What's new

F-7 & FT-7

goeie dag jeroen, ek het hierdie foto ook gesien, maar ek weet nie.
You try to answer in Dutch :-)
Found another picture, but now on the flightline.
502 (2).jpg
 
. .
No. 37 (Combat Training) Wing deployed in training base, PAF Base M.M. Alam , has 18 and 20 Squadrons, both are OCU and operate FT-7 in Mianwali. Any contact there could potentially solve the query.
 
.
No. 37 (Combat Training) Wing deployed in training base, PAF Base M.M. Alam , has 18 and 20 Squadrons, both are OCU and operate FT-7 in Mianwali. Any contact there could potentially solve the query.

Hi,

But what is the best way to contact them?

Rgd,
Jeroen
 
.
The original ft7 were shorter by 600 mm to ft7 later inducted in numbers. I think they were returned back China till reinduction later
 
.
PAF Base M.M. Alam , has 18 and 20 Squadrons, both are OCU and operate FT-7 in Mianwali
20 has FT 7 PG and F 7 PG and 18 has FT 7P . 20 sqn regularly participates in ADA duties . I remember when they shifted from rafiqui to MM Alam they did couple of hot scrambles.

But what is the best way to contact them?
Directorate of Media affairs PAF
 
.
No. 37 (Combat Training) Wing deployed in training base, PAF Base M.M. Alam , has 18 and 20 Squadrons, both are OCU and operate FT-7 in Mianwali. Any contact there could potentially solve the query.

The new temporary sharp shooter sqn also there with all f-7p and ft7ps with remaining life / hours , its LIFT role past 1 fcu for now

Eventually f7ps will be gone from 18 as well as per sep 7 show there are now 7 jf sqn and 18 may be already in process of converting at kamra ??? Looks like 14 moved out taking no 19 spot
 
.
4449731.jpg


4803913.jpg


ft-7p_pakaf_90-607.jpg


FT-7P.jpg


the initial posted FT-7 in desert smart camouflage pain job were 600 MM smaller than the version later acquired from china. i think Pakistan is currently operating close to ~15-20 FT-7 of various timeline in sharp shooter. sqd. of that newest one are those 9 acquired after f-7pg induction and then 5 used examples transferred from china beginning of 2011/2012.
 
.
Per paf history book ft-7 life was extended by pac past 26/2800 hour OEM life (do not remember exact) without OEM approval based on pac experience with ft-5, f-6s and other aircraft OEM was asked but were not willing or ...

Assuming another 2-300 hours added per airframe and total 20 or so

300x20 = 6k hours would cover a couple of years

Paf did the same for f-6s last two Sqn
 
Last edited:
.
The new temporary sharp shooter sqn also there with all f-7p and ft7ps with remaining life / hours , its LIFT role past 1 fcu for now

Eventually f7ps will be gone from 18 as well as per sep 7 show there are now 7 jf sqn and 18 may be already in process of converting at kamra ??? Looks like 14 moved out taking no 19 spot
18 is still very much operational in Mianwali...why are u so eager for their conversion..i hv told you before that as long as F7 is operational,18 sqn is not going to re-equip.

Also SHOOTER sqn is separate from Sharp Shooters.
 
. .
I always liked the F-7PG for some reason :)
 
. .

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom