Akhori Dam Project
Location
Akhori Dam site is located near Akhori Village across Nandna Kas, a small tributary of Haro River in Attock District of Punjab. The Dam site Co-ordinates are 330 42’ 23” N and 720 26’ 34” E.
Objectives
Gross Head (i) Storage of water for Supplementing Indus Basin Irrigation System.
(ii) Power Generation 600 MW (2155 GWh/Annum)
Salient Features
Main Dam
Dam Type Earth & Rock Filled
Height/Length 400 ft/ 16930 ft
Gross Storage 7.6 MAF
Live Storage 7.0 MAF
Saddle Dam
Height 213 ft
Length 4.78 Miles
Conveyance Channel
Conveyance Channel Length 23 Miles (37 Km)
Conveyance Channel Capacity 60,000 Cusecs
Bed Width 249.3 ft (76 m)
Depth 32.8 ft (10 m)
Resettlement Statistics
No. Of Affectees 55,800
No. Of Houses 9270
Land 65976 Acres
Roads 102 Km
Estimated Cost (2005) US $ 4.40 Billion (Rs. 264.00 Billion)
Estimated Cost (2005) US $ 4.01 Billion (Rs. 401.25 Billion)
Construction Period 5 Years
EIRR 15%
Status
FEASIBILITY STUDY
• PC-II approved for Rs. 194.804 million by CDWP through circulation in March 19, 2004.
• Final Feasibility Study Report, prepared by M/S Techno-Consult International, has been received on Jan. 26, 2006.
• Revised PC-II for feasibility study amounting to Rs. 286.857 million submitted to Planning Commission for approval on 16.8.2008.
• Planning Commission returned the Revised PC-II Proforma for feasibility study in August 2014 with the remarks “If approval of the subject PC-II is still required, the case may be submitted afresh along with source of funding”.
• WAPDA clarified on 29.09.2014 that the Project is already completed, hence no change in PC-II cost. Regarding source of funding it was intimated that Govt. of Pakistan has already provided its share of Rs. 100 million through PSDP, the balance will be financed by WAPDA. PC-II approval is required to regularize the already incurred expenditure and to clear the liabilities.
• MoW&P has cleared and forwarded the PC-II Proforma to Planning Commission on September 21, 2015 for approval.
• CDWP has approved the PC-II for Feasibility Study of Akhori Dam project on 08.02.2016.
DETAILED ENGINEERING DESIGN
• PC-II for Detailed Engineering Design and Tender Documents of the Project amounting to Rs. 818.00 Million submitted on June 23, 2006 for approval of ECNEC.
• PC-I (April, 2006) amounting to Rs. 67023 million for land acquisition and resettlement of Affectees under approval of ECNEC.
STAKEHOLDER’S CONSULTATIONS
• Feasibility Study was shared with provinces, comments received on Dec. 30, 2006 and responded on Jan.18, 2007.
• Presentation to Punjab held on May 14, 2007. WAPDA requested Govt. of Sindh on
April 28 & June 30, 2007 and Govt. of KPK on May 17, May 27 & June 30, 2007 to allocate time slot for presentation.
• Due to non allocation of time slot for presentation, a meeting was held on Dec. 01, 2007 under the chairmanship of Secretary MoW&P, it was decided that “The Ministry shall convene a meeting in Islamabad to discuss the observations of provinces on Feasibility Study of Akhori Dam Project as soon as possible”.
• MoW&P scheduled a meeting on April 30, 2009 under the chairmanship of Secretary to evolve consensus for the project but the meeting was cancelled.
• P&D Department, Govt. of Sindh communicated further comments vide letter dated 05.05.2009, annotated reply was submitted on 04.09.2009.
• WAPDA requested Govt. of Punjab on July 11, 2014 to evolve consensus among provinces on Project Feasibility.
• MoW&P desired information on July 02, 2015 on Water Availability and Environmental Impacts to satisfy provincial concerns. Report was submitted on July 16, 2015.
• WAPDA presented Akhori Dam Project to Secretary Irrigation, Govt. of Punjab on Sept. 16, 2015 and requested to develop consensus among Provinces so that work on the Project may be started at the earliest.
Location
Akhori Dam site is located near Akhori Village across Nandna Kas, a small tributary of Haro River in Attock District of Punjab. The Dam site Co-ordinates are 330 42’ 23” N and 720 26’ 34” E.
Objectives
Gross Head (i) Storage of water for Supplementing Indus Basin Irrigation System.
(ii) Power Generation 600 MW (2155 GWh/Annum)
Salient Features
Main Dam
Dam Type Earth & Rock Filled
Height/Length 400 ft/ 16930 ft
Gross Storage 7.6 MAF
Live Storage 7.0 MAF
Saddle Dam
Height 213 ft
Length 4.78 Miles
Conveyance Channel
Conveyance Channel Length 23 Miles (37 Km)
Conveyance Channel Capacity 60,000 Cusecs
Bed Width 249.3 ft (76 m)
Depth 32.8 ft (10 m)
Resettlement Statistics
No. Of Affectees 55,800
No. Of Houses 9270
Land 65976 Acres
Roads 102 Km
Estimated Cost (2005) US $ 4.40 Billion (Rs. 264.00 Billion)
Estimated Cost (2005) US $ 4.01 Billion (Rs. 401.25 Billion)
Construction Period 5 Years
EIRR 15%
Status
FEASIBILITY STUDY
• PC-II approved for Rs. 194.804 million by CDWP through circulation in March 19, 2004.
• Final Feasibility Study Report, prepared by M/S Techno-Consult International, has been received on Jan. 26, 2006.
• Revised PC-II for feasibility study amounting to Rs. 286.857 million submitted to Planning Commission for approval on 16.8.2008.
• Planning Commission returned the Revised PC-II Proforma for feasibility study in August 2014 with the remarks “If approval of the subject PC-II is still required, the case may be submitted afresh along with source of funding”.
• WAPDA clarified on 29.09.2014 that the Project is already completed, hence no change in PC-II cost. Regarding source of funding it was intimated that Govt. of Pakistan has already provided its share of Rs. 100 million through PSDP, the balance will be financed by WAPDA. PC-II approval is required to regularize the already incurred expenditure and to clear the liabilities.
• MoW&P has cleared and forwarded the PC-II Proforma to Planning Commission on September 21, 2015 for approval.
• CDWP has approved the PC-II for Feasibility Study of Akhori Dam project on 08.02.2016.
DETAILED ENGINEERING DESIGN
• PC-II for Detailed Engineering Design and Tender Documents of the Project amounting to Rs. 818.00 Million submitted on June 23, 2006 for approval of ECNEC.
• PC-I (April, 2006) amounting to Rs. 67023 million for land acquisition and resettlement of Affectees under approval of ECNEC.
STAKEHOLDER’S CONSULTATIONS
• Feasibility Study was shared with provinces, comments received on Dec. 30, 2006 and responded on Jan.18, 2007.
• Presentation to Punjab held on May 14, 2007. WAPDA requested Govt. of Sindh on
April 28 & June 30, 2007 and Govt. of KPK on May 17, May 27 & June 30, 2007 to allocate time slot for presentation.
• Due to non allocation of time slot for presentation, a meeting was held on Dec. 01, 2007 under the chairmanship of Secretary MoW&P, it was decided that “The Ministry shall convene a meeting in Islamabad to discuss the observations of provinces on Feasibility Study of Akhori Dam Project as soon as possible”.
• MoW&P scheduled a meeting on April 30, 2009 under the chairmanship of Secretary to evolve consensus for the project but the meeting was cancelled.
• P&D Department, Govt. of Sindh communicated further comments vide letter dated 05.05.2009, annotated reply was submitted on 04.09.2009.
• WAPDA requested Govt. of Punjab on July 11, 2014 to evolve consensus among provinces on Project Feasibility.
• MoW&P desired information on July 02, 2015 on Water Availability and Environmental Impacts to satisfy provincial concerns. Report was submitted on July 16, 2015.
• WAPDA presented Akhori Dam Project to Secretary Irrigation, Govt. of Punjab on Sept. 16, 2015 and requested to develop consensus among Provinces so that work on the Project may be started at the earliest.