What's new

Arjun MK-II Gearing up for final trials

Anony

FULL MEMBER
Joined
Sep 13, 2012
Messages
677
Reaction score
-1
Country
India
Location
India
I0dVx.jpg


Arjun MK-II is all set and gearing up for its final Summer Trials which are to be held by end of next month or in early July before it hits productions. Indian army has asked for 93 improvements to the Arjun Mark II tank including 19 major modifications.

All the modifications suggested by the army had been successfully incorporated in the tank and will be ready for final trials by Indian army after which DRDO will seek clearance for production to start. Heavy Vehicles Factory (HVF) Avadi will need 30 months (Two and a half years) to deliver first batch of Arjun MK-2 to Indian army, DRDO is also hoping for fresh orders of Arjun MK-II from its current 126 placed by Indian army some time back.

MK-2 will see increase in weight from 62 tonne to 67 tonne. The suspension has been re-designed to handle up to 70 tonne weight. Wheels are bigger in dimensions and have improved track length, MK-2 will be powered by the same MTU engine imported from Germany but it has been improved to carry extra weight of the tank but the top speed of the tank will be limited to 58kmph coming down from 72kmph seen on MK-1 Arjun. DRDO is working on indigenous powerhouse for future tanks but Integrations with Arjun can only happen if Army places order for 3 more Regiments of Arjun MKII (350). Otherwise it will only serve in next generation battle tank which Drdo is developing under Futuristic Main Battle Tank (FMBT) Program for Indian Army post 2020.

MK-2 will have improvements like missile firing capability, improved commander’s panoramic sight with night vision, Hunter killer capability, improved Auxiliary Power Unit (APU) , improved communication equipments along with better navigation aid , full frontal Explosive Reactive Armour (ERA), Mine plough , improved gun barrel , additional ammunition types.

In Previous trials MK2 did not face any issues and Army was satisfied with its performance, DRDO has now completed all the improvements asked by Indian army on MK-2 variant and hopes Army will be satisfied after final rounds of trials and clears production of it along with fresh orders.
 
I am looking forward to see the trails of Arjun MK2. I hope it convince the Indian army that it can challenge any tank in the World with his performance..Good luck
 
I0dVx.jpg





In Previous trials MK2 did not face any issues and Army was satisfied with its performance, DRDO has now completed all the improvements asked by Indian army on MK-2 variant and hopes Army will be satisfied after final rounds of trials and clears production of it along with fresh orders.
\

Most Encouraging.
 
I have already posted 68 posts. Can some body tell me please how to start a new thread/topic?
 
I have already posted 68 posts. Can some body tell me please how to start a new thread/topic?


Scroll down on your login page. You will find many sections like INDIAN DEFENCE, PAKISTAN DEFENCE, AIR WARFARE,etc. Select an appropriate section. Then click on Post New Thread. Now you can start a new thread here.

OR

Scroll up on any page. Left of forum you will find a Hut Shaped button. Click on it.Then Scroll down. You will find many sections like INDIAN DEFENCE, PAKISTAN DEFENCE, AIR WARFARE,etc. Select an appropriate section. Then click on Post New Thread. Now you can start a new thread here.


BEST OF LUCK
 
Hmm... No mention of APS or, RCWS.... Still good enough..
 
Hmm... No mention of APS or, RCWS.... Still good enough..

RCWS will be present- one just hasn't been selected yet and an APS will be present on from the second batch onward.
 
the weight issue also gt solved ? I dont think so ?

I really don't understand the requirement of IA. At one place they want Arjun to carry maximum weapon, carry and fire maximum type of weapon, wants ERA throughout the frontal area, Wants the best armour,etc,etc. Then how come they can ask for a 55 ton platform. Even T-90 don't posses all these qualities. IA's requirement are more close to M1Abram but they want weight of T-90. Practically a tough nut to crack OR simply a process to keep importing weapon and fill their pockets with bribes.
 
RCWS will be present- one just hasn't been selected yet and an APS will be present on from the second batch onward.

Wonder how difficult it would be to design a RCWS in house... Plus we take too long to decide on something as small as this.
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom