS6 engine as opposed to the F404 that the Mk.1 flies on.

The dash to the FOC deadline began in December 2013, and it’s been a tough journey. During the next few critical months, the Tejas will be made to demonstrate aerial refuelling from an IAF Il-78M tanker, demonstrate the use of the Gryazev-Shipunov GSh-23 gun in flight, demonstrate a high-speed low drag bomb fitted with a retarding tail assembly, demonstrate drop tanks for the supersonic regime, integrate and fire Israeli Derby and Python beyond visual range missiles. The FOC tests also include enhancing angle of attack and overall flight envelope.

In 2013, ahead of the final test campaign, the LCA Tejas had demonstrated its operational prowess at the Iron Fist fire power demonstration over the Thar Desert, in an effort to see the platform perform alongside other aircraft in IAF inventory. The LCA Tejas fired an R-73 missile and dropped precision guided bombs during the demonstration. Said Air Commodore K.A. Muthana of the National Flight Test Centre (NFTC) on its performance, “The Indian Light Combat aircraft (LCA) was conceived in the early eighties and is now on the threshold of entering squadron service. The legacy of this aircrafts’ development has resulted in true challenges to deployment being faced at a very late stage. There are even insinuations that this aircraft has been more of a success to the scientists in lab coats than to the war fighter in flight suits. True; this fine aircraft has been hostage to a series of systemic shortcomings. There are significant lessons here for the Indian aviation industry. It is vitally important that these lessons are imbibed in order to move forward coherently in building a strong aeronautics industry in this country. Tejas is a wonderful flying machine. It deserved to be in squadron service years ago. Remedial action on many of the shortcomings commented upon, if implemented even now, will favorably impact timelines for IOC and FOC of the Tejas Mk 1 aircraft. Favorable impact on Tejas Mk 2 and other future programs will be enormous.”

And that’s where Aero India 2015 comes in. At the show this year, two things happen for the Tejas that should be of interest to the world. One, it has finally been unveiled as a ready, production series airplane. Customers looking at the Tejas as a light frontline air defence platform or a high-performance lead in jet trainer will now be able to strike up real conversations on possible export deals. With the IAF ordering only 40 odd jets of the Mk.1 baseline version, the field is open for foreign customers to make use HAL’s production line and strength. Second, with work on the Mk.1 largely done, the opportunities for cooperation on the Mk.2 with global firms is now an open field. The Aeronautical Development Agency (ADA) has had a busy year, with marked progress on the LCA Navy too. But, as Air Commodore Muthana notes, the lessons of the Mk.1 are critical to the success of the more important Mk.2, of which the IAF wants 80 odd units. It is the Mk.2 that will be the true Tejas.

India s Tejas Era Begins
- SP's MAI
Era of Tejas :big_boss::rofl:
 
.
why go for Rafael if the era of Tejas has started ??????????????????
 
. . .
Tejas and Rafale are different classes of aircraft.!!
Tejas is a light combat aircraft whose main job would be to replace the MiG-21 interceptor fighters and this aircraft has also way better precision strike capability than the MiG-21s- thanks to it's varied range of A2G munitions
Whereas the Rafales are truly omnirole fighters with excellent Air-to-Air capability which would compliment the MKIs and MiG-29s and enhance IAF's air dominance capabilities along with that it will replace the MiG-27s and Jags in the A2G and precision striking role.!! Along with the Mirages the Rafale will form the Medium class multirole fighter jets of the IAF.!! :)

@Pomegranate
 
Last edited:
. . .
The Aeronautical Development Agency (ADA) has had a busy year, with marked progress on the LCA Navy too. But, as Air Commodore Muthana notes, the lessons of the Mk.1 are critical to the success of the more important Mk.2, of which the IAF wants 80 odd units. It is the Mk.2 that will be the true Tejas.


Good news indeed. :coffee:

 
.
Neat and Advanced fighter jet in its class . Will have lots of foreign buyers in the future . May be after 2018 ...
 
. .
A very delayed era, but good things take time. It would be prudent to start looking at export potential as well.

It took very very long time........ But everything is a learning in this project....... and good thing is that we are learning a lot..... What is more important is how are we going to use this learning in the future projects....
 
.
It took very very long time........ But everything is a learning in this project....... and good thing is that we are learning a lot..... What is more important is how are we going to use this learning in the future projects....

And that is the part that is worrisome, when we see ADA / DRDO doing basically the same mistakes again. They are looking far too much to the US again for support (just read that there were issues wrt Rustom 2 because parts that were planned to be sourced from the US didn't got export approval). They again develop an Air Force fighter first, although it's evident, that the Navy needs a stealth fighter. They are not includinding the forces into design and development stages, other than providing basic requirements. They again have no industrial, technoligical or knowledge base to start such a development and they once again promissing timelines they won't be able to hold.

We truly gained a lot from the LCA program, but fail to implement the knowledge into improvements!
 
Last edited:
.
And that is the part that is worrisome, when we see ADA / DRDO doing basically the same mistakes again. They are looking far too much to the US again for support (just read that there were issues wrt Rustom 2 because parts that were planned to be sourced from the US didn't got export approval). They again develop an Air Force fighter first, although it's evident, that the Navy needs a stealth fighter. They are not includinding the forces in to design and development stages, other than providing basic requirements. They again have no industrial, technoligical or knowledge base to start such a development and they once again promissing timelines they won't be able to hold.

We truly gained a lot from the LCA program, but fail to implement the knowledge into improvements!


Your analysis will get a lot of criticism from your fellow Indians. They only want to listen to how far has India progressed, not how much it has to go.

It took very very long time........ But everything is a learning in this project....... and good thing is that we are learning a lot..... What is more important is how are we going to use this learning in the future projects....

In your realistic opinion, when do you think LCA MKII and AMCA would be ready. Is India pursuing the right strategy of getting MMRCA now or should
India build more MKI. Save the money for R&D. Personally, I think India has too many platforms.
 
.
not how much it has to go.

There is no denying that India still has a long way to go, just as I don't deny the progress we already had in several fields, but we can't just be happy with a little achievment and than automatically dream about the next big thing, but need to aim on constant progress and a learning curve, since only that will will make dreams come true!
 
.
Back
Top Bottom