What's new

2nd prototype of LUH lifted off.

i seriously think instead of going with kamov we should have ordered indian ones at least in the helicopter division we should not buy any stuff unless it is really best
 
ALH is 5.5 tons AUW and twin engined, LUH is 3 tons AUW and single engined, LUH will replace the Cheetahs and Chetaks of the IA and IAF.
Heard that Russia is charging 2.5 time for MII. If this works out we can go this route. DHRUV model of development seems the best way of MII.
 
Heard that Russia is charging 2.5 time for MII. If this works out we can go this route. DHRUV model of development seems the best way of MII.
What do you mean exactly?

--------------------
-------------------


DAf4tpsWsAAuZTQ.jpg:large
 
Updates on LUH program:

- 2nd prototype (with modified tailboom) flew within 8 months of 1st prototype's first flight
- 3rd (and final) prototype will be ready within the next 5 months
- Design will be frozen by the end of 2017
- IOC expected in 2018
- Production from new greenfield plant (Tumkur) in 2019-20 (intially 30/year, from 2023 60/year under phase 2)
 

Latest posts

Country Latest Posts

Back
Top Bottom