Hingol Dam Project
Location
On Hingol River at a distance about 19 km on North of Makran Coastal Highway and about 248 km from North-West of Karachi in Lasbela District of Balochistan.
Salient Features
Height of Dam...
174 ft
Scope of Work
Detailed Engineering Design
Donor Agency....................... Govt. of Pakistan
Commencement Date -
Completion Date -
Financial Status (Rs. Million) Local Foreign...... Total
Original PC-II Cost ..............272.824 - ...........272.824
Status:-
Location
On Hingol River at a distance about 19 km on North of Makran Coastal Highway and about 248 km from North-West of Karachi in Lasbela District of Balochistan.
Salient Features
- Type of Dam
Height of Dam...
174 ft
- Gross Storage...
- Live Storage...
CCA ...
Power Generation
Scope of Work
Detailed Engineering Design
Donor Agency....................... Govt. of Pakistan
Commencement Date -
Completion Date -
Financial Status (Rs. Million) Local Foreign...... Total
Original PC-II Cost ..............272.824 - ...........272.824
Status:-
- A feasibility study completed by M/s NESPAK in 1992-93.
- Detailed Engineering Design and Tender documents of Hingol Dam Project with Dam Site at Aghor, 1 km u/s of Makran Coastal Highway Bridge completed in 2009.
- Hindu Community raised objections due to the submergence of their Holy Places. Hence, the site of the proposed dam was shifted 16 km upstream of Aghor Site.
- A meeting was held on 01.09.2016 between WAPDA and Project Consultants wherein it was decided that:
- Project Consultants will revise the scope of work and complete the Detailed Engineering Design of the Project as per the Consultancy agreement.
- WAPDA will arrange the financing for the Project and clear the pending liabilities of the Consultants after verification of their invoices and approval of PC-II Proforma.
- Consultants will take up this additional assignment after the clearance of their pending liabilities.
- On directions of MoWR, WAPDA requested Govt. of Balochistan on 28.12.2017 to accord priority to the project.
- On the order of Balochistan High Court, Govt. of Balochistan issued NOC/Project Priority in favor of WAPDA to carry out Detailed Engineering Design on 08.05.2019.
- Accordingly, MoWR issued Project authorization on 13.05.2019 and directed to submit updated PC-II.
- PC-II Proforma for Detailed Engineering Design, Preparation of Tender Documents & PC-I amounting to Rs. 421.372 Million submitted to MoWR on 28.10.2019.
- FFC, MoWR cleared the PC-II & submitted for the approval of DDWP on 07.01.2020.