What's new

Contract for $750 mln 100,000 bpd oil refinery likely next month: Ministry

shah1398

SENIOR MEMBER
Joined
Apr 30, 2015
Messages
3,855
Reaction score
6
Country
Pakistan
Location
Pakistan
Contract for $750 mln 100,000 bpd oil refinery likely next month: Ministry
November 28, 2016
147
Share on Facebook

Tweet on Twitter

khalifa-oil-refinery.jpg

Contract for $750 mln 100,000 bpd oil refinery likely next month: Ministry
ISLAMABAD, Nov 28 (APP): A private sector petroleum company Trans-Asia is going to set up a refinery having capacity to develop 100,000 barrels per day (bpd) followed by the Byco that established the country’s largest production unit in Balochistan in June last year.

“The Engineering, Procurement and Construction (EPC) contract is expected to be awarded by December 2016, subject to the Project Financial Close. After award of the EPC contract the construction will take approximately 30 months,” official sources in the Ministry of Petroleum and Natural Resources told APP.

Trans-Asia Refinery Limited (TRL), they said, in collaboration with Dubai was undertaking a project of relocating an oil refinery from Italy to Karachi with the capacity to refine 100,000 bpd (4.5 Million tons per annum) of crude oil.

“As per project sponsors, the estimated capital cost of the project is US$ 750 million,” they said adding that setting up of back-to-back oil refineries speak about the present government’s seriousness towards resolving the energy crisis and achieving self-sufficiency in this sector.

Local as well as foreign investors, they said, were reposing full confidence in prudent and business-friendly economic policies introduced by the present government and making huge investments in the energy sector.

On June 12, 2015, the sources said, the Byco Petroleum Company had set up the country’s largest oil refinery complex at Hub, Balochistan, with the capacity of refining 120,000 barrels crude oil per day. “The facility will increase energy security and reduce dependency on others.”

They said the country’s oil refining capacity had dropped from the 50 per cent mark, which was not considered a good sign for national economy.

Presently, the sources said, around six oil refineries were operating in the country and they had full capacity to refine the product as per needs of the country, they said adding that a lot of work was still had to be done in exploration sector to achieve autarky.

Answering a question, the sources said to scale up the production by the local refineries, Pak Arab Refinery Limited (PARCO) was implementing the Khalifa Coastal Refinery project at Khalifa Point, near Hub, Balochistan.

The refinery, having capacity of 250-300,000 bpd (11-14 million tons per annum), is being set up with an estimated cost of $ 4.5 billion. The implementation timelines are 60 months.

While, Attock Refinery Limited (ARL) is working to enhance its capacity from existing 43,000 bpd to 53,000 bpd.

https://www.app.com.pk/contract-for-750-mln-100000-bpd-oil-refinery-likely-next-month-ministry/
 
. .

Latest posts

Country Latest Posts

Back
Top Bottom