Patrol boat of the 2nd rank / frigate. The development of an export version of TFR / frigate launched in the mid-1980s the North PKB (Leningrad) on the basis of Raman pr.11351, chief designer - Vilor passes. In the design of the ship involves placing RCC "Uranus" and a new type of SAM.

The first series of frigates pr.11356 (3 pieces) for the Indian Navy built at the Baltic Shipyard (St. Petersburg) in 1999-2004 Signing a contract for the supply - November 17, 1997 Head frigate laid on the slipway in 1999 Launching of the first two ships of the series - 2000 series head frigate INS Talwar transferred to the Indian Navy June 18, 2003 In 2007 (contract signed in 2006 in the amount of 1.6 billion. USD) began construction of the second series pr.11356 ships for the Indian Navy (3 pieces). Changed the composition of the equipment installed on ships missile system PKR BrahMos .

Building of ships for the Russian Navy launched 18.12.2010, the laying of the first TFR "Admiral Grigorovich," a series of three ships in the project. Total, as of 2012 it is planned to build 6 frigates.Construction of the first three being under contract №704 / 27/2 / JSC / CN / 1176-10 from 28.10.2010, the second of three contract №3 / 1/1/0553 / GK-11-DGOZ from 13.09.2011 Mr. . ( ist. - Annual Report SPKB, 2011 ). Under the first contract March 29, 2011 signed a contract COR "Yanrar" with the North PKB: - for technical support and supervision during the construction manager. №01357 Project 11356 166 mln. Rubles., - to develop the documentation and technical support for the construction of ships of project 11356 - to 710.96 million. rubles.

gpgg7.jpg

Frigate Trishul F43 pr.11356, 2003 (photo Przemyslaw Gurgurewicz, http://pvo.guns.ru ).

FffBX.jpg

Pr.11356 frigate INS Tarkash sea trials, of 22.07.2012 (file photo Curious, http://forums.airbase.ru ). Photomontage with ships pr.11356 - F40 INS Talwar, F43 INS Trishul. Photo used no later than August 2010 (Vival, http://fotki.yandex.ru ). From left to right: F40 INS Talwar, F43 INS Trishul project 11356 Photos not later than August 2010 (photo - Vival, http: //fotki.yandex.ru ).

bUgCt.jpg



Zc4qM.jpg


uc4VV.jpg

Pr.11356 frigate of the Indian Navy. The photo INS Teg or ship the first series for the Indian Navy ( http://www.shipyard-yantar.ru ).

The propulsion system -
two-shaft gas turbine plant (GSTU) type COGAG M7N1, consisting of two afterburning turbine engines (GTE) DT-59 production GP Research and Production Complex "Zorya" - "Mashproekt" (Ukraine) with a capacity of 22,000 hp and two propulsion turbine engine of economic progress in the DC-71 production GP Research and Production Complex "Zorya" - "Mashproekt" (Ukraine) with a capacity of 8450 hp, working through complex gears on the two shafts and two fixed pitch propeller (FPP). Screw manufacturing series of frigates for the Russian Navy conducted at the Baltic Shipyard (St. Petersburg).
Maximum power plant capacity - 2 x 30450 hp In 2014, after the cessation of military-technical cooperation with Ukraine began preparing for the release of motor units for ships of the project in Russia. Estimated manufacturer - company "Turborus." It is expected that the first propulsion localized production will start to arrive at the plant in 2016-2017 gg

N1SSJ.jpg

Screw frigate "Admiral Essen" pr.11356R. launching, 11/07/2014 (photo - Vitaly Nevar, ТАСС - Новости в России и мире ).

Energy - 4 x diesel generators WCM-800 with a capacity of 800 kW (on Indian frigates)

xf77s.jpg

Projection and the cut TFR pr.11356 - Mod.KRIVAK-III (reconstruction of the Personnel of the film "The ship of a new generation"http://militaryrussia.ru ).

TTX ship :
crew - 180 people (including 18 officers) maximum length - 124.8 m width - 15.2 m Draft: - 4.2 / 4.5 m (standard displacement) - 7.5 m (overall) Displacement full - 4035 tons displacement standard - 3620/3830 m Speed full speed - 30 kt speed of economic progress - 14 ktCruising range: - 4,500 miles (18 kt) - 4850 miles (14 kt) Autonomy - 30 days Cost: - frigate pr. 11356 (1997 г.) was ok.330 million. USD - frigate pr.11356 second series (2006) was ok.533 million. USD
 
.
According to unconfirmed unofficial data headaches three settings A-190E is released under the "Arsenal" in violation of the technology of system loading. Consequences - at a single firing unit operates normally, but when firing bursts devices fail mechanically damaged deck.Identified weaknesses were still in testing at the site in Rzhevka conducted revision improved the situation only when shooting single shots (ist. - Fear passed).

bCull.jpg


BTLCC.jpg

PU vertical launch 3S14E on TFR pr.11356 ( http://alternathistory.org.ua ). Vertical launching system 3S14E on TFR pr.11356 - Mod.KRIVAK-III (the movie "The ship of the new generation", http: // www. youtube.com ). Start with PKR BrahMos presumably frigate INS Teg pr.11356 during maneuvers Indian Navy TROPEX-2013. Posted on 03/02/2013, the ( http://livefist.blogspot.ru ). The launcher with a rocket 3S90E 9M317E SAM " Calm ". Transfer the Indian Navy frigate INS Teg (F45) on the COR "Amber", Kaliningrad, 27.04.2012, the (photo - I.A.Mihaylov, http://forums.airbase.ru ). SAM "Calm-1 "launchers with vertical launch 3S90E.1 (left) on the model of the frigate pr.11356R, 2012 (photo - A.V.Karpenko,

tG3pg.jpg



AOaww.jpg



cgg7Z.jpg



2Pb22.jpg



RN0J5i1S5j.jpg


CgQvI05NnA.jpg

Frigate pr.11356 Trishul Indian Navy and installing A-190E option 1, 2003 (photo Przemyslaw Gurgurewicz, http://pvo.guns.ru ). Artillery unit A-190E for frigates pr.11356 (photo - Sergey Smolski, ТАСС - Новости в России и мире ).
 
.
Vzrii.jpg



gtQcy.jpg


NSeeB.jpg


CPHyy.jpg

Gradebook stralba 100-mm gun mount A-190 frigate INS Teg (F45), Baltic, of 22.12.2011 (
). The firing artillery installation A-190- 1E frigate INS Trikand pr.11356 factory during sea trials in the Baltic city of 02/05/2013 - 14/03/2013 (photo - V. Grib, Forward! №4 / 2013). The loading installation A-190-1 on TFR "Admiral Grigorovich" pr.11356R. Shipyard "Yantar" May 15, 2014 (photo - S.Mihaylov, "Forward!" From 23.05.2014, the Via Флот открытого океана: Третья попытка ). Launching of the frigate "Admiral Essen" pr.11356R with Gun Mount A-190-1, 11/07/2014 (photo - Vitaly Nevar, ТАСС - Новости в России и мире ).

r1nne.jpg



s6ssP.jpg



iAWja.jpg


CQHyp.jpg

Firing installation RBU-6000 during sea trials INS Tarkash Indian Navy, the Baltic, summer 2012 ( http://www.shipyard-yantar.ru ).weapons systems in the bow of the frigate INS Trikand pr.11356. Picture taken during factory sea trials in the Baltic Sea, the period 05-28.02.2013 (photo - M.Zavadsky, Forward! №3 / 2013). Installation of the first torpedo DTA-53-11356 on TFR "Admiral Grigorovich" pr.11356R, 18/06/2014 (photo Sergei Mikhailov, "Forward!" №11 / 2014).
 
. .
VDRRI.jpg



bYQQH.jpg



Equipment
:

pr.11356 first series for India pr.11356 second series for India
(zav.№№01354-01356) "Admiral Grigorovich" / pr.11356M
CICS (combat information management system) "Requirement M" are connected via Ethernet LAN terminals 8 T-171 battle management processes (18 "LCD-displays) and 3 T-server 162, in the same network operating system T-119, T-190 and datacenter Radar T-181 "The demand-M"
"The demand-M" ( source )
Radar detection of air targets Phased array radar "Fregat-M2EM" / TOP PLATE, frequency range E;
antenna speed - 6/12 rev / min
Range - up to 300 km
Radar detection of surface targets and target Radar 3TS25E "Chestnut" / "Harpoon-B", the frequency range I; target designation missile complex Club-N
Range - up to 500 km

Radar JMA MSA 5P10E radar gun mount A-190E with electro-optical and TV Vizier, the developer - CB "Amethyst" producer - JSC "Ratep";
Detection range - 60 km radar FCS MR-SAM 90 "Walnut"


Navigation system and radar Radar MR-212 / 201-1, the frequency range I; radar "Bridge Master" radar "Nucleus-2-6000A"Inertial "Ladoga-ME-11356" produced by the NGO "Elektropribor"


REP complex TC-25E-5
SJC and the ASG SJC APSON ( Advanced Panoramic Sonar Hull ) - active-passive sonar with target selection and automatic tracking for dr.dannym - GAS bel HUMSA ( Hull Mounted Sonar Array ) - Panoramic active-passive HOOK development Naval Physical and Oceanographic Laboratory (NPOL, India) . HAS MG-345 "Bronze" (possibly) GAS SSN-137 / STEER HIDE (not confirmed), midrange, active search;


Complex communications SSC Mk2

KMQzDmq9JW.jpg

Superstructure frigate Trishul pr.11356 with radar antenna post (view from the right side), 2003 (photo Przemyslaw Gurgurewicz,http://pvo.guns.ru + reconstruction http://militaryrussia.ru ). Antenna posts frigate INS Teg (F45) pr.11356 second series. Transfer frigate of the Indian Navy on Shipyard "Yantar", Kaliningrad, of 27.04.2012 (author photo - I.A.Mihaylov, http://forums.airbase.ru ).

DldzV.jpg


Modifications : - pr.11356 - frigate URO / TFR, Northern PKB developed since the mid-1980s. Two series of 3 pieces and are being built for the Indian Navy.

6off6.jpg

Side view of the frigate URO pr.11356 Talwar ( http://russian-ships.info ). Projections TFR pr.11356 ( http://military-press.livejournal.com ).

v5rrN.jpg


- Pr.11356R (previously encountered - "pr.11356M") - a variant of the frigate / TFR for the Russian Navy. The lead ship "Admiral Grigorovich," laid on 18.12.2010, the GCC "Amber". Under two contracts CVD "Amber" is to build six frigates pr.11356R for the Russian Navy (data for 2012, source ).

FPb22.jpg

Model frigate pr.11356R, 2012 (photo - A.V.Karpenko,

Status : Russia - 2010 October 28 - The Russian Defense Ministry has signed a contract with CVD "Amber" (Kaliningrad) to build three TFR pr.11356 (possibly pr.11356M). The contract was signed following a tender in which participated as well Amur Shipbuilding Plant "Severnaya Verf", "Admiralty Shipyards" and the Baltic Shipyard. The construction period for the contract amount (the first ship) 2 years and 10 months. - 2010 December 18 - in the GCC "Amber" laid the head TFR "Admiral Grigorovich" pr.11356M of a series of three TFR for the Russian Navy. Bookmark the second ship - "Admiral Essen" to be held July 8, 2011
 
.
dEvvR.jpg


WSf6s.jpg


GYPG3.jpg


foKK7.jpg

The ceremony of laying TFR "Admiral Grigorovich" section of the mortgage and the mortgage board, GCC "Amber", Kaliningrad, 18.12.2010 (photo I.A.Mihaylova and RIA "Novosti", http://forums.airbase.ru ).

- 2011 May 6 - on CVD "Amber" started harvesting hull structures for TFR "Admiral Essen" pr.11356M. Completed assembly of the 4th block TFR "Admiral Grigorovich."

- 2011 July 8 - on CVD "Amber" laid the second ship of the contract - TFR "Admiral Essen" pr.11356M of a series of three TFR for the Russian Navy.

6Obxo.jpg


JWOFF.jpg

Shifting boards and ceremony TFR "Admiral Essen" pr.11356 on CVD "Amber", Kaliningrad, 08.07.2011, the ( http://forums.airbase.ru ).Construction of housing TFR "Admiral Grigorovich" pr.11356 on CVD "Amber", Kaliningrad, 08.07.2011, the ( http://forums.airbase.ru ).

q8vmm.jpg


4DDuQ.jpg

Construction Corps TFR "Admiral Grigorovich" pr.11356 on CVD "Amber", Kaliningrad, November 2011 (photo - vvv39,http://forums.airbase.ru ).

- 2011 December 20 - in the media reported that construction work on the TFR for the Russian Navy, "Admiral Grigorovich" and "Admiral Essen."

- 2012 07 February - the newspaper "Kommersant", citing sources in the Russian Defense Ministry reported that the modified program of armaments to 2020 the number of TFR pr.11356 - 6 units - that confirms the earlier figures.

- 29 February 2012 - the media reported on the plans to put in the Russian Navy until 2016 6 TFR pr.11356. On CVD "Amber" laid the third ship to the Russian Navy - "Admiral Makarov".

- 2012 September 14 - the media reported about the plans bookmarks in October 2012 the fourth frigate pr.11356 for the Russian Navy.As of now the state of construction of the first three ships:
- "Admiral Grigorovich" - the body formed in 2013, is expected to hit the water.
- "Admiral Essen" - the case is almost formed.
- "Admiral Makarov" - the case is in the stage of formation blocks.

- 2012 October 12 - RIA "Novosti" spread information about the upcoming October 12 frigate pr.11356 fourth tab for the Russian Navy - "Admiral Butakov" ( source ). During the day the ceremony did not take place - according to unconfirmed information, the ceremony moved to a later date.
 
.
zNEvR.jpg

Left on the slipway frigate "Admiral Grigorovich" zav.№01357, GCC "Amber", Kaliningrad, 27.10.2012 (photo - 39rus,http://forums.airbase.ru ).

- 2013 March - Baltic Plant (St. Petersburg) started manufacturing three PU ship missile system "Caliber" for pr.11356 frigates being built for the Russian Navy in the GCC "Amber". Under the contract, the delivery of all three CP should be held before the end of 2014 №№4-6 frigates will also be equipped with PU production Baltic plant. In addition, in early 2013 the St. Petersburg shipyard produced three pairs of propellers for the first three Russian frigates, and recently signed an agreement to manufacture another six screws - for the second three ships. ( source ).

- 2013 March 7 - the frigate "Admiral Makarov" Construction on the GCC "Amber" began the final stage of the formation of the body - the assembly bow. Completion of the housing assembly is expected in May 2013

yDYll.jpg

Start docking bow of the hull of the frigate "Admiral Makarov" CVD "Amber", 03.07.2013 (photo - S.Mihaylov, Forward! №4 / 2013).

- 2013 June 14 - completed docked nose island housing the frigate "Admiral Makarov" and the rest of the ship. Completing the docking work is expected in July 2013

q0mmJ.jpg

Mortgage section frigate "Admiral Butakov" pr.11356R on CVD "Amber", the beginning of July 2013 (photo - S.Mihaylov,http://www.shipyard-yantar.ru ).

4D00m.jpg

Shifting boards TFR "Admiral Butakov" pr.11356, photo from 12.07.2013, the bookmark ( http://function.mil.ru ).

- 2013 July 12 - reported that the GCC "Yantar" in Kaliningrad on the newly built headquarters frigate "Admiral Grigorovich" pr.11356R completed loading of gas turbine engines and propulsion gear. Mounted propeller shafts. Soon his installation of a diesel generator and milling parts GGTA.

- 2014 04 February - the media reported that the head pr.11356 frigate for the Russian Navy, "Admiral Grigorovich" summer 2014 is planned to test SAM "Calm-1" with the launcher 3S90E.1 vertical launch 12 rockets.

- 2014 March 14 - at the Shipyard "Yantar" water lowered head pr.11356 frigate for the Russian Navy, "Admiral Grigorovich."

Hulld.jpg

Launch ceremony of the head of the frigate pr.11356 for the Russian Navy, "Admiral Grigorovich," Shipyard "Yantar", Kaliningrad, 03/14/2014 (photo - Igor Zarembo, РИА Новости ).

skG22.jpg

Pr.11356R head frigate for the Russian Navy, "Admiral Grigorovich," Shipyard "Yantar", Kaliningrad, 19/03/2014 (photo - Drakon 64,http://forums.airbase.ru ).

dwSee.jpg

Pr.11356R head frigate for the Russian Navy, "Admiral Grigorovich," Shipyard "Yantar", Kaliningrad, April 2014 (photo - oleg12226,http://forums.airbase.ru ).

- 2014 May 15 - on the TFR "Admiral Grigorovich" installed artillery unit A-190-01 ( source ) .. - 18 June 2014 - on the TFR "Admiral Grigorovich" shipped the first of two torpedo tubes DTA-53-11356 . Factory Press ( source ) noted that the progress of construction of the ship significantly hinders short supply of a number of facilities and equipment of the ship. However, it is noted that the ship will be delivered in time.



XKBYY.jpg

TFR "Admiral Grigorovich" in outfitting wall Shipyard "Yantar", 18.06.2014 (photo by Sergey Mikhailov, "Forward!" № 11/2014 г.).
- 2014 June 19 - the press service of the USC announced that the construction of a series of 6 TFR for the Russian Navy will not be completed in 2016, and in 2017 "The original contract was due date of the series - in 2016. However, since that the sixth frigate will be laid later than originally planned, then the term of delivery is really moved in 2017 "( source ). Most likely caused by a shift in timing of the termination of military-technical cooperation with Ukraine (PP production frigates).
 
.
I0nJA.jpg
Launching of the frigate "Admiral Essen" pr.11356R. 07/11/2014 (photo - Vitaly Nevar, ТАСС - Новости в России и мире ).

Exports :

India
- 1997 November 17 - signed a contract for the supply of three ships total value of 1 billion. USD. - 18 June 2003 - Indian Navy frigate took the first series of INS Talwar (F40), the contract transfer was to take place in May 2002 - 2003 June 25 - Indian Navy frigate took second series INS Trishul (F43), the contract transfer was to take place in November 2002 - 19 April 2004 - Indian Navy frigate took third series INS Tabar ( F44), the contract transfer was to take place in May 2003 - 14 July 2006 - signed a second contract for the supply of three more ships pr.11356 production CVD "Amber". The contract amount - 1.6 billion. USD (533 million USD for the ship). Subtracted from the amount of the contract penalties for failure of delivery time of ships under the first contract for 1 year in the amount of 40 million. USD.

- 2007 - in the GCC "Amber" (Kaliningrad) started the construction of ships of the second series.

Xb2oK.jpg

Frigate INS "Teg" (?), Factory №01354, after launching, Kaliningrad, 2009-2010 ( http://forums.airbase.ru ).

zqiEE.jpg

Frigate INS "Tarkash", factory №01355, launching ceremony, Kaliningrad, 23.06.2010 ( http://forums.airbase.ru ).

- 2010 December 16 - CVD "Amber" notified "Rosoboronexport" about the need to revise the terms of the contract with India. Requested an increase in funding for 100 million. USD and construction time. The media claimed that the value of the contract for the Indian Navy will not change.

dhh8v.jpg


w5sja.jpg

BDK "Ivan Gren" pr.11711 (right) and pr.11356 frigate for the Indian Navy Trikand at Shipyard "Yantar", Kaliningrad, May 2011 (http://forums.airbase.ru ).

- 2011 May 25 - launched the third frigate for the Indian Navy Trikand.

UYYkH.jpg

INS Trikand at a ceremony launching on the CCP "Yantar" in Kaliningrad, of 25.05.2011 ( http://www.newkaliningrad.ru ).



T7tkk.jpg

INS Tabar (F44) pr.11356 Mod. KRIVAK-III of the Indian Navy, 2011-2012, photo (Archive Randy M, http://www.militaryphotos.net ).

- 19 August 2011 - in the newspaper "Shipwright" from the words of the chief of construction orders pr.11356 Boris Twisting reported on the state of the second series pr.11356 frigates for India:
INS Teg (F45) - the ship is approaching the sea trials, prepares to start sea. Test the main propulsion system to be completed by 20.08.2011, the program PREPARING be completed by 25.08.2011, the
INS Tarkash (F50) - final stage of construction, not yet put the gun mount A-190, understaffed some other vehicle systems through the fault of subcontractors. Within two months, it is planned to complete the fabrication trudoprovodov. In November 2011, the ship should start mooring trials.
INS Trikand (F46?) - not completed grade ship lacks many types of equipment including cable of the required 150 pipe fitters on the ship is only 20. The outlook on the construction of yet.

- 2011 01 September - frigate INS Teg (F45) went on sea trials in the Baltic Sea. - 2011 November 18 - the preparation for mooring trials INS Tarkash. - 2011 December 22 - shooting from installation A-190 completed Sea trials of the frigate "Teg" for the Indian Navy. Made of fire bursts of 28 shots from the rate of fire of 70 rounds / min. Attempts to perform the scoring shooting was about ten. - 2011 December 26 - in the Baltic Sea successfully completed sea trials frigate INS Teg for the Indian Navy. Tested all systems, including missile systemBrahMos . To complete state tests left to make one out to sea in January 2012 - 17 January 2012 - Planned release date frigate INS Teg (F45) at the final stage of state tests. During sea trials frigate checked all the basic components and mechanisms, successfully conducted firing missile system BrahMos . transfer frigate of the Indian Navy is scheduled for April 2012 - 2012 07 February - CVD "Amber" state tests frigate INS Teg (F45). - 28 February 2012 - the state of work on a series of three frigates for the Indian Navy: - INS Teg (F45) - planned to convey India in April 2012. The tests are completed; - INS Tarkash (F50) - passes mooring trials; - INS Trikand (F46?) - is in the completion; - 2012 March 15 - Baltiysk started Maritime final stage of acceptance tests frigate INS Teg (F45). During sea trials necessary to replace one of the turbines of the ship. Transfer frigate India is scheduled for 27 April 2012 - 27 April 2012 - INS Teg (F45) handed over to the Indian Navy CVD "Amber".
 
.
N1See.jpg

Transfer the Indian Navy frigate INS Teg (F45) on the COR "Amber", Kaliningrad, 27.04.2012, the (photo - I.A.Mihaylov,http://forums.airbase.ru ). Transfer the Indian Navy frigate INS Teg (F45) pr.11356 second series. Shipyard "Yantar", Kaliningrad, 27.04.2012 In the background of one of the two frigates pr.11356 in- complete second series for the Indian Navy (author photo - I.A.Mihaylov, http://forums.airbase.ru ).

xTgCC.jpg


- 2012 May 18 - all work on the INS Tarkash (F50) completed - the ship is ready for sea trials. Start the test is scheduled for May 29, 2012 - 2012 May 24 - on the INS Tarkash (F50) officially started sea trials - the ship came to Baltiysk. Really started running out to sea June 4, 2012 Board number 703.

VvRdd.jpg


l4VM9.jpg

F45 INS Teg frigate of the Indian Navy in the port of Valletta, Malta, 27.05.2012 (photo - albireo2006,Flickr: albireo 2006's Photostream ). pr.11356 Frigate INS Tarkash sea trials, summer 2012 . ( http://www.shipyard-yantar.ru ).pr.11356 Frigate INS Tarkash sea trials, Baltic, summer 2012 (file photo Vyacheslav Semenkova, http://forums.airbase.ru ).

Ajawn.jpg



6kbxx.jpg


- 2012 August 25 - in the media reported that sea trials INS Tarkash (F46) in the Baltic Sea successfully completed. In September, the ship returned to Kaliningrad and the official transfer of the ship is scheduled for India in November 2012 - 2012 September 15 - on the ship INS Trikand announced the beginning of the mooring trials.



zi990.jpg

INS Trikand on CVD "Amber", Kaliningrad, of 15.09.2012 ("Forward!", №17, 28.09.2012 city). INS Tarkash F50 on CVD "Amber", Kaliningrad, 27.10.2012 Mr. . (photo - 39rus, http://forums.airbase.ru ).

LkkH3.jpg


- 2012 09 November - in Kaliningrad on CVD "Yantrar" to be held the ceremony of transfer of the second ship of the Indian Navy frigates pr.11356 second series - INS Tarkash (F50). Transfer the third ship INS Trikand expected summer 2013 after sea trials, which will begin in the spring of 2013
 
.
HhD0Q.jpg

Frigate INS Tarkash F50 at the handover ceremony of the Indian Navy, the GCC "Amber", Kaliningrad, November 9, 2012 (photo - I.A.Mihaylov, http://forums.airbase.ru , assembly). Frigate INS Tarkash F50 at the handover ceremony of the Indian Navy, the GCC "Amber", Kaliningrad, November 9, 2012 (photo - I.A.Mihaylov, http://forums.airbase.ru ).

r9wSS.jpg


- 2012 November 12 - in the Russian media quoted one of the officials has information about the plans of the Indian contract for the construction of three more frigates pr.11356. In the case of confirmation of this information in the case of performing such a contract in the Indian Navy will be 9 frigates pr.11356. At the beginning of February 2013, this information is not confirmed by our Indian sources of information. - 2012 December 27 - the frigate INS Tarkash F50 arrived in India ( source ). - 2013 February 14 - frigate INS Trikand pr.11356 released in Baltic sea trials. The official start of the test - February 8 - the day before the ship moved from akvatarii SRH military harbor Baltiysk ( source ). - 2013 04 March - began training Indian crew INS Trikand. On April 1, 2013 will ship crew practice, and on May 2 is scheduled to begin acceptance testing of the ship. the transfer of the ship of the Indian Navy is scheduled for June 2013 ( source ). - 2013 March 14 - frigate INS Trikand pr.11356 factory completed sea trials. During the tests performed five ship goes to sea, includingperformed firing artillery unit ( source ). - 2013 April 17 - frigate INS Trikand pr.11356 completed state tests of the sea. The tests were started April 4, 2013 in Baltiysk. Since April 8 regularly ship out to sea polygons of the Baltic Fleet, which showed the state commission all systems and mechanisms, including weapons. March 17 plant commissioning team and the crew of the Baltic Fleet conducted missile firing anti-aircraft complex "Calm-1." "As a result of firing was struck by a missile target moving at a height of 50 m above sea level - the project manager 11356 Shipyard" Yantar "Alevtin Dmitriev ( source ). - 2 May 2013 - is scheduled to begin acceptance testing frigate INS Trikand pr.11356 ( source ). - 2013 May 22 - off the coast of Goa made successful launch of BrahMos, the missile range - 290 km. The missile carried a C-shaped maneuver in height. Start was first produced from the frigate INS Tarkash pr.11356 Indian Navy.

aK66s.jpg

Start missile BrahMos on board the frigate INS Tarkash pr.11356, 22.5.2013, the ( http://www.npomash.ru ).

- 2014 August 13 - the media reported that the upcoming India tenders for new frigates will be offered three ships pr.11356 Russian propulsion ( source ).

Your Comment Please

@anant_s @kaykay @vostok @Tshering22 @Agent Smith @xuxu1457 @kaku1 @Zarvan @OrionHunter @CONNAN @Hindustani78 @Ind4Ever @Stephen Cohen @WebMaster @WEB CONSULTANTS @webxeon @Capt.Popeye @Captain Maverick @500 @TankMan @Water Car Engineer, @Frosty, @aazidane, @ptldM3, @Sinopakfriend, @definitelynotIndian, @Srinivas, @Bill_Maher, @Rizwan Qayyum, @waz, @timetravel, @The Pakistani, @Kyle Sun, @Tractor, @Kinetic, @IND151, @Sunan, @third eye, @zeeshanvita, @egolfs, @sahaliyan, @Marxist, @bhagat, @Devilduck, @NMTD, @Ahmed Eid, @war is peace, @Psychic, @na088, @Khalid Newazi, @Razia Sultana, @Border Defender, @HariPrasad, @Mustang06, @ManavKalia, @Beast, @70U63, @whitefox011, @nik141991, @Shoaib Rathore, @AndrewJin, @Brahma Bull, @Rafael, @Navigator, @SecularNationalist, @danish @Saleem, @hinduguy, @Djinn, @Bang Galore, @hans @migflug @babbar, @MilSpec, @SvenSvensonov, @vsdave2302, @Echo_419, @ayesha.a, @Kinetic
@gambit, @Storm Force , @ptltejas, @The Great One, @PARIKRAMA, @Czar786, @Superboy, @Viper0011., @LittleFish, @sicsheep, @kṣamā, @definitelynotIndian, @gslv mk3, @45'22', @Shinigami
@Umair Nawaz, @manishmaithani, @Dash, @Soumitra, @Raje amar, @Dadagiri, @Omega007, @kahonapyarhai, @hkdas, @sathya, @UKBengali, @#hydra# @Srinivas, @jaiind, @Screambowl, @Abingdonboy @mauka, @The_Sidewinder, @The BrOkEn HeArT @deckingraj, @DeathInvader, @Guynextdoor2
 
.
Nice Work mate. I appreciate your hard work in digging so much information out. :tup: :tup: :tup:

:cheers:
 
Last edited:
. . . . . .

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom