What's new

After Mars Mission, Isro set to launch GSLV on 15 December

Brahmos_2

FULL MEMBER
Joined
Feb 19, 2013
Messages
1,412
Reaction score
0
Country
India
Location
India
Isro set to launch GSLV on 15 December

GSLV2.jpg



Bangalore:
Even as ISRO successfully launched the Mars Orbiter Mission (MOM), preparations are in full swing for flight-testing of GSLV with indigenous cryogenic engine, a key step to boost the country’s confidence in terms of its self-reliance in launch capability, on December 15.

“We have put all our efforts for the development of GSLV”, ISRO Chairman K Radhakrishnan said. “The assembly of GSLV is going on at Sriharikota. It started on October 18. Now, the launch is scheduled for December 15th”.

The maiden flight testing of the indigenous cryogenic engine and stage conducted in GSLV-D3 on April 15, 2010, failed. ISRO made another attempt on August 19 this year but the the launch was called off as a leak was observed in the UH25 fuel system of the liquid second stage during the pre-launch pressurisation phase on the vehicle just two hours before the scheduled lift-off.

GSLV is a three stage vehicle. GSLV is 49 metre tall, with 414 tonne lift off weight. First stage comprises S125 solid booster with four liquid (L40) strap-ons. Second stage (GS2) is liquid engine and the third stage (GS3) is a cryostage.

The cryostage is more efficient compared to the liquid stage in PSLV. This means that the thrust developed by burning each kg of propellant is higher in cryo engine, hence can place larger payloads with higher weight into orbit. “Cryo stage as final stage is hence essential for a launcher with higher payload capacity”, an ISRO official said.

PSLV is capable of launching 1600 kg satellites in 620 km sun-synchronous polar orbit and 1050 kg satellite in geo-synchronous transfer orbit (GTO). “This poses a serious limitation on launching communication satellites which are heavier. The GSLV will be capable of launching satellites which are 2000 kg – 2500 kg which matches with the GSAT class of Communication satellites”, it was noted.

Currently, India is forced to outsource the heavy launch services from abroad which is not a cost effective solution The establishment of a proven GSLV launcher is the need of the hour. The successful development of indigenous cryostage will boost India’s confidence in terms of its self reliance in the launch capability, ISRO officials said.

http://www.firstpost.com/india/after-mars-mission-isro-set-to-launch-gslv-on-15-december-1211631.html?utm_source=ref_article
 
.
Now this is something I would be looking forward to!! :smile:
 
. . . .
GLSV success is far greater value than Mars mission from a point of earnings. But all the best ISRO
 
.
GSLV success will lead to Chandrayaan-2.......which will test India's capability to 'soft-land'.........
 
. . .
This is more important than the mars mission, its got earthly values:-)
 
. . .
This is the most important test as far as ISRO is considered , even important than Mangalyaan .
 
. . .

Pakistan Defence Latest Posts

Back
Top Bottom