Avicenna
SENIOR MEMBER
- Joined
- Oct 18, 2016
- Messages
- 5,795
- Reaction score
- 0
- Country
- Location
BAF sets the technical criteria and carries out technical evaluation of tender propsals but decision making is influenced by lobbyists.
Procurement decisions need A-ok from MoD, MoF, and PMO.
Ideally, I would like to see 4 squadrons of Gripens (or 3 x Gripen + 1 × EFT) to gradually replace the entire existing fleet.
Bangladesh doesn't need and can't afford a large fleet of modern fighters.
Realistically, all that's needed are 32-48 examples.
Even that is expensive.
But that equates to 2-3 full strength squadrons. (Western sourced with Western training)
A major boost in capability from where things are now.