Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Or may be like PMLN = Pakistan mein loadsheding nahin ☺☺☺PMLN = Pakistan Main Light Nahi
Dont waste time contact nab , anti corruption dept or army to take action.
it is the fault of government who gave the contact to a telecommunication company with no solar power experience at all.worlds largest has some 500 mw. this one is going to be 900 w. well if its not producing at its highest capacity, its the fault of chinese company.
it is the fault of government who gave the contact to a telecommunication company with no solar power experience at all.