What's new

Al-Khalid II has been put to sleep .

kaonalpha

FULL MEMBER
Joined
Dec 3, 2014
Messages
1,290
Reaction score
1
Country
Pakistan
Location
Pakistan
After having an hourly long discussion with a senior contact at HIT. This sad news was revealed to me that the al-khalid 2 has been temporarily put on hold and right now mass production of Al khalid 1 will continue with upgrading.The Al-khalid 2 is becoming more costly to bear. Its survival depends upon the top brass sitting in GHQ

He informed me that don't be surprised if MBT 3000 is revealed as Al-khalid 2.

:(
 
After having an hourly long discussion with a senior contact at HIT. This sad news was revealed to me that the al-khalid 2 has been temporarily put on hold and right now mass production of Al khalid 1 will continue with upgrading.The Al-khalid 2 is becoming more costly to bear. Its survival depends upon the top brass sitting in GHQ

He informed me that don't be surprised if MBT 3000 is revealed as Al-khalid 2.

:(

@Dazzler That's why they didn't revealed Al-Khalid II in IDEAS 2014. All the talks about 9 major upgrades downgraded to 6 and then it would be revealed in Ideas 2016, now the entire program is put on hold
 
@Dazzler That's why they didn't revealed Al-Khalid II in IDEAS 2014. All the talks about 9 major upgrades downgraded to 6 and then it would be revealed in Ideas 2016, now the entire program is put on hold
Wrong news their was no AL KHALID II in first place their was AL KHALID 1 and it has those changes so he is wrong here
 
After having an hourly long discussion with a senior contact at HIT. This sad news was revealed to me that the al-khalid 2 has been temporarily put on hold and right now mass production of Al khalid 1 will continue with upgrading.The Al-khalid 2 is becoming more costly to bear. Its survival depends upon the top brass sitting in GHQ

He informed me that don't be surprised if MBT 3000 is revealed as Al-khalid 2.

:(
Their was no AK 2 project in first place for GOD sake
 
Al-Khalid II??

yeh Kb hua? and MBT-3000 if inducted in Pakistan will have a have a different name no???

Hearing about Al-Haider ??
 
Mbt 3000 Is alkhalid 2
AK 1 is the project which some members in their innocence think is AK-2 the AL Khalid has been massively upgraded and will be in production soon that upgraded beast is AK-1 the guy you are talking to is distorting facts for some reason
 
Mass production of AlKhalid? How many we are mass producing? 600 by 2015? Are they enough? As fad as I know there was plans for AlKhalid3 and Mbt3000 was to appear as AlHaider. @Zarvan game is in ghq pocket bro :(
 
Mass production of AlKhalid? How many we are mass producing? 600 by 2015? Are they enough? As fad as I know there was plans for AlKhalid3 and Mbt3000 was to appear as AlHaider. @Zarvan game is in ghq pocket bro :(
Their was no AK-2 the AL-KHALID was massively upgraded and now in production is known as AK-1 which will be soon revealed our dear member is misinformed here on this issue
 
Mass production of AlKhalid? How many we are mass producing? 600 by 2015? Are they enough? As fad as I know there was plans for AlKhalid3 and Mbt3000 was to appear as AlHaider. @Zarvan game is in ghq pocket bro :(
You do know we sold 150 AKs to SA of the shelf hence mass production.
 
we need alkhalid 1 we dont need alkhalid -2 we have so many things number -2 in pakistan in fact every thing is number -2 in pakistan :D 2 number aye oyeee:rofl:
 
Called asked and insulted he stands by his word. I'll have to wait when I'm going back I'll pay a visit to HIT
 

Latest posts

Pakistan Defence Latest Posts

Back
Top Bottom