Major Shaitan Singh
SENIOR MEMBER
- Joined
- Dec 7, 2010
- Messages
- 3,550
- Reaction score
- 43
- Country
- Location
Patrol boat of the 2nd rank / frigate. The development of an export version of TFR / frigate launched in the mid-1980s the North PKB (Leningrad) on the basis of Raman pr.11351, chief designer - Vilor passes. In the design of the ship involves placing RCC "Uranus" and a new type of SAM.
The first series of frigates pr.11356 (3 pieces) for the Indian Navy built at the Baltic Shipyard (St. Petersburg) in 1999-2004 Signing a contract for the supply - November 17, 1997 Head frigate laid on the slipway in 1999 Launching of the first two ships of the series - 2000 series head frigate INS Talwar transferred to the Indian Navy June 18, 2003 In 2007 (contract signed in 2006 in the amount of 1.6 billion. USD) began construction of the second series pr.11356 ships for the Indian Navy (3 pieces). Changed the composition of the equipment installed on ships missile system PKR BrahMos .
Building of ships for the Russian Navy launched 18.12.2010, the laying of the first TFR "Admiral Grigorovich," a series of three ships in the project. Total, as of 2012 it is planned to build 6 frigates.Construction of the first three being under contract №704 / 27/2 / JSC / CN / 1176-10 from 28.10.2010, the second of three contract №3 / 1/1/0553 / GK-11-DGOZ from 13.09.2011 Mr. . ( ist. - Annual Report SPKB, 2011 ). Under the first contract March 29, 2011 signed a contract COR "Yanrar" with the North PKB: - for technical support and supervision during the construction manager. №01357 Project 11356 166 mln. Rubles., - to develop the documentation and technical support for the construction of ships of project 11356 - to 710.96 million. rubles.
Frigate Trishul F43 pr.11356, 2003 (photo Przemyslaw Gurgurewicz, http://pvo.guns.ru ).
Pr.11356 frigate INS Tarkash sea trials, of 22.07.2012 (file photo Curious, http://forums.airbase.ru ). Photomontage with ships pr.11356 - F40 INS Talwar, F43 INS Trishul. Photo used no later than August 2010 (Vival, http://fotki.yandex.ru ). From left to right: F40 INS Talwar, F43 INS Trishul project 11356 Photos not later than August 2010 (photo - Vival, http: //fotki.yandex.ru ).
Pr.11356 frigate of the Indian Navy. The photo INS Teg or ship the first series for the Indian Navy ( http://www.shipyard-yantar.ru ).
The propulsion system -
two-shaft gas turbine plant (GSTU) type COGAG M7N1, consisting of two afterburning turbine engines (GTE) DT-59 production GP Research and Production Complex "Zorya" - "Mashproekt" (Ukraine) with a capacity of 22,000 hp and two propulsion turbine engine of economic progress in the DC-71 production GP Research and Production Complex "Zorya" - "Mashproekt" (Ukraine) with a capacity of 8450 hp, working through complex gears on the two shafts and two fixed pitch propeller (FPP). Screw manufacturing series of frigates for the Russian Navy conducted at the Baltic Shipyard (St. Petersburg).
Maximum power plant capacity - 2 x 30450 hp In 2014, after the cessation of military-technical cooperation with Ukraine began preparing for the release of motor units for ships of the project in Russia. Estimated manufacturer - company "Turborus." It is expected that the first propulsion localized production will start to arrive at the plant in 2016-2017 gg
Screw frigate "Admiral Essen" pr.11356R. launching, 11/07/2014 (photo - Vitaly Nevar, ТАСС - Новости в России и мире ).
Energy - 4 x diesel generators WCM-800 with a capacity of 800 kW (on Indian frigates)
Projection and the cut TFR pr.11356 - Mod.KRIVAK-III (reconstruction of the Personnel of the film "The ship of a new generation"http://militaryrussia.ru ).
TTX ship :
crew - 180 people (including 18 officers) maximum length - 124.8 m width - 15.2 m Draft: - 4.2 / 4.5 m (standard displacement) - 7.5 m (overall) Displacement full - 4035 tons displacement standard - 3620/3830 m Speed full speed - 30 kt speed of economic progress - 14 ktCruising range: - 4,500 miles (18 kt) - 4850 miles (14 kt) Autonomy - 30 days Cost: - frigate pr. 11356 (1997 г.) was ok.330 million. USD - frigate pr.11356 second series (2006) was ok.533 million. USD
The first series of frigates pr.11356 (3 pieces) for the Indian Navy built at the Baltic Shipyard (St. Petersburg) in 1999-2004 Signing a contract for the supply - November 17, 1997 Head frigate laid on the slipway in 1999 Launching of the first two ships of the series - 2000 series head frigate INS Talwar transferred to the Indian Navy June 18, 2003 In 2007 (contract signed in 2006 in the amount of 1.6 billion. USD) began construction of the second series pr.11356 ships for the Indian Navy (3 pieces). Changed the composition of the equipment installed on ships missile system PKR BrahMos .
Building of ships for the Russian Navy launched 18.12.2010, the laying of the first TFR "Admiral Grigorovich," a series of three ships in the project. Total, as of 2012 it is planned to build 6 frigates.Construction of the first three being under contract №704 / 27/2 / JSC / CN / 1176-10 from 28.10.2010, the second of three contract №3 / 1/1/0553 / GK-11-DGOZ from 13.09.2011 Mr. . ( ist. - Annual Report SPKB, 2011 ). Under the first contract March 29, 2011 signed a contract COR "Yanrar" with the North PKB: - for technical support and supervision during the construction manager. №01357 Project 11356 166 mln. Rubles., - to develop the documentation and technical support for the construction of ships of project 11356 - to 710.96 million. rubles.
Frigate Trishul F43 pr.11356, 2003 (photo Przemyslaw Gurgurewicz, http://pvo.guns.ru ).
Pr.11356 frigate INS Tarkash sea trials, of 22.07.2012 (file photo Curious, http://forums.airbase.ru ). Photomontage with ships pr.11356 - F40 INS Talwar, F43 INS Trishul. Photo used no later than August 2010 (Vival, http://fotki.yandex.ru ). From left to right: F40 INS Talwar, F43 INS Trishul project 11356 Photos not later than August 2010 (photo - Vival, http: //fotki.yandex.ru ).
Pr.11356 frigate of the Indian Navy. The photo INS Teg or ship the first series for the Indian Navy ( http://www.shipyard-yantar.ru ).
The propulsion system -
two-shaft gas turbine plant (GSTU) type COGAG M7N1, consisting of two afterburning turbine engines (GTE) DT-59 production GP Research and Production Complex "Zorya" - "Mashproekt" (Ukraine) with a capacity of 22,000 hp and two propulsion turbine engine of economic progress in the DC-71 production GP Research and Production Complex "Zorya" - "Mashproekt" (Ukraine) with a capacity of 8450 hp, working through complex gears on the two shafts and two fixed pitch propeller (FPP). Screw manufacturing series of frigates for the Russian Navy conducted at the Baltic Shipyard (St. Petersburg).
Maximum power plant capacity - 2 x 30450 hp In 2014, after the cessation of military-technical cooperation with Ukraine began preparing for the release of motor units for ships of the project in Russia. Estimated manufacturer - company "Turborus." It is expected that the first propulsion localized production will start to arrive at the plant in 2016-2017 gg
Screw frigate "Admiral Essen" pr.11356R. launching, 11/07/2014 (photo - Vitaly Nevar, ТАСС - Новости в России и мире ).
Energy - 4 x diesel generators WCM-800 with a capacity of 800 kW (on Indian frigates)
Projection and the cut TFR pr.11356 - Mod.KRIVAK-III (reconstruction of the Personnel of the film "The ship of a new generation"http://militaryrussia.ru ).
TTX ship :
crew - 180 people (including 18 officers) maximum length - 124.8 m width - 15.2 m Draft: - 4.2 / 4.5 m (standard displacement) - 7.5 m (overall) Displacement full - 4035 tons displacement standard - 3620/3830 m Speed full speed - 30 kt speed of economic progress - 14 ktCruising range: - 4,500 miles (18 kt) - 4850 miles (14 kt) Autonomy - 30 days Cost: - frigate pr. 11356 (1997 г.) was ok.330 million. USD - frigate pr.11356 second series (2006) was ok.533 million. USD