NG Missile Vessels
FULL MEMBER
- Joined
- Apr 9, 2023
- Messages
- 1,600
- Reaction score
- 0
- Country
- Location
Construction of SBC-2, the second final-assembly line for the Indian Navy's six-boat SSN project, should be completed by the end of 2024. Thus, it can be concluded that the various hull-sections fabricated by Larsen & Toubro at its Hazira industrial facility will start arriving at SBC-2 from early 2025 onwards. This in turn implies fabrication of hull modules have already commenced at Hazira with the DMR-292A/292B steel that is being produced by SAIL.
Updates from Vizag, Bhuj & Naliya
Construction of SBC-2, the second final-assembly line for the Indian Navy's six-boat SSN project, should be completed by the end of 2024. Th...
trishul-trident.blogspot.com
Last edited: