Major Shaitan Singh
SENIOR MEMBER
- Joined
- Dec 7, 2010
- Messages
- 3,550
- Reaction score
- 43
- Country
- Location
Short-haul military transport aircraft. Development of the aircraft being the SE "Antonov" (Kiev, Ukraine, General Designer - Dmitry Semenovich Kiva) based on passenger aircraft An-158.Development started in 2010 (the order to start the development was signed February 5, 2010, officially announced the press service of the State Enterprise "Antonov" of 23.02.2010).The aircraft is planned to replace the military transport aircraft An-12 - according to the forecasts of experts GP "Antonov" aircraft potential market could reach about 800 copies for 10-12 years. The maximum production capacity of the State Enterprise "Antonov" is estimated at 12 aircraft per year (source).
In 2010 it was planned to expand the assembly of AN-178 including Russia (equity participation in the project of 53%), but the decision on the participation of United Aircraft Corporation (UAC) in the project and has not been taken. November 29, 2010 reported on the development of conceptual design of the aircraft. The test was scheduled to start in 2013.The assembly of the fuselage of the first prototype completed in July 2014 completion of the assembly of the aircraft was planned for the end of 2014. In November 2014 began ground testing aircraft. When assembling №001 aircraft used components produced in Russia. Roll-out of the plane of the plant №001 held on 16 April 2015. In November 2014, began assembling №002 aircraft and as of April 22, 2015 has made its fuselage. The first flight of the An-178 made №001 May 7, 2015 at the airport SE "Antonov" "Gostomel".The flight duration is 1 hour crew performed test "Antonov" including: a test pilot 1st Class Andrew Thank you - crew commander, test pilot 1st Class Hero of Ukraine Sergey Troshin - co-pilot, a leading test engineer Nikolai Sidorenko (source).
The first flight of the An-178, the airport "Gostomel" 07/05/2015 (photo - Oleg Belyakov,http://www.airliners.net/).
Model AN-178 at MAKS-2011, Ramneskoe, August 2011 (Photo - A.V.Karpenko,http://bastion-karpenko.narod.ru).The model of the An-178, 2012 (http : //forum.milua.org).
Roll-out of the An-178 from the shop GP "Antonov", Kiev, 16.04.2015 (photo - Marina Lystseva,http://www.airliners.net/).An-178 in the first flight (http: // www .antonov.com /).
Construction- vysokoplan normal aerodynamic scheme with two engines on pylons Underwings.The design uses modern composite materials (the source).The design of the aircraft, many units in Russia.For example, the main and nose landing gear manufactured and delivered in Nizhny Novgorod JSC "Gidromash" (Russia).The aircraft can operate from airfields of any type, includinggrunovyh.
AN-178 before the first flight, the airport "Gostomel" 07/05/2015 (photo - Oleg Belyakov,http://www.airliners.net/).Projections of the AN-178 (https://avia.d3.ru, processed)
In 2010 it was planned to expand the assembly of AN-178 including Russia (equity participation in the project of 53%), but the decision on the participation of United Aircraft Corporation (UAC) in the project and has not been taken. November 29, 2010 reported on the development of conceptual design of the aircraft. The test was scheduled to start in 2013.The assembly of the fuselage of the first prototype completed in July 2014 completion of the assembly of the aircraft was planned for the end of 2014. In November 2014 began ground testing aircraft. When assembling №001 aircraft used components produced in Russia. Roll-out of the plane of the plant №001 held on 16 April 2015. In November 2014, began assembling №002 aircraft and as of April 22, 2015 has made its fuselage. The first flight of the An-178 made №001 May 7, 2015 at the airport SE "Antonov" "Gostomel".The flight duration is 1 hour crew performed test "Antonov" including: a test pilot 1st Class Andrew Thank you - crew commander, test pilot 1st Class Hero of Ukraine Sergey Troshin - co-pilot, a leading test engineer Nikolai Sidorenko (source).
The first flight of the An-178, the airport "Gostomel" 07/05/2015 (photo - Oleg Belyakov,http://www.airliners.net/).
Model AN-178 at MAKS-2011, Ramneskoe, August 2011 (Photo - A.V.Karpenko,http://bastion-karpenko.narod.ru).The model of the An-178, 2012 (http : //forum.milua.org).
Roll-out of the An-178 from the shop GP "Antonov", Kiev, 16.04.2015 (photo - Marina Lystseva,http://www.airliners.net/).An-178 in the first flight (http: // www .antonov.com /).
Construction- vysokoplan normal aerodynamic scheme with two engines on pylons Underwings.The design uses modern composite materials (the source).The design of the aircraft, many units in Russia.For example, the main and nose landing gear manufactured and delivered in Nizhny Novgorod JSC "Gidromash" (Russia).The aircraft can operate from airfields of any type, includinggrunovyh.
AN-178 before the first flight, the airport "Gostomel" 07/05/2015 (photo - Oleg Belyakov,http://www.airliners.net/).Projections of the AN-178 (https://avia.d3.ru, processed)